Skip to the record
The gold standard in government transparency.

Council archive · source document

Attachment B - Engineering Response · 132001.210127.4

of 5

Text shows just the words. Original shows the document exactly as it was published.

                                                                                     STP CONSULTANTS



As calculated in the MUSIC model, the design pollutant reductions for Noosa are achieved.




Advice Item




Response
Swept paths for a Medium Fire Truck and a Refuse Collection Vehicle are included below. Please note that the
layout shown in the Operational Works drawing set is the one that will be constructed. Architectural/Planning
layouts are to be amended to concur with this design.




STP CONSULTANTS   ACN 668 668 086   ABN 55 668 668 086   www.stpconsultants.com.au

Used in these records

About this file

File size
2.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment B - Engineering Response.pdf · 2.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.