Original source · versioned page text
RFI -Attachment 6 - Geotechnical Investigation Report CORE
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Sample History
Where samples are submitted/analysed over several days, the last date of extraction is reported.
If the date and time of sampling are not provided, the Laboratory will not be responsible for compromised results should testing be performed outside the recommended holding time.
Description Testing Site Extracted Holding Time
Chloride Melbourne Sep 08, 2021 28 Days
- Method: LTM-INO-4090 Chloride by Discrete Analyser
Conductivity (1:5 aqueous extract at 25°C as rec.) Melbourne Sep 08, 2021 7 Days
- Method: LTM-INO-4030 Conductivity
pH (1:5 Aqueous extract at 25°C as rec.) Melbourne Sep 08, 2021 7 Days
- Method: LTM-GEN-7090 pH in soil by ISE
Sulphate (as SO4) Melbourne Sep 08, 2021 28 Days
- Method: LTM-INO-4110 Sulfate by Discrete Analyser
% Moisture Melbourne Sep 07, 2021 14 Days
- Method: LTM-GEN-7080 Moisture
Eurofins Environment Testing 6 Monterey Road, Dandenong South, Victoria, Australia 3175 Page 2 of 6
Date Reported: Sep 14, 2021 ABN : 50 005 085 521 Telephone: +61 3 8564 5000 Report Number: 822393-S
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (RFI -Attachment 6 - Geotechnical Investigation Report CORE.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.