Skip to the record
The only place to find full transcripts.

Original source · versioned page text

RFI - ATTACHMENT A - SBSMP - Rev 2

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                                    Acceptable Outcomes                                    Solution1                       Comments                                    Council Use

                                                             lines either on or off the site; and
                                                        (c) temporary or permanent downpipes are
                                                             connected to the stormwater system
                                                             before laying the roof; or
                                                        (d) localised erosion is avoided by directing
                                                             flow from downpipes over non-erosive
                                                             areas.
                                                         AO14.4                                                               RO14.4
                                                         Chemical flocculants used as part of an                              The proposal complies. Refer to RO14.1.
                                                         erosion and sediment control plan do not                  
                                                         harm the environmental values within
                                                         receiving waters.
                                                         AO14.5                                                               RO14.5
                                                         Appropriately sized litter containment areas,                        The proposal complies. Refer to RO14.1.
                                                         with provision for sorting recyclables are                
                                                         provided for the type of litter expected to be
                                                         generated onsite.
Wastewater management and effluent disposal
PO15                                                     AO15
Development does not discharge wastewater                Wastewater (non-sewage) generated from
unless it can be demonstrated to not compromise          the development is collected and contained
environmental values of waters and water quality         on-site, and is;
objectives.                                             (a) lawfully disposed to sewer; or
                                                        (b) transferred off-site for treatment/disposal
Editor’s Note—Environmental values of waters                 to an appropriately
and water quality objectives are prescribed in               licenced facility;
Schedule 1 of the Environmental Protection              (c) reused on-site in a closed-cycle irrigation            N/A
(Water) Policy 2009.                                         scheme, industrial processes, washing or
                                                             cleaning or other purpose; or
                                                        (d) treated to meet the drinking water supply
                                                             environmental values prior to release.

                                                        Editor’s Note—The Plumbing and Drainage
                                                        Act 2003 sets out requirements for
                                                        wastewater management.

1
    Solution:        Acceptable Solution                                                                                                                                                          Page 9 of 10
                A/S   Alternative Solution              D:\JOBS\20-Jobs\20169 - 101 & 105 Eumundi Noosa Road, Noosaville\Civil\Reports\SBSMP\Working\Appendices\20169 - NSC Water Quality and Drainage Code 2020.docx
                N/A   Not applicable to this proposal                                                                                                                                                      Job: 20169
                                                                                                                                                                                                          Rev:      0
Site Address: 101-105 Eumundi Noosa Road, Noosaville                                                                                                                                                  30/11/2020
Log in to download the original file

RFI - ATTACHMENT A - SBSMP - Rev 2.pdf · 13.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.