Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

RFI - ATTACHMENT A - SBSMP - Rev 2

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

                                                   Rational Method Peak Flow Calculations
Job No:           20169                                                                                                                                                                                                     MORGAN CONSULTING
Job Type:         Proposed Townhouse Development                                                                                                                                                                             ENGINEERS PTY LTD
Address:          101-105 Eumundi Noosa Road                                                                                                                                                                             1 GREAT GEORGE STREET
Council:          Noosa                                                                                                                                                                                                    PADDINGTON QLD 4064


IFD Data:         26.4125 (S),153.0375 (E)                                  Minor Storm: Q10                                                                                                                                    Designed:    DY
1
I10               74mm/hr                                                   Major Storm: Q100                                                                                                                                   Checked:     HM

Post-Development A                                                                              Post-Development B                                                      Post-Development C

Time of Concentration

Standard Inlet Time                                                                             Standard Inlet Time                                                     Standard Inlet Time
     Standard Inlet Time                    5    mins                                                 Standard Inlet Time                  5   mins                           Standard Inlet Time                  5   mins


Pipe Flow                                          m                                            Pipe Flow                                        m                      Pipe Flow                                        m
               Flow distance                83                                                                Flow distance             83                                            Flow distance
              Fall of channel                     m                                                          Fall of channel                    m                                    Fall of channel                    m
               Flow Velocity              2.5     %                                                           Flow Velocity             2.5     %                                     Flow Velocity              2.5    %
                         total            0.6    mins                                                                   total           0.6    mins                                             total            0.0   mins
Concentrated Overland Flow                                                                      Concentrated Overland Flow                                              Concentrated Overland Flow
           Flow distance                          m                                                         Flow distance                       m                                   Flow distance                       m
                 velocity                 1.5    m/s                                                              velocity              1.5    m/s                                        velocity               1.5   m/s
                    mins                  0.0    mins                                                                mins               0.0    mins                                          mins                0.0   mins
   Surface type multiplier                3.0                                                       Surface type multiplier             3.0                                 Surface type multiplier              3.0
                     total                0.0    mins                                                                 total             0.0    mins                                           total              0.0   mins

                  Total tc                5.6    mins                                                           Total tc                5.6    mins                                     Total tc                 5.0   mins



Runoff Volume Calculations

      Name         Area (ha)        tc              fi     C10                                      Name         Area (ha)         tc             fi   C10                 Name          Area (ha)         tc            fi       C10
                    0.3415                        0.70     0.84                                                   0.1274                        0.50   0.80                               0.0799                         1        0.90

          Total      0.342         5.6                     0.84                                         Total      0.127          5.6                  0.80                     Total      0.080          5.0                     0.90

                  Frequency                                                                                     Frequency                                                               Frequency
      ARI                           Cy             Iy                Qy                              ARI                           Cy            Iy              Qy          ARI                           Cy            Iy                   Qy
                    Factor                                A (Ha)                                                  Factor                              A (Ha)                              Factor                                 A (Ha)
    (years)                      (Fy*C10)        (mm/h)            (m3/s)                          (years)                      (Fy*C10)       (mm/h)          (m3/s)      (years)                      (Fy*C10)       (mm/h)               (m3/s)
                     (Fy)                                                                                          (Fy)                                                                    (Fy)
      3 mth                                                        0.039                            3 mth                                                      0.014       3 mth                                                            0.010
         1           0.800        0.672           121     0.342    0.077                              1            0.800         0.640          121    0.127   0.028         1             0.800         0.721          124      0.080      0.020
         2           0.850        0.714           137     0.342    0.093                              2            0.850         0.680          137    0.127   0.033         2             0.850         0.766          140      0.080      0.024
         5           0.950        0.798           187     0.342    0.141                              5            0.950         0.760          187    0.127   0.050         5             0.950         0.856          191      0.080      0.036
        10           1.000        0.840           220     0.342    0.175                              10           1.000         0.800          220    0.127   0.062         10            1.000         0.901          225      0.080      0.045
        20           1.050        0.882           251     0.342    0.210                              20           1.050         0.840          251    0.127   0.075         20            1.050         0.946          257      0.080      0.054
        50           1.150        0.966           292     0.342    0.268                              50           1.150         0.920          292    0.127   0.095         50            1.150         1.000          299      0.080      0.066
       100           1.200        1.000           323     0.342    0.306                             100           1.200         0.960          323    0.127   0.110        100            1.200         1.000          331      0.080      0.073




                                                                                                                                 Page 1 of 1                                                                                                1/02/2021
Log in to download the original file

RFI - ATTACHMENT A - SBSMP - Rev 2.pdf · 13.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.