Original source · versioned page text
2021-08-16 General Committee Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING MINUTES 16 AUGUST 2021
4. Any advertising sign or device is to comply with the provisions of Council's
policies on advertising.
Nature and Extent of Approved Use
5. The approved demountable buildings must only be used to service current
enrolments and must not be used to facilitate an increase in enrolments.
6. The number of students must not exceed 1105.
7. A minimum of 328 car parking spaces must be provided on site.
Currency Period
8. This development approval lapses if the use has not happened by 20 August
2027, unless an application to extend the currency period is approved by
Council.
Land Amalgamation
9. Lot 1 on SP228052 and Lot 30 on SP170751 must be amalgamated.
Traffic
10. The drop off/pick up/ carpark configuration, accessed from the Goodchap
Street/Eumundi Noosa Road roundabout entry, as detailed in the approved
plans must be upgraded in accordance with an Operational Works approval.
11. An internal one-way vehicular link from the new staff car park to the
Goodchap Street/Eumundi Noosa Road roundabout exit as detailed in the
approved plans must be provided in accordance with an Operational Works
approval.
12. The applicant will comply with the requirements of any deed of agreement
entered into with Council with respect to:
a. The upgrade of the drop off/pick up/ carpark configuration accessed
from the Goodchap Street/Eumundi Noosa Road roundabout entry;
and
b. The provision of an internal one-way vehicular link from the new staff
car park to the Goodchap Street/Eumundi Noosa Road roundabout
exit.
ENGINEERING
Stormwater Drainage
13. The site must be provided with a stormwater drainage system connecting to
the existing school drainage system and the lawful point of discharge.
14. Any damage caused to existing services and assets as a result of the
development works must be repaired at no cost to the asset owner at the
following times:
a. where the damage would cause a hazard to pedestrian or vehicle
safety, immediately; or
b. where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing
services and assets must first be referred to the relevant service authority for
approval.
Page 11 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.