Approved Decision Notice - DBW24 0067 [AS PUBLISHED] · DBW24/0067
Site Access and Driveways
11. A sealed access driveway must be provided from Seaview Terrace to the parking and
manoeuvring areas of the development. The works must be generally in accordance with
drawing number 0111-OW2.1 Revision A prepared by SCG Consulting engineers dated 10
July 2024 and undertaken in accordance with an Operational Works approval and must
include in particular:
a. a driveway crossover generally in accordance with Council’s Standard Drawings RS-
49 and RS-050
b. removal of any redundant driveways and the instatement of the kerb and channel and
the verge area
Stormwater Drainage
12. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be generally in accordance with drawing number 0111-SW1.1
Revision A prepared by SCG Consulting engineers dated 10 July 2024 and undertaken in
accordance with an Operational Works approval.
13. Stormwater runoff from the development must be discharged to the existing Council
stormwater drainage system in Seaview Terrace and/or disposed of on-site without causing
scour or damage to the subject site or any adjoining property.
Earthworks and Retaining Walls
14. All earthworks and associated retaining structures/batters, both above and below ground
level, both temporary and permanent, must be contained entirely within the subject site
unless written permission from the respective landowner(s) is provided to Council. All
earthworks must be undertaken in accordance with the provisions of Australian Standard
AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
Damage to Services and Assets
15. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
5. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
Short Stay Letting Approval
1. Short Stay Letting (Approval SSL22/0499) is only relevant to the existing dwelling at the site.
Upon redevelopment of the site in accordance with DBW24/0067, Short Stay Letting
approval SSL22/0499 may be invalid or required amendment.
It is recommended that you seek professional advice as to how to proceed with either
renewing or amending SSL22/0499 approval.
Infrastructure Charges
2. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
made pursuant to the planning legislation and regulations current at the time of issue. For
further information, please refer to https://www.noosa.qld.gov.au/planning-
development/development-tools-guidelines/infrastructure-charges
Page 3 of 6
Document Set ID: 23263252
Version: 2, Version Date: 27/09/2024