Original source · versioned page text
RFI - ATTACHMENT A - SBSMP - Rev 2
Very large file: it may take a few minutes
The original of this document is very large (13.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
20169 - SBSMP/2
Page 2
Table of Contents
1 INTRODUCTION ............................................................................................ 3
2 EXISTING SITE CONDITIONS .............................................................................. 4
2.1 The Site ................................................................................................ 4
2.2 Surrounding Area ...................................................................................... 4
3 PROPOSED DEVELOPMENT ............................................................................... 5
4 EXISTING DRAINAGE PATTERNS ......................................................................... 6
4.1 Existing Infrastructure ............................................................................... 6
4.2 Existing Drainage Patterns ........................................................................... 7
4.3 Lawful Point of Discharge............................................................................ 7
5 STORMWATER QUANTITY................................................................................. 8
5.1 Rational Method Assessment ........................................................................ 8
5.1.1 Design Storms ....................................................................................8
5.1.2 Rainfall Intensity ................................................................................8
5.1.3 Times of Concentration .........................................................................8
5.1.4 Runoff Coefficients ..............................................................................8
5.1.5 Peak Flows ........................................................................................9
5.2 Proposed Drainage Patterns ......................................................................... 9
5.3 Downstream Pipe Infrastructure Considerations ............................................... 10
5.4 XPSTORM Modelling ................................................................................. 10
5.4.1 Intensity Frequency Distribution ............................................................ 10
5.4.2 Initial and Continuing Losses ................................................................. 10
5.4.3 On-site Detention .............................................................................. 10
5.4.4 Comparison of Peak Flows at Lawful Point of Discharge ................................. 11
6 STORMWATER QUALITY ................................................................................ 12
6.1 State Planning Policy Assessment ................................................................ 12
6.2 Construction Phase ................................................................................. 12
6.3 Operational Phase .................................................................................. 14
6.3.1 Sources of Contaminants ..................................................................... 14
6.3.2 Proposed Treatment Train ................................................................... 15
6.3.3 Pollutant Export Modelling ................................................................... 15
6.3.4 MUSIC Modelling Parameters ................................................................. 15
6.3.5 MUSIC Modeling Results ....................................................................... 16
7 FLOODING ................................................................................................ 18
8 CONCLUSION ............................................................................................. 19
Appendix A DETAILED SITE SURVEY PLAN ................................................................. 20
Appendix B PROPOSED DEVELOPMENT PLANS ............................................................ 21
Appendix C NOOSA COUNCIL INTERACTIVE MAPPING DATA ............................................ 22
Appendix D NSC WATER QUALITY AND DRAINAGE CODE ................................................ 23
Appendix E STORMWATER QUANTITY CALCULATIONS................................................... 24
Appendix F CONCEPT SITE LEVELS AND DRAINAGE PLAN ............................................... 25
Appendix G BOM IFD DATA .................................................................................. 26
Appendix H XPSTORM PRE DEVELOPMENT RESULTS ..................................................... 27
Appendix I XPSTORM POST DEVELOPMENT RESULTS .................................................... 28
Appendix J XPSTORM POST DEVELOPMENT MITIGATED RESULTS ...................................... 29
Appendix K STORMWATER QUALITY AND MAINTENANCE GUIDELINES ................................. 30
Appendix L NSC FLOOD HAZARD OVERLAY MAP .......................................................... 31
Site Based Stormwater Management Plan
Proposed Townhouse Development at 101-105 Eumundi Noosa Road, Noosaville
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.