NOOSA Checklist - Applications Involving Land
Development & Land Use Sections

a

 

IDAS APPLICATION

This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.

1. APPLICATION FORMS ~ - 7 -
1.1. Form PartA

1.1.1. Ensure that the form is fully completed.

 

 

 

 

1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required.
1.1.2.1 If there are multiple owners, the consent of each owner is required.
1.1.2.2 If the owner of the land is a company, either ACN No. or Company Seal required.
1.2. Form1 Part B-O Supporting Information

1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. CT]

1.1.2.1. Ensure that each of Forms B-O which are attached are fully completed. Ct]

2. REFERRALINFORMATION ~ __ oO ~ SD
2.1. Ensure that items 1-23 have been checked and/or completed with regard to referrals. [14

3. ° ENVIRONMENTALLY RELEVANT ACTIVITIES ~~ | , oo .
3.1. Ensure that Part G is compieted if EPA referral is required.

 

 

3.2. Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.

 

 

4. .FORM'2 = REQUEST TO CHANGE APPROVAL”: ”

4.1 Ensure that items 1-28 have been checked and/or completed including information regarding

 

 

 

 

 

 

 

 

 

 

 

 

applicant details and owners consent. MY
'5,. PLANS- Ba Te 0
5.1 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and | Operationa! [ul
Works) accompanies the application, In addition ensure that each set is complete.
5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is |
unbound.
* “SUPPORTING INFORMATION (OOO UO a a
6.1 Ensure that at least 6 copies of any report accompanies the application 6 for Reconfiguration
and Operational Works). If the application is accompanied by a covering letter, ensure that it is Y
capable of reproduction. [4
6.2 Inthe case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.
TOO FER OI Sam Or
7.1 Ensure that the application fee, as determined from the Council’s adopted scale of fees, VW
accompanies the application or has been paid.
7.2 Ensure that the fee which has been paid is recorded on the application form. |

 

 

 

Having completed this form and accepted the\gpplication, please deliver both to the following IDAS Application Receiving

trays:-

* Ifthe application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section.

¢ — Ifthe application is for an Material Change of Use & Reconfiguration - AOP1's desk in the Land Use Section.

¢ — {f the application is for Operational Works (for parking, access, sewerage or drainage) exclusively ~ AOD2 in the
Land Development Section.

*  Inall other circumstances ~ AOP1's desk in the Land Use Section.

Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.

 

 

 

SEP! g:\ant\orms\application checklist.doc
Full text of the other 36 pages

Page 2

we

INTEGRATED PLANNING ACT 1997

   

Form 2, Version 3.3, 29 May 2006

Form 2 Development Application

 

Request to change an
existing approval

 

Description of land

All land the subject of the application must be
identified.

Advice for completing Q1

A description of the land is not required in
relation to a mobile or temporary
environmentally relevant activity.

Advice for completin and Q3

Provide the information from the existing
approval that is the subject of this request for
change

Advice for completing Q4

Q4 applies if development Is proposed in a
water body or watercourse

Advice for completing Q5

Most land can be identified by a lot on plan
description. These details can be obtained from
title documents or through the local”
govemment.

However, if the land on which the development

is proposed does not have a lot on plan

description (i.e. the development is proposed in

a water body or watercourse) —

(i) provide the lot on ptan description for the
adjoining/adjacent land; or

(li) provide GPS coordinates where there Is no
adjoining/adjacent land (i.e. in Moreton
Bay).

Advice for completing Q9
Q9 does not apply if the development is
proposed within a water body or watercourse

Advice for completing Q10

Q10 only applies if development is proposed
within a tocal goverment area.

Tidal areas are below high water mark and are
Hogtwithin a local govemment's area.

Advice for completing Qt1

Q11 only applies if development is proposed on
strategic port land or a strategic port land tidal
area.

For more information refer to Guide 14
Development on strategic port land

Note: These details will be included in the
original decision notice for the approval you
now wish to modify,

 

10.

11.

Street address (including house number, street name, suburtYlocality name & postcode) (if applicable)
[ 12 Park Rd, Noosa Heads

a

 

Number on existing development permit or 3. Date issued:
preliminary approval sought to be changed:
[N/A | [Na

 

Name of water body or watercourse, within which the development is proposed: (if applicable)
[ N/A

 

Lot on plan description (eg. Lot 123 on RP 4567)/GPS coordinates
[ Lot 54 on RP 52918, Parish of Weyba ‘|

The above description is for: (tick applicable box)

EX] (i) the land on which the development is proposed; or

LC (ii) the tand adjoining the water body or watercourse, within which the development is
- proposed;-or . .

Ci) the water body or watercourse. tee

Shop / tenancy number: (if applicable)

8. Storey / level: (if applicable)
[N/A

[ N/A

_|

Total area of land: (m?/ha)
| 794m2

_|

Local government area in which the land is situated (eg. Brisbane, Esk, Hervey Bay, Woocoo etc.) (if
applicable) _
[ Noosa Shire Council |

 

Port authority for the strategic port land or strategic port land tidal area on which the
development is proposed (eg. Port of Brisbane, Port of Townsville) {if applicable)
[NIA

 

   
  

  
     
 

RECEIVED
02 AUG 2007

NOOSA SHIRE Counc)
FRONT COUNTER t

 

 

Qsey4 BA
13/2207 270182

Page 3

INTEGRATED PLANNING ACT 1997

Form 2, Version 3.3, 29 May 2006

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Applicant details 42. Name:
Cleary identify who is making the application. | Design Inc Brisbane C/- Martoo Consulting Pty Ltd ‘|
The applicant need not be the owner of the
land. 13. Postal address:
When signing and lodging this application 7
The applicant is responsible for ensuring the | PO Box 1684, Noosa Heads Q_ 4567 ‘|
information provided is correct. The .
assessment manager, any referral agency and | 14. Signature: i 15. Date:
the Chief Executive (where applicable) will rely C
on this information when assessing and [AL August 2007
deciding the application. 9
Ifthe applicant is a company
A contact person must be shown. All 16, Contact person:
correspondence will be mailed to this address. | Hannah Blue |

17. Telephone number: 18. Mobile number: (if applicable)

| 5455 5425 [ N/A |
19, Fax number: (if applicable) 20. Email address: (if applicable)
| 8455 §725 | [ [email protected]
Land owner/s consent (f applicable) 21. Land owner’s consent:
Section 3.5.24(3) of the IPA requires that the i "
Jand owner's consent must be provided if the Name In Full Signature Date
person making the request to change an (i) see attached
existing approval is not the fand owner.
For information about land owners refer to me
Guide 1 Making an IDAS development (ii)
application.
Land owner's consent Is not required for a (iii)
mobile or temporary ERA.
lfan owner has signed thisform.as _ . (iv)
applicant, their signature is not required again
in this section. -
Hf there are multiple owners, the consent of
gach owner fs required,
Resource entitlement (if applicable) 22. At the time of the request, would a development application for the approval have required
Sections 3.5.22(4) & (5), 3.5.24(3B) & (3C), evidence of resource entitlement?
and 3.5,33(3B) & (3C) of the IPA may require
the written agreement of a resource manager if x NO - go to a24 O YES - go 10.023
the request involves a prescribed State ‘ ‘ ‘ i ;
resource, f when the request was made a 23. Is this request accompanied by the written agreement of the chief executive from whom the
development application for the approval would evidence is required? (tick the applicable box)
have required evidence of resource entitlement {J NO - the written agreement of the chief executive must accompany this request
under section 3.2.1(5) of the IPA. oO YES
Nature of the request 24, This request is for:
aba may request to modify an existing (An extension of the relevant period for the development approval (s 3.5.22)
. LD To change or cancel conditions (s 3.5.33)
To change the development approval (other than a change of a condition) (s 3.5.24)
(1A change to conditions of a rezoning approval given under the P&E Act (s 6.1.354)
25. Provide details of, & justification for, the proposed modification
50m2 extension of the lower level of the existing dwelling house.

Concurrence agencies 26. Did the previous application involve concurrence agencies or building referral agencies?

Under s3.5.22(1)(a) & 3.5.24(1){a) of IPA, a
copy of this request must be forwarded to each
concurrence agency for the previous
application prior to lodgement of this form with
the assessment manager.

Note: “No” will always apply to a request to
change conditions of a rezoning approval given
under the P&E Act.

 

XX No

oO YES - fist the concurrence agencies who have been sent a copy of the request for modification
(i)

(ii)

(ii)

 

 

 

 

 

 

 

Page 4

o

INTEGRATEO PLANNING ACT 1997

Form 2, Version 3.3, 29 May 2008

 

Applicant dotalls ~ 12.

Clearly Kentify who Is making the application. .

The appicant need not be the owner ofthe =

fend 143
lt Icatlo:

The applicant ls responsibie for ensuring the
Information provided fs correct. The
assessment manager, any referal agency and 14,
the Chief Executive (where applicable) will raly
on this Information when assassing and
deciding the application,

[tthe applicant ts a company

A contact parson must be shown. Ail 16.
correspondence wil ba mailed to this address, | - .

147,

19.

-Fax number: (epplcebia)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Name:
. Postal address:

Signature: 45. Date:

-Contact person: .
Telephone number: 48, : Mobile number: {if applicable)

 

20. ..Email address: (if applicable

JL |.

 

 

Land ownerls consent (if applicab’) 21.
Secton 3.5.24(3) of the IPA requires that the
Jand owner's consent must be provided If the
person mang the request fo change an
existing approval is not the land owner,
For Information aboul fand owners refer to

tH

Lapd owner's consent §s not required for a
Mobile of temporary ERA.
Stan owmer has glaned this form as
applicant, thelr signature Is not requlted agaln
Inthls section, *.

0 mull
each owner ls required,

Resource entitlement (if applicable) :}22,

Sections 3.5.22(4) & (5), 3.5.24(8) & {3C),
and 3,5.33(38) & (3C) of the IPA may require
the wilten agreement of a resource manager Hf
the request Involves a prescribed State “193,
resource, f when the request was made a -
development application for the approval would
have required evidence of rasource entitlement
under section 3,2.1(5) of the IPA.

the consentof -

Land owner's consent:

10

 

Name In Full
 AZEGGeY WOALeY

Signature Date

Sroctsar,_|orlea/é>) *
Qi) yt aN v + 7
(i)
(v)

 

 

 

 

 

 

 

 

 

At the time of the request would @ development, appicatn, for the approval have waited
evidence of resource entitlement? . : wen .

CCINO - goto 024 “TV YES - goto. 029

. Is thls request accompanied by the written agreement of the chit executive from whom the
evidence Is Tequired? (tick the applicable box) .

oO NO ~ the written agreement of the chief execuive must eccompenty this eu
‘Yes

 

 

Nature of the request 24,

Any person may request to modify an extn
approval.

| 25,

This request Is for:

* 17] An extension of the relevant period for the development approval a a 6. 2)
: [1 To change or cancel conditions (s 3.6.33) - :

* [1 To change the development approval (other than @ change of condition) {8 3.5.24)
(IA change to conditions of a rezoning approval given.under the P&E Act {3 6.4.35A)

Provide details of, & Justification for, the proposed modification

 

 

 

 

 

 

Concurrence agencies 26.
Under $3.5.22(4}(a) & 3.5.24(1}(a) of IPA, 8
copy of this request must be forwarded to each
concurrence agency for the previous
application prior to lodgement of this form vith j°
the assessment manager.

Note: *No* will akvays apply to 3 request to
change conditions of a rezoning approval glven
under the P&E Act

 

Did the pravious application involve concurrence agencies or building referral agencies?
No : .

(YES - fist the concurrence agencies who have been sent @ copy of the request for modification

(i)

(i)

i)

 

 

 

 

 

 

 

Page 5

>

INTEGRATED PLANNING ACT 1997
Plans and documents

An application should be accompanied by
details to support the proposal & enable the
assessment manager, referral agencies and
any person viewing the appfication during
public scrutiny or public notification to
understand the scope of the proposal and any
Potential impact.

 

Form 2, Version 3.3, 29 May 2006

27. Plans/drawings/reports accompanying this application:

 

Plan / Drawing / Report Number

Title

Date

 

P00925 LO1 HB

Proposal Report (including plans)

2 August
2007

 

 

 

 

 

 

 

 

 

 

OFFICE USE ONLY (applicable to assessment manager)

 

DATE RECEIVED

 

 

REFERENCE NUMBER/S

 

 

 

 

 

Page 6

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007

      

  

Form 1 Development Application

IDAS Assessment
Checklist

{Formerly the “Referrals Checklist”)

 

IMPORTANT NOTE FOR ALL APPLICANTS:
1. This checklist was formerly referred to as the “Referrats Checklist’. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
“Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.

2. Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensland State entities (e.g. Environmental Protection
Agency, Dept. of Natural Resources and Water, Queensland Heritage Council etc.}.

3. This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant to
determine the assessment manager’ for the application.

Therefore, the completion of all questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B onty).
tis the responsibility of the applicant to accurately complete this checklist.

Section 2 is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005.

Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.

The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to identity

any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers referral coordination?.
9. — Toassist you in answering the following questions a series of guides are available free from the IPA website www.ipa.qid.gov.au. Guide 25 explains the role of the IDAS
Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application.
40. Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
— yoww.ipa.qid.gov.au,
11. Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006.

PNOoS

 

SECTION 1 - STATE ASSESSMENT (completion mandatory)

Note: The following state assessment triggers apply to development other than for building work assessable against the Building Regulation 2006,

 

 

Environmentally relevant activity 1. The application involves: (tick applicable box/es)

For more Information refer to Guide 4. (i) an environmentally relevant activity (ERA) for which a code for environmental compliance

Unless you answered ‘none af the above" to Qt, has not been made - complete Part G of Form 1
the application requires assessment by the —

administering authority3. C1 (i) a mobile or temporary ERA for which a code of environmental compliance has not been
{fan entity, other than the administering made - complete Part G of Form 4
authority, is the assessment manager for the &X (iii) none of the above

application, the administering authority Is a
concurrence agency for the application in relation
to this matter.

Note: An application involving ERA 19 and/or 20
will also require completion of Part Kr of Form 1
for approval where an allocation under the Water}
Act 2000 is required.

 

 

Continued overleaf

 

PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checklist (if applicable).

 

OFFICE USE ONLY (applicable to assessment manager)
|__ DATE RECEIVED | _ REFERENCE NUMBERIS |

 

 

1 The assessment manager is responsible for assessing and deciding an !DAS application. The assessment manager for an application is prescribed in schedule 8A of the IPA.

2. For additional information refer to Guide 6 ‘Does my application trigger the referral coordination process?’

3° The ‘administering authority’ may be either the Environmental Protection Agency, the relevant local government (for a devolved ERA) or the Queensland Department of Primary Industries and
Fisheries (for a delegated ERA).

Page 1

Page 7

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

 

 

State-controlled road matters 2. The application involves: (tick applicable box/es)
For more information refer to Guide 3. . .
_ levelopm in controll for - .
Unless you answered “none ofthe above’ to 02, Di) development on land contiguous’ to a State ! trolled road and
the application tiggers referral to the Department 1D @ material change of use assessable against the planning scheme;
of Main Roads (DMR) as a referral agency. . .
In certain cicumstances DMR will be an advice oO (b) reconfiguring a lot unless A .
agency, while in other circumstances DMR will « the total number of lots is not increased; and
be a concurrence agency. « the total number of lots abutting the State-controlled road is not increased;
Schedule 2 ofthe IF Regulation vil assist you to Ow operational work (not associated with a material change of use assessable against the
concurrence agency for the application. planning scheme or reconfiguring a lot mentioned in (b) above}-
* associated with access to a State-controlled road; or
© for filling or excavation; or
« involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
C1 (ii) development on land not contiguous to a State-controlled road and -
C1 (a) material change of use -
assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
[1 (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP tegulation
and exceeding the thresholds set by that schedule;
(1 () operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)—
« assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
EX (iii) none of the above
Clearing vegetation 3, The application involves: (tick applicable box/es)

For more information refer to Guide 42,

Unless you answered “none of the above" to Q3,
the application requires assessment by the
Department of Natural Resources and Water
(NRW).

fan agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in relation
to this matter.

Ifyou ticked Q3(i) or (ii), your application requires
teferral to NRW for assessment regardless of
whether vegetation clearing is proposed or not.

(1 ())_ material change of use -
(a) assessable against the planning scheme;
(b) on a lot containing -
* acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
« if there is no property map of assessable vegetation for the lot - remnant vegetation;
(c) where the existing use of the land is a rural or environmental use; and
(d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
reconfiguring a lot-
(a) on alot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
where the size of the lot before the reconfiguration is 2 hectares or larger;
{c) where 2 or more lots are created; and
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
{b) not associated with a material change of use assessable against the planning

scheme mentioned in (i) or reconfiguring a lot mentioned in {ii) - complete Part J of
Form t

EX] (iv) none of the above.

Oil)

(b)

D Gi)

 

Strategic port land

For more information refer to Guide 11.

lf you ticked (i) - the retevant Port Authority is the
assessment manager for the application.

Wfyou ticked (i) Queensland Transport is a
concurrence agency for the application.

 

The application involves:

C1 (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (Ti
Act) - complete Part ! of Form 1

O (ii) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part | of Form 1

EX (iii) none of the above

 

4 Land contiguous to a State-contralled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-controtled road; o¢ that is part of a future State

controlled road.

Page 2

Page 8

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

 

Acid sulfate soils 5. The application involves development on land situated in an identified’ tocal government area
For more information refer to Guide 10, and where the surface of the land is: (tick applicable box)

Unless you answered “none of the above” to Q5, [1 (i) below 20m AHDS and the development will involve the excavation of 1000m3or more of
the application requires assessment by

Department of Natural Resources and Water
(NRW).

If an agency other than NRW is the assessment
manager for the application, NRW is an advice
agency for the application in relation to this
matter.

soil or sediment at or below 5m AHD, or

LD (i) at or below 5m AHD and the development will involve filling the site with 1000m? or more
of material

{1 (iii) none of the above

 

Major hazard facilities or possible 6.

major hazard facilities

For more information refer to Guide 17.

if you answered “YES” to Q6, the application
requires assessment by the Department of
Ememency Services (DES).

If an agency other than DES is the assessment
manager for the application, DES is a
concurrence agency for the application in
relation to this matter.

Does the application involve a material change of use for a major hazard facility or possible
major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?

EX] No

(11 YES - complete Part L of Form 4

 

Water related development under the | 7.

Water Act 2000

For more information about items (a) - (f), refer
to Guide 1§. For more information about item
(g), refer to Guide 14 Does my appfication
involve assessment of a referable dam?

Unless you answered "none of the above" to Q7,
the application requires assessment by the
Department of Natural Resources and Water
(NRW),

If an agency other than NRW is the assessment
manager for the application, NRWis a
concurrence agency for the application in
relation to this matter.

The application involves:
[1 (i) operational work, for taking or interfering with water under the Water Act 2000, that is:

{tick applicable box/es)

L (a) ina watercourse, lake or spring, (eg. a pump, gravity diversion, stream re-direction, weir or

dam) - complete Part K:, Ks, Ks, Ke, or Ks of Form 1 whichever is applicable;

(J (b) for an artesian bore anywhere in the State, no matter what the use - complete Part

Ky of Form 7;

(1) (©) for a subartesian bore, in declared subartesian area’, or in a certain area covered
by a water resource plan, for use for purposes other than stock and/or domestic
use - complete Part K; of Form 1;
for a subartesian bore, in certain declared subartesian areas, for use for stock

. . and/or domestic purposes - complete Part K: of Form 1,
(1 (e) for taking overland flow water in certain areas covered-by a-water- resource plan
— complete Part Ka of Form 1;
{Ff} for interfering with overland flow water in a drainage and embankment area -
complete Part Kioof Form 1
[1 {g) for constructing a referable damé or works that will increase the storage capacity
of a referable dam by more than 10% - complete Part Ks of Form 1; OF

{XJ (ii) none of the above.

Dd)

 

 

Removal of quarry material from a 8.

watercourse
For more Information refer to Guide 16,

If you answered “YES” to 08, the appfication
tequires assessment by the Department of
Natural Resources and Water (NRW).

Hf an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
relation to this matter.

Note: Part G of Form 1 is required to be
completed as the activity of removing quarry
material from a watercourse is also an
Environmentally Relevant Activity (ERA).

 

Does the application involve development for the removal of quarry material from a watercourse?
requiring an allocation notice under the Water Act 2000?

No

(C1 YES - complete Parts Kr and G of Form 1

5 The identified tocal government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cootoola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirlum Vale, Momington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.

Australian Height Datum (AHD).

Tha declared ground water areas are listed in Guide.
Referable dam is defined under the Water Act 2000.
Watercourse is defined in sch 10 of the IPA.

Oana

Development in a

atchment area.

Page 3

Page 9

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

 

 

 

 

Operational work that is tidal work or |9. The application involves operational work that is: (tick the applicable box/es)
work in nennn we eeu te ret (1 (i) tidal work"? as defined under the Coastal Protection and Management Act 1995 (the
more information about prescribed tidal work in Coastal Act) that is not prescribed tidal work ~ complete Part M of Form 1; OF
local goverment él areas refer o Guide 24.) [7] (i) tidal work that is prescribed tidal work"" other than in a canal’? -complete Part P of Form 1; 0f
he lector esas seecenentty te *. C1 (iii) carried out within a coastal management district under the Coastal Act and for - complete
Environmental Protection Agency (EPA). Part M of Form 1 if any box/es (a) to (i) below are ticked.
fan agency other than EPA is the assessment (1 (a) constructing or installing works in a watercourse between MHWS and HAT (le.
Fares eo acacy ate appcsion in other than those works in tidal water) where the development has been determined not
relation to this matter. to be assessable against the Water Act 2000;
ol ple wanaenaaliaiaiadiadl {1(b) constructing a canal’? intended to be connected to tidal waters;
{1 (c) constructing an artificial waterway;
CO (d)_ reclaiming tand under tida! water;
C1 (e) disposing of dredge spoil or other solid waste material in tidal water;
C1 (f) _ interfering with quarry material on State coastal land above high-water mark;
(1 (g)_ draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
(C1 (h)_ removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
(1 (i) constructing a bank or bund wall to establish a ponded pasture on fand, other
than State coastal land, above high-water mark; or
{iv) none of the above.
Operational work below high water | 10. The application involves operational work that is: ( tick the applicable box/es)
mark itonmaton celerto Guide 18, For (1 (i) tidat work"? as defined under the Coastal Protection and Management Act 1995 (the
more information about prescribed tdal work in Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or
local goverment tidal areas refer to Guide 24, C1 (ii) tidal work that is prescribed tidal work"4 - complete Part P of Form 1; of
O10, he apclentn tigoes cetera ero C1 (iii) carried out within a coastal management district'S under the Coastal Act and for -
Se aarsnon fa Wartime Safety Or) cispasing of dredge spoil or other solid waste material in tidal water - complete Part
foal presobed tal wo mance C1 (b) reclaiming land under tidal water - complete Part M of Form 1; or
(J (c)_ constructing a canal’?, if the canal is associated with reconfiguring a lot - complete
Part M of Form 1;
(iv) none of the above.
Coastal management 11. The application involves: (tick the applicable box/es)

For more information refer to Guide 18.

Unless you answered “none of the above" to
Q11, the application requires assessment by the
Environmental Protection Agency (EPA).

Hf an agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the apptication in
relation to this matter.

 

 

C{i) a material change of use assessable under a planning scheme involving operational
work carried out completely or partly in a coastal management district'5

CD (ii) a material change of use assessable under a planning scheme involving building
work, carried out completely or partly in a coastal management district that is —
« the construction of a new premises with a GFA" of at least 1000m?2
« the enlargement of the GFA of existing premises by more than 1000m?

CI (iii) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district

(1) (iv) reconfiguring a lot’ assessable under schedule 8 of the IPA and in connection with
the construction of a canal'2 — complete Part M of Form 1

(v) none of the above

 

10 Tidal work is defined in sch 10 of the IPA.

11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area,
12 Canal means canal as defined under the Coastal Protection and Management Act 1995

13 Tidal work is defined in sch 10 of the IPA.

14 Prescribed tidal work Is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.

15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2} of that Act.

16 GFAis defined in sch 14 of the IPA to mean the gross floor area, For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.

17 Under s117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the application for the operational works to construct the artificial waterway.

Page 4

Page 10

INTEGRATED PLANNING ACT 1997.

Development within the limits of a

port

For more information refer to Guide 18. For

information about prescribed lidal work refer to

Guide 24.

Ifyou answered “YES” to Q12, the application

triggers referral to the Port Authority.

The Port Authority is a concurrence agency if the

development is -

® within 200m of a shipping channel or an entty
and exit shipping corridor for the port

« within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoil
grounds;

© within 1000m of a planned port facility
identified in a land use plan approved under
the Transport infrastructure Act 1994.

In all other situation the Port Authority is an

advice agency.

IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve development below high water mark’8 and within the limits of a port
under the Transport Infrastructure Act 1994?

J No

[C1 YES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work

 

 

Marinas

For more information refer to Guide 18. For
information about whether a marina is prescribed
tidal work refer to Guide 24. The local
goverment is the assessment manager for all
prescribed tidal work.

if you answered "YES" to 013, the application
triggers referral to Queensland Fire and Rescue
Service as an advice agency.

13.

Does the application involve operational work that is tidal work for a marina’? with more than 6
vessel berths?

KINO

(YES - comptete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work

 

Tidal works in strategic port land tidal
areas
For more information refer to Guide 18.

Unless you answered “NO” to Q14, the relevant
Port Authority is the assessment manager for the
application and the Environmental Protection
Agency (EPA) and Queensland Transport (QT)
are concurrence agencies for the application.

Herltage

For further information refer to Guide 19.

Hfyou answered "YES" to Q15, the application
triggers referral to the Queensland Heritage
Council as concurrence agency for the
application.

 

Unless you answered “none of the above" to
Q15(b), the application involves referral to the
Environmental Protection Agency as an advice
agency for the application

=

15.

4,

Does the application involve tidal works within a strategic port land tidal area20?
I No

[YES - complete Part M of Form 1

Does the application involve development in a heritage registered place as defined under the
Queensland Heritage Act 1992?

No

(1 YES - complete Part C of Form 1

15(b)The application involves: (tick applicable boxes)

(1 (i) — amaterial change of use assessable against the planning scheme and the lot shares a
common boundary with a protected area or registered place under the Queensland
Heritage Act 1992;

D (ii) reconfiguring a lot if the lot shares a common boundary with a protected area or
registered place under the Queensland Heritage Act 1992;

(ii) none of the above.

 

Declared catchment areas

For more information, including a list of the
declared catchment areas within Queensland,
refer to Guide 13.

Unless you answered “none of the above" to
Q16, the application requires assessment by the
Department of Natural Resources and Water
(NRW).

if an agency other than NRW is the assessment
manager for the application, NRW Is a
concurrence agency for the application in
telation to this matter.

 

 

16.

The application is in an area declared to be a catchment area under the Water Act 2000 and
involves: (tick the applicable box/es)

(C1 (i) reconfiguring a lot if any tot resulting from the reconfiguration is less than 16 hectares;
LD (ii) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994;
EX (iii) none of the above

 

18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
19 Marina is defined in the Transport Operations (Maritime Pollution) Regulation 1995.
20 Strategic port land tdal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land.

Page 5

Page 11

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

 

 

Contaminated land 17. The application involves: (tick the applicable box/es}
Applications involving material change of use i i i i. -
and or reconfiguring a lol may tigger this Ow reconfiguring alot for which all of part of the premises are
referral. (a) premises mentioned in the IPA, schedule 8, part 1, table 2 ~
For more information refer to Guide 5. « item §, including the exemption otherwise provided for by paragraph (d);
Unless you answered ‘none of the above" to « item 6, including the exemption otherwise provided for by paragraph (e); or
Q17, the application requires assessment by the « item 7, including the exemption otherwise provided for a mining activity or petroleum
Environmental Protection Agency (EPA). ff an activity: or
agency other than EPA is the assessment s ty, . . .
manager for the application, EPA will be a (b) in an area for which an area management advice has been given for unexploded
concurrence agency for the application in ordnance - complete Part N of Form 1
felation to this matter. 7 .
C1 (ii) a material change of use -
(a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if all or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1
EX] (iii) none of the above
Electricity infrastructure 18. The application involves: (tick the applicable box/es)

For more information refer to schedule 2of the IP
Regulation.

Unless you answered “none of the above" to
Q18, the application triggers referral to the

agency to which the easement is qranted in
favour of as advice agency.

 

(1 (i) reconfiguring a lot where any part of the lot is ~

subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or

« situated within 100m of a substation site;

a material change of use, assessable against a planning scheme and not associated

with reconfiguring a lot if ~

* any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and

any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;

a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site;

operational work thatis filling or excavation assessable against the planning scheme,
not associated with reconfiguring a lot, if -

* any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;

the work is located wholly or partly within 10m of a substation site;
EX] (v)_ none of the above.

Diii

Oi)

Ow)

 

 

 

Land designated for community
infrastructure

Applications involving development on land
designated for community infrastructure may
tigger this referral.

For more information refer to schedule 2 of the
IP Requtation.

Ifyou answered “YES” to Q19, the application
requires assessment by the chief executive of
the department administering the Act authorising
the development for the designated purpose,
{fan agency other than the designator is the
assessment manager for the application, the
designating agency will be a concurrence
agency for the application in relation to this
matter.

 

Does the application involve development assessable against the planning scheme and on {and
designated for community infrastructure?

(i) intended to be supplied by a public sector entity; and
(ii) on land not owned by or on behalf of the State; and
(ii) other than development —

(a) for the designated purpose; or

(b) carried out by, or on behalf of, the designator.
No
OyYes

 

Page 6

Page 12

INTEGRATED PLANNING ACT 1997
SEQ Regional Plan

For more information refer to schedule 2 of the
IP Regulation.

Refer to Chapter 2, part 5A and schedule 10 of
the Integrated Planning Act 1997, and schedule
2 of the Regulatory Provisions for relevant
definitions.

Unless you answered “none of the above" to
Q20, the application requires assessment by the
Office of Urban Management (OUM).

Fisheries matters
For more information refer to schedule 2of the IP
Requlation.

Unless you answered “none of the above” to
Q21, the application requires assessment by the
Department of Primary Industries and Fishertes
(OPI&F).

tf an agency other than DPIGF is the assessment
manager for the application, DPI8F is a
concurrence agency for the application in

Felation to items (\} — (iv) and an advice agency
in relation to item (v).

IDAS Assessment Checklist, Version 20, 2 April 2007
20. The application involves (tick applicable box/es) -
(1 @ amaterial change of use of premises —
(a) in a Major Development Area in the Urban Footprint for -
0 (i) anurban activity -
(1 inan area included in a structure plan where the IPA, section 3.1.6
applies;
(2 inan area not included in a structure plan where -
« the IPA, section 3.1.6 applies to the application for the material change
of use; or
« the premises exceeds 10,000m2; or
the gross floor area (GFA) on the premises will exceed 10,000m2; or
« impact assessment is required under the relevant planning scheme
C1 (i) intensive animal husbandry, or

(1 (ii) residential development involving a rural residential purpose

(b) in the Regional Landscape and Rural Production Area for -
1 (i) anurban activity and not specified in section 2.4(2); or
LC (ii) residential development involving a rural residential purpose and not
specified in section 2.6(2)
(c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);

(d) in the investigation Area for -
OO (i) anurban activity and not specified in section 2.10(2);
(© (ii) residential development involving a rural residential purpose and not

specified in section 2.12(2); or
O (ii) intensive animal husbandry
{ii} reconfiguring a lot-
On land in a Major Development Area in the Urban Footprint that is:
(a) not included in a structure plan; and
(b) not specified in section 3.1(2).

(iii) none of the above

O

4
21. The application involves: (tick the applicable box/es)

(Ii) an assessable material change of use for aquaculture - complete Part O; of Form 1;

C1 (ii) assessable operational work that is the construction or raising of a waterway barrier -
complete Part O3 of Form 1;

C1 {iii) assessable operational work completely or partly within a declared fish habitat area-
complete Part O2 of Form 1;

C1 (iv) assessable operational work that is the removal, destruction or damage of a marine

plant - complete Part O2 of Form 1;

OW)

development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area;

 

EX (vi) none of the above.

Page7

Page 13

INTEGRATED PLANNING ACT 1997

Integration of land use and public
transport

For more information refer to Guide 23, schedule
8A of the IPA, & schedule 2 of the iP Requiation.
Uniess you answered “none of the above’, the
application triggers referral to QT as a
concurrence agency.

 

IDAS Assessment Checklist, Version 20, 2 April 2007

22. The application involves: (tick the applicable box/es)—

LO (i) a materia! change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that

schedule.
LC (ii) reconfiguring a fot—

[1(@)__ on land that is completely or partly within a public transport corridor, and the
total number of lots increases;

(1b) ontand that is completely or partly within a future public transport corridor or
an airport's public safety area;

(©) __ onland that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;

(1d) for a residential purpose within the 25 ANEF contour for an airport;

(J (e) for a residential purpose resulting in 100 or more allotments.

O (iil) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in {i) above or reconfiguring a lot mentioned in (ii)
above, on land that—

 

 

(a) _ is completely or partly within a public transport corridor or a future public
transport corridor;
(7) (b) __ will result in work that encroaches into an airport's operational airspace.
& (iv) none of the above.
Railway safety and efficiency 23. The application involves: {tick the applicable box/es)—
For more information refer to Guide. 23, schedule i) a material change of use assessable against the planning scheme for a purpose
BA of te [PA & schedule Potine I Reautation ulation, De mentioned in schedule 13D of the IP Regulation end exceeding the thresholds set by that
Unless you answered “none of the above”, the
application triggers referral to QT as a schedule.
concurrence agency. 0 (ii) reconfiguring a lot—
O(a) ontand that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;
(1 (b) on tand that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater;
C1 (c)  onland that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;
(4 @) _ onland that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;
Ole) onland that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
(1 (f) for a residential purpose resulting in 100 or more allotments.
D (iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m3, on land that—
(2) _ is completely or partly within rail corridor and or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
[1 (b) _ is completely or partly within future railway land, or a railway tunnel easement;
(1 (©) abuts rail corridor land, commercial corridor tand or future railway land, and
the work is within 25m of the railway boundary.
(iv) none of the above.
Moonie to Brisbane pipeline 24. The application involves the easement for the construction or operation of the Moonie to

For more information refer to schedule 2of the IP
Reguiation.

Unless you answered “none of the above’, the
application triggers referral to the holder of
Pipeline licence No 1 issued under the Petroleum
Act 1923, currently Santos QNT Pty Lid, for
advice.

 

Brisbane strategic pipeline, and involves: (tick the applicable box/es)—

(i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement.

O (ii) reconfiguring a tot

C1 (i) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.

K (iv) none of the above.

 

\

Page 8

Page 14

INTEGRATED PLANNING ACT 1997

Koala habitat area

For more information, refer to Guide 26 and
schedule 2 of the IP Requiation.

Unless you answered “none of the above’, the
application requires referral to the Environmental
Protection Agency as a concurrence agency.

Wild river area

For more information, refer to Guide 27

Hyou answered YES to Q26, you must also
complete section 2 of this checklist. This will
enable you to determine if your application can
proceed in a wild river area and which referral
agency will assess your application against the
Wild Rivers Code, or if the proposed
development is “prohibited” in a wild river area.
Note: Development can be ‘prohibited’ in a wild
river area because the application cannot be
accepted by the assessment manager.

Preliminary Approval

if you answered YES to Q27, the application
triggers referral to the Department of Local
Government, Planning, Sport and Recreation as
an advice agency.

IDAS Assessment Checklist, Version 20, 2 April 2007

25. The application involves: (tick the applicable boxes) —

(i) a material change of use of premises in a koala conservation area or koala
sustainability area made assessable under a planning scheme, that is not for a domestic
activity and will result in —

LJ (a) clearing of native vegetation over an area greater than 2500m?;

(7 (b) anew building and any reasonably associated structure with a total footprint
greater than 1000m2,

(1 (ce) an extension to an existing building and any reasonably associated structure if
the extension has a total footprint greater than 1000m?;

(0 (d)_ extracting gravel, rock or sand from an area greater than 5000m?;

(1 (e) excavating or filling an area greater than 5000m2;

(1) additional traffic in a koala conservation area or koala sustainability area,

between 6p.m. on a day and 6a.m. on the following day.

CO (ii) reconfiguring a fot in a koala conservation area or koala sustainability area that will
result in -

(J (a) an increased number of lots;
(21 (b) clearing of native vegetation over an area greater than 2500m?.

C1 (ili) operational work in a koala conservation area or koala sustainability area made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a fot mentioned in (ii) above) that will result in the clearing of native vegetation
over an area greater than 2500m?.

D0 (iv) operational work in a koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with a material change of use
mentioned in (i) or reconfiguring a fot mentioned in (ii) above) that is not for a domestic activity
and will result in -

C1 (a) clearing of native vegetation over an area greater than 2500m?;
(1 (b) extracting gravel, rock or sand from an area greater than 5000m?;
L() excavating or filling an area greater than 5000m2.

EX] (v) none of the above.
26. Does the application involve development in a wild river area declared under the Wild Rivers Act
2005?
INO
OO yYes

27. Does the application involve a development for which preliminary approval is sought under
Section 3.1.6 of the Integrated Planning Act 1997?

No
ClyYes

 

 

Wetlands

Domestic activity means the constuction or use
of a single residence on a lot and any reasonably
associated building or structure. Examples of a
building or structure that could be reasonably
associated with a single residence include:
caretaker's residence, granny flat, building or
structure used for a home business.

Note: Wetland Is defined in the Integrated
Planning Regulation 1998.

Unless you answered “none of the above” to
Q28, the application involves referral to the
Environmental Protection Agency as an advice
agency for the application.

28. The application involves: (tick the applicable boxes) -
O1(i) — amaterial change of use, other than for a domestic activity, assessable against the
planning scheme that is in or within 100m of a wetland;

Dil) reconfiguring a lot -
In or within 100m of a wetland that will result in
1 (@) more than 10 lots being created; or
LJ (b) lots less than 5 hectares;

1 (ii) none of the above

 

Page 9

Page 15

INTEGRATED PLANNING ACT 1997
Conservation Estate

Urban purposes is defined in the Integrated
Planning Act 1997 as “purposes for which land is
used in cities or towns, including residential,
industrial, sporting, recreation and commercial
purposes, but not including environmental,
conservation, rural, natural or wildemess area
purposes”,

Unless you answered “none of the above” to
Q29, the application involves referral to the

Environmental Protection Agency as an advice
agency for the application.

 

IDAS Assessment Checklist, Version 20, 2 April 2007
29. The application involves: (tick the epplicable box/es)—
(1 (i) a material change of use for urban purposes that is in or within 100m of any of the
following -
CI (a) aprotected area, forest reserve, critical habitat or area of major interest under
the Nature Conservation Act 1992;;
(1 (b) a State forest or timber reserve under the Forestry Act 1959;
(©) amarine park under the Marine Parks Act 2004;
(J (d) a recreation area under the Recreation Area Management Act 1988;
(11(e) a world heritage area listed under the World Heritage Convention;
(1 (f) Brisbane forest park under the Brisbane Forest Park Act 1977.
CD (ii) reconfiguring a lot if -
(1 (2) any part of the lot is situated in, or within 100m of, any of the following -
(i) ~~ a protected area, forest reserve, critical habitat or area of major
interest under the Nature Conservation Act 1992;
(ii) a State forest or timber reserve under the Forestry Act 1959;
(ii) a marine park under the Marine Parks Act 2004;
Ci(iv)  arecreation area under the Recreation Area Management Act 1988;
(J (v) _ aworld heritage area listed under the World Heritage Convention;
Brisbane forest park under the Brisbane Forest Park Act 1977; and
(1 (b) the reconfiguration involves more than 10 tots being created, or any lot
resulting from the reconfiguring is less than Sha;
(iii) none of the above.

 

Page 10

Page 16

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

SECTION 2 - ASSESSMENT IN A WILD RIVER AREA

(completion mandatory if the proposed development is located in a wild river area)

 

 

Wild River Area

it the responsibility of the applicant to
determine if the development Is proposed in
a wild river area.

Information about wild river areas including the
geographical location and position of
management areas in relation to properties, can
be accessed by contacting the Department of
Natural Resources and Water (NRW), accessing
the department's website www.nrw.qld.qov.au or
contacting the department by email on:

wild [email protected]

Note on Referrals

Referrals for development in a wild river area
(other than for agricultural activities and animal
husbandry activities) are not changed from the
existing referral arrangements.

Notes on development assessable
against the Wild Rivers Code

For information regarding development in a wild
fiver area, see the relevant wild river declaration
and Guide 27, The relevant wild river
declaration will provide information regarding
which types of development must be assessed
against the Wild Rivers Code, and in some
cases which types of development are exempt
from wild river requirements.

The notes on development assessable against
the Wild Rivers Code in this section of the
checklist provide some guidance however this
may vary between wild river areas. The relevant
declaration will provide the information applying
to each wild river area.

Applications for some new developments will not
be accepted if the proposed developments in a
high preservation area (HPA). Most applications
for development activities which may be made
including those in a preservation area (PA), must
be assessed against and must comply with the
Wild Rivers Code where indicated In a retevant
wild river declaration.

Which wild river area is the development proposed in?

 

 

 

 

The proposed development is to be located in: (tick the applicable box/es)
Oia high preservation area (HPA);

(J ii) a preservation area (PA) ;

oO iii) a wild river floodplain management area (FMA);

(J iv) awild river nominated waterway;

oO v) a designated urban area (DUA),

 

Environmentally relevant activities
(ERAs) in a designated urban area

(f you answered YES, your application for an
ERA ts exempt from any wild river requirements
and provided there are no other aspects of this
development that require assessment against
wild rivers, you do not need to complete the
fernaining questions in Section 2.

if you answered NO to Q2, please complete the
remaining questions in Section 2.

Does the proposed development only involve any of the following environmentally relevant
activities (ERAs) in a designated urban area (as mapped in the relevant wild river declaration)?
i) An ERA 28 or ERA 14; or

ti) A level 2 ERA except ERA 1, 2, 3, 4, 20, 22 or 59.
oO NO Q YES (ensure you have completed Part G of Form 1}

 

Clearing native vegetation

Hf YES, there are a limited number of purposes
for which an application to clear native
vegetation may be accepted in a HPA. See
Gulde 27 for a list of relevant purposes for
which an application may be made in a HPA.

If YES and you ticked Q4 box j) the application
may be made and is assessable against the Wild
Rivers Code. If YES and you ticked Q4 box ii)
the application will not be accepted.

Note: If clearing native vegetation is in a PA,
there are no wild river requirements and
provided there are no other aspects of this
development where wild river requirements
apply, do not complete the remaining questions
in Section 2.

 

\s the application operational work for clearing native vegetation in a HPA?
O NO J YES (ensure you have completed Part J of Form 1)

If YES, is the clearing?

{J i) clearing regrowth (as defined in the Vegetation Management Act 1999) in a registered
area of agriculture in a HPA (see Guide 27); or

O ii) in a HPA outside a registered area of agriculture?

 

Page 11

Page 17

INTEGRATED PLANNING ACT 1997

Works in tidal areas, coastal
management districts and fish habitat
areas

H you answered YES to Q5, and ticked any
boxes in Q6), your application is required to be
assessed against and must comply with the Wild
Rivers Code.

H you answered YES to Q5 and licked box i) in
Q6, your application is required to be referred to
the EPA.

Note: If specified works are proposed in a local
government area, it is prescribed tidal work ~ the
relevant local gavernment will be the
assessment manager with the EPA as a
concurrence agency

if you answered YES to Q5, and ticked box fi) or
ii) in Q6, your application requires referral to
OPIF,

H you answered NO to QS and ticked box i) in
Q6, the application will not be accepted.

Htyou answered NO to Q5, ticked box if) in Q6
and the development is necessary to instal!
authorised works or infrastructure where a
development permit is not required, or if a
required permit is held, the application must be
assessed against and must comply with the Wild
Rivers Code. Applications for purposes other
than specified works or as described above will
not be accepted.

Ifyou answered NO at Q5 and ticked box iii) in
Q6, the application may be made if the works are
in aPA. These applications must be assessed
against and must comply with the Wild Rivers
Code. The application will not be accepted if the
development is proposed to be located In a HPA.

For more Information about specified works refer
to Gulde 27

Residential, commercial or industrial
development
Ifyou answered YES to Q7, your application is

Not subject to wild river requirements, Provided
there are no other aspects of this development

that require assessment against the relevant wild | 8

tiver declaration or Wild Rivers Code, you do not
need to complete the remaining questions in
Section 2.

If you answered NO to Q7 and ticked either box
|) or ii) in Q8, the assessing agency is the
relevant local goverment. The application must
be assessed against and must comply with the
Wild Rivers Code.

IDAS Assessment Checklist, Version 20, 2 April 2007
Is the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27- .
Development in a wild river area} .

C1No (J Yes

The application is for one or more of the following:

Oo i) Operational works that is tidal works or works in a coastal management district (ensure you
have completed Part M and/or Part P of Form 1); or

oO ii) Operational works for the removal, destruction or damage of marine plants (ensure you have
completed Part O2 of Form 1); OF

oO iii) Building or operational works in a fish habitat area (ensure you have completed Part OQ: of Form 1).

Is the application for residential, commercial or industrial development in a designated urban

area?
Clno Clves

If NO, does the application for residential, commercial or industrial development involve:

oO i) a material change of use made assessable in a local government planning scheme
(ensure you have completed Part D of Form 1); or

oO ii) operational works associated with reconfiguring a lot (ensure you have completed Part F
of Form 1).

 

Animal husbandry activities

ff you answered YES to Q9 your application
fequires assessment against and must comply
with the Wild Rivers Code,

The assessing agency is NRW.

Note: Applications for animal husbandry
activities will not be accepted if proposed in a
HPA. For more details and a definition of animal
husbandry activities see fhe Wild Rivers Act
2005 and refer to Guide 27.

Agricultural activities

you answered YES to Q10, your application
requires assessment against and must comply
with the Wild Rivers Code.

The assessing agency is NRW.

Note: Applications for agricuttural activites wit
not be accepted if proposed in a HPA. For more
details and a definition of agricuttural activities
see the Wild Rivers Act 2005 and refer to Guide
22.

The production of fodder in a PA, and pasture
improvement using low impact soil disturbance
techniques is not an agricultural activity as
defined under the Wild Rivers Act 2005. For
more information see Guide 27.

 

10.

Does the application involve a material change of use for animal husbandry activities (as defined
under the Wild Rivers Act 2005) in a PA?

CIno

O YES (ensure you have completed Part R of Form 1)

Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in
a PA?

CJno

If YES is the application for:
(J i) a material change of use; or
(ii) operational works.

oO YES (ensure you have completed Part Q of Form 1)

Page 12

Page 18

INTEGRATED PLANNING ACT 1997
Works that take overland flow water

The relevant wid river declaration will state
works that take overland flow water are elther
Self assessable or assessable, or are exempt
from wild river requirements.

Ifyou ficked Q13 i), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.

If you ticked Q13 il} an application is not required
to be made however the works must comply with
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application’
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.

if you ticked 13 if) your application is not
subject to wild river requirements.

Applications for development that is other than
that stated to be assessable, self-assessable or
exempt will not be accepted.

12,

13.

IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve works that take overland flow water in a HPA or an FMA?

LINno (1 YES (ensure you have completed Part Ks of Form 1)

If YES, is the application for works stated in the relevant wild river deciaration to be?
(1) assessable works

L) ii) self-assessable works

(7 ii) exempt works

 

Works that interfere with overland
flow water

The relevant wild river declaration will state
works that interfere with overand flow water that
are either self assessable, assessable or exempt
from wild river requirements.

If you ticked Q15 i}, your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.

If you ticked Q15 il} an application Is not required
to be made however the works must comply with
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW.
against the relevant part of the Wild Rivers Code
and must comply with the code.

If you ticked Q15 ii} your application is not
subject to wild river requirements.

Applications for development that is other than
that stated to be assessable, self-assessable or
exempt will not be accepted.

Waterway barrier works

Applications for building or raising waterway
barrier works in a HPA will not be accepted.
if you answered YES to Q16, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.

16.

Does the application involve works that interfere with overland flow water in a FMA?
O NO oO YES (ensure you have completed Part Kio of Form 1}

If YES, is the application for works stated in the relevant wild rivers declaration to be?
(J i) assessable works

{_) ii) self-assessable works

(1 it) exempt works

Does the application involve building or raising waterway barrier works in a PA?
CO NO | YES (ensure you have completed Part O; of Form 1)

 

Aquaculture (non ERA}

Applications for aquaculture in a HPA will not be
accepted.

if you answered YES to Q17, your application

must be assessed by OPIF against the Wild
Rivers Code and must comply with the code.

Does the application involve aquaculture in a PA?

Ino

O YES (ensure you have completed Part O; of Form 1)

 

Works that interfere with water ina
watercourse

Note: If the development is proposed in a HPA,
applications for all works that interfere with water|
in a watercourse (including dams or weirs,
stream realignment of stream diversion) will not
be accepted.

Ina PA, applications for instream dams and
weirs may be accepted in nominated waterways.
if you ticked bax ff) in Q19, your application will
not be accepted.

Note: Operational works outside a HPA or
nominated waterway are not subject to wild
river requirements.

More information and locations of norninated
watenways is available by contact NRW,
accessing the department's website
waw.new.gid.qov.au or contacting the
department by email on:

wild [email protected] the application involve operational works that interfere with water in a watercourse that is in
a nominated waterway in a PA?

C1no

IF YES,
[J i) The application is for an instream dam or weir; or

O ii) The application is for operational works that interfere with water in a watercourse, and is
for development other than a dam or weir.

Clyes (ensure you have completed the relevant Part K of Form 1)

Page 13

Page 19

INTEGRATED PLANNING ACT 1997
Environmentally relevant activities

Most applications for an ERA in a HPA will not
be accepted. Applications which may be made
require referral to the EPA, The assessment of
some ERAs is assessed by NRW, others have
been devolved to DPIF, NRW or delegated
focal government (see EPA website for more
information on devalved ERAs)

{f you answered NO to Q20 you do not need to
complete Qs 21-24.

if you answered YES to Q20 and the
development is in a PA, your application must be
assessed by the administering authority"
against the Wild Rivers Code and must comply
with the code, unless the proposal is for
development where an application will not be
accepted, or is exempt from wild river
requirements (see Q2). You will be able to
determine if an application will not be accepted
for the development by answering Q21 - Q24.

Ifyou answered NO to Q21, you do not need to
complete 022. If you answered YES to Q21 you
are required to complete Q22.

if you answered NO to Q22, the application will
not be accepted. lf you answered YES to Q22,
the application must be assessed by NRW
against the Wild Rivers Code and must comply
with the code.

If you answered NO to Q23 and the development
is proposed in the HPA the application will not be
accepted. if you answered YES to Q23, the
application must be assessed by the EPA or
NRW (as prescribed in schedule 8A of the IPA)
against the Wild Rivers Code and must comply
with the code.

H you answered YES to Q24 the application will
not be accepted, Hf you answered NO to Q24,
your application must be assessed by NRW
against the Wild Rivers Code and must comply
with the code.

Exempt ERAs in a designated urban
area

If the development is proposed in a designated
urban area there may be no wild river
requirements. See Section 2 Q2.

Note: All applications that can be accepted must
be assessed against and must comply with the
Wild Rivers Code (other than exempt ERAs in a
designated urban area).

20.

21.

22,

23.

24.

Does the application involve an ERA?

CINno

(s the application for an ERA 20 instream?

(no CJ yes

oO YES (ensure you have completed Part G of Form1)

IDAS Assessment Checklist, Version 20, 2 April 2007 |

Is a quarry allocation notice held for the proposed ERA 20 instream?

Cno Clves

Does the application involve any of the following in a HPA?
i) a level 2 ERA 11, (and is for specified works or a residential complex)

ii) an ERA 19 (dredging)

iii) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in
the Wild Rivers Act 2005, and Environmental Protection Act 1994)

iv) an ERA 22 (out of stream)

LJno ClyYes

Is the proposed development for ERA 20 (out of stream) and;

— inaFMA; and
— not low impact; and

— not for a residential complex in the area, or for specified works.

LINno Clyes

 

 

Documentation

if you answered NO to Q25, your application
may be subject to an information request and
processing of the application may be delayed.

 

25.

Has documentation been included with the application describing how the applicant proposes to
comply with the mandatory requirements, required outcomes, and/ or performance requirements
as set out in the relevant part/s of the Wild Rivers Code?

CINno (yes

% The administering authority may be either the EPA, or if devolved or delegated, the local govemment, DPIF or NRW.

Page 14

Page 20

 

INTEGRATED PLANNING ACT 1997

SECTION 3-

IDAS Assessment Checklist, Version 20, 2 April 2007

BUILDING REFERRALS (completion not mandatory)

 

 

Below is a list of the referrals that can apply to an application for building work assessable against the Building Regulation 2006. This section of the DAS
Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checklist is not required to be completed and lodged with an
application for building work assessable against the Building Regulation 2006 only.

 

Special fire services - generally 1.
For more information go to schedule 2 table 1 and
schedule 2A of the IP Requtation.

Assessment period 15 days. No response is a
deemed refusal.

An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
Tequires special fire services mentioned in schedule 2A part 1 of the Integrated Planning Regulation 1998
(IP Regulation) or includes an altemative solution assessed against the performance requirements of the
Building Code of Australia.

 

Fire safety for budget accommodation | 2.
For more information go to schedute 2 of the IP
Regulation

An application may trigger referral to Qid Fire and Rescue Services as an advice agency if the building work
the subject of the application requires the installation of a fire safety system for a budget accommodation
building.

 

Spray painting 3.
For more information go to schedule 2 of the !P
Regulation

An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
if the application involves a workplace incorporating spray painting.

 

Retail meat premises 4.
For more infarmation go to schedule 2 of the IP
Regutation

An application may trigger referral to Safe Food Qld as a concurrence agency if the application involves a
retail meat premises.

 

Private health facilities 5.
For more information go to schedule 2 of the IP
Regulation

An application may trigger referral to the Department of Health as a concurrence agency if the application
involves a private health facility.

 

Workplace area less than 2.3m? 6.
For more information go to schedule 2 of the |P
Regulation

An application may trigger referral to the Department of Industrial Relations (DIR) as an advice agency if the
application involves a work place area less that 2.3m2.

 

Land contiguous to a State-controlled | 7.
road

For more information go to schedute 2 of the IP
Regulation

An application may trigger referral to the Department of Main Roads as a concurrence agency or advice
agency if the application involves land contiguous to a State-controlled road.

 

Pastoral workers accommodation 8.
For more information go to schedule 2 of the {P
Regulation

An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
if the application involves pastoral workers accommodation.

 

Child care centre 9.
For more Information go to schedule 2 of the IP
Regulation

An application may trigger referral to the Department of Communities as a concurrence agency if the
application involves a childcare centre.

 

Coastal development 10.

For more Information go to schedule 2 of the IP
Requtation

An application may trigger referral to the Environmental Protection Agency (EPA) as a concurrence agency
if the application involves land completely or partly seaward of a coastal building line22,

 

Heritage 11.

For more information go to schedule 2 of the IP
Regulation

An application may trigger referral to the Heritage Council as a concurrence agency if the application
involves a heritage registered place.

 

Fisheries matters 12.

For more information go to schedule 2 of the IP
Regulation

An application may trigger referral to the Department of Primary Industries and Fisheries (DPI&F) as a
concurrence agency if the application involves assessable building work in a declared fish habitat area; or
as an advice agency if the application involves assessable building work on land that adjoins a declared fish
habitat area.

 

Integration of land use and public 43.

transport
For more information go to schedule 2 of the IP
Regulation

An application may trigger referral to Queensland Transport as a concurrence agency if the application
involves existing or future public transport corridors, or airport operational airspace?>.

 

Railway safety and efficiency 14.

For more information go to schedule 2 of the SP
Regulation

 

An application may trigger referral to Queensland Transport as a concurrence agency if the application
involves future railway land.

 

NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS

The local government, as the concurrence agency, is required to assess and provide a response for the following building applications within a prescribed
time. For applications relating to design and siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is 5 days. For all
other applications the assessment period is 15 days. If no response is received from the local government for an application, it is taken to be a deemed
refusal, However for amenity and aesthetics impact of particular building work for a single detached class 1a or class 10 building or structure (15), no

response is taken to be a deemed approval.

 

Amenity and aesthetic impact of 15.

particular building work for single
detached class 1 building or class 10
building or structure

For more information go to schedule 2 table { of the
IP Regulation.

Assessment period 15 days, No response is a
deemed approval.

 

 

An application will trigger a referral to the local government if itis :
¢ fora single detached class 1 building or class 10 structure; and
«the focal government has declared by resolution the following:
— the appearance of the building or structure will have an extremely adverse impact on the amenity of
the locality; and
— the appearance of the building or structure would be in extreme conflict with the character of the
locality.

 

2 Coastal building lines are prescribed under ihe Coastal Protection and Management Act 1995.
2 Operationat airspace is as defined in State Planning Policy 102 "Development in the Vicinity of Certain Airports and Aviation Facitities”.

Page 15

 

 

Page 21

INTEGRATED PLANNING ACT 1997,

é
IDAS Assessment Checklist, Version 20, 2 Aprit 2007.

 

 

 

 

 

 

 

 

Whether particular buildings may be | 16. An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a

occupied for residential purposes teferral to the local government as the concurrence agency. “

For more information go to schedule 2 table 1 of the

P Regulation.

Assessment pariod 15 days. No response Is a

deemed refusal.

Design and siting 17. An application may trigger referral to the local govemment as the concurrence agency if the building work

For more information go to schedule 2 table 4 of the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.

IP Regutation. 18. An application may trigger referral to the local government as the concurrence agency if the building work

Assessment period 5 days. No response is a does not comply with the qualitative statement for building clearance and site cover.

deemed refusal. 19, An application may trigger referral to the local government as the concurrence agency if the building work
does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
Development Code, part 11 or 12.

Fire safety in particular budget 20. An application may trigger referral to the local goverment as the concurrence agency to determine the

accommodation buildings building will comply with the fire safety standard under the Building Act 1975 when the building work has

For more information go to schedule 2 table 1 of the been completed.

{P Regulation.

Assessment period 15 days, No response is a

deamed refusal.

Higher risk personal appearance 21. An application may trigger referral to the local government as the concurrence agency to determine if the

services building work

For more information go to schedule 2 table 1 of the © — complies with the performance criteria of the Queensland Development code part 15; and

{P Regulation and the QDC part 15. e — the work does not comply with an acceptable solution stated in the part.

Assessment period 15 days. No response is a

deemed refusall.

Building work for residential service | 22. An application for building work for premises in which residential care service under the Residential

For more information go to schedule 2 table 1 of the Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger

JP Requlation and the QDC part 20. referral to the local government as the concurrence agency.

Assessment period 15 days, No response is a

deemed refusal.

Building work for removal or 23. An application for the removal and/or rebuilding at another site of a building or other structure, will trigger

rebuilding referral to the local government as the concurrence agency.

For more information go to schedule 2 table 1 of the

IP Regulation.

Assessment period 5 days. Na response is 2

deemed refusal,

Building work for rainwater tank in 24. An application may trigger referral to the local government as the concurrence agency to determine if the

designated rainwater tank area
For more Information go to schedule 2 table 1 of the
IP Regulation and the QDC part 25.

Assessment period 15 days, No response is a
deemed refusal.

 

building work or structure complies with the relevant performance criteria if -

« Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
building work, in a designated rainwater tank area; and

e Under the Queensland Development Code, part 25, the rainwater tank does not include an acceptable
solution for a relevant performance criteria.

 

Page 16

 

Page 22

Ou Reference: Pozo He martoo
consultingao
pty Itd

town planners +
2" August 2007 urban designers

Chief Executive Officer
Noosa Shire Council
P.O. Box 141
TEWANTIN Q 4565

Attention: Land Use Section
Dear Sir/Madam

RE: Development Application for a Request to Change an Existing Approval (Detached
House) situated at 12 Park Road, Noosa Heads described as Lot 54 on RP 52918,
Parish of Weyba: Design Inc Brisbane

Martoo Consulting Pty Ltd has been engaged by Design Inc Brisbane, as applicant for the above
proposal to submit a development application to Noosa Shire Council under the Integrated
Planning Act 1997. This application seeks a change to an existing approval! to extend a Detached
House located at 12 Park Road, Noosa Heads.

This letter details the proposal and provides an assessment of the relevant code provisions
contained within the Detached House Code.

1. THE SUBJECT SITE

The subject site comprises an existing lot which is described as Lot §4 on RP 52918, Parish of Weyba,
County of March. The subject site has an area of 794m’ and is afforded access from Allambi Rise. A
location map is included as Attachment 1.

The subject site is included in the
Detached House Zone under The
Noosa Plan, and the Natural Hazard
Overlay (Landslide Hazard Area &
Medium Bushfire Hazard Area) is
applicable to the site.

An existing single storey dwelling is
located on the site. The character of
this house and natural site conditions
are detailed in the adjoining .

 

photograph.
v
SUNSHINE COAST OFFICE GYMPIE OFFICE
11199 GYMPIE TERRACE NOOSAVILLE - PO BOX 1684 NOOSA HEADS Q. 4567 1/28 REEF STREET GYMPIE - PO BOX 391 GYMPIE Q 4570
TELEPHONE 07 54555425 - FACSIMILE 07 54555725 TELEPHONE 07 54827440 - FACSIMILE 07 54824952

[email protected] [email protected]

Page 23

@ Page 2

2. SURROUNDING PREMISES

The subject site is surrounded by a mixture of detached houses, and multi-residential development.
This development is a mixture of recently constructed and older style buildings, supporting both
permanent and holiday accommodation.

3. THE DEVELOPMENT APPLICATION

The owner of the site seeks approval to extend the existing Detached House. The following points are
considered relevant to the proposal:

 

It is proposed to retain the existing dwelling:
It is proposed to enclose a 50m’ area of the building undercroft area:

This area will be utilised as a Bunk Room with associated storage and bathroom
facilities provided;

An external stair will provide access to the proposed lower level;

The proposal will increase the dwelling height from 1 storey to 2 storeys, however the
building height in metres will not be altered;

The proposed extension will be contained entirely underneath the existing building and
accordingly the site cover of the existing development will not be altered;

The proposed works will be undertaken using building materials and colours consistent
with the existing dwelling;

The proposal will increase the GFA of the existing dwelling by 50m’: and

The proposed design takes into consideration the unique environmental and locational
constrains of the subject site with regard to existing vegetation and slope. In this regard

the project architect advises that the lower area has been designed specifically so no
additional footings or retaining structures are required.

The following photographs detail the existing nature of this
undercroft area.

 

Proposal plans are included as Attachment 2.

Page 24

@ Page3

4, ASSESSMENT

The Noosa Plan requires any extension to a Detached House located at 6-14 Park Road, Noosa Heads to be
assessed against the provisions of the Detached House Code. This is provided below.

Lala
Trower ed

 

Column 2
eer CR Cty

 

Compliance

 

Setbacks

o1 Buildings and other structures are

appropriately designed and sited to—

a) provide amenity for users of the
premises as well as preserve the
visual and acoustic privacy of
adjoining and nearby land uses;

b) preserve any existing vegetation that
will buffer the proposed building from
adjoining uses;

c) allow for landscaping to be provided
between buildings; and

d) maintain the visual continuity and
pattern of buildings and landscape
elements within the street.

   
 

$1.1 The minimum setback of the
Detached house or dwelling unit and
associated buildings and structures from
boundaries is not less than the minimum
specified in Schedule 1; or

$1.2 Where there is a conflict between
boundary setbacks in Schedule 1, the
greater of the setbacks prevails;

AND
$1.3 If there are no applicable setbacks

shown in Schedule 1, the siting provisions of
Part 11 or 12 of the Queensland

Complies — The proposed extensions
will not reduce the existing setbacks of
the dwelling.

 

adequate safe distance from electrical
infrastructure including substations,
overhead powerlines, power poles and
transformers.

swimming pools, sheds, tennis courts or
outbuildings) are not constructed under
overhead electricity transmission lines, or
within electricity easements.

SBR alternative provision to QDC Parts Develo Code apply.
11 and 12, P1, P2 and P7 SBR alternative provision to QDC Parts
11 and 12, A1, A2and A7
Electricity supply infrastructure
04 Uses and works maintain an $4.1 Buildings and structures (including Not Applicable - No overhead electricity

transmission lines or electricity
easements traverse the site.

 

Landslide hazard areas

OS Detached houses, Ancillary
dwelling units and associated uses are
sited or constructed to maintain the
safety of people and property from the
risk of landslide.

 

 

$5.1 Ifon land identified as a Landslide

Hazard Area on Overlay Maps OM1.3-9.3,

the use does not~

a) involve the removal of vegetation
other than grass from use areas: or

b) _ involve excavating or filling of more
than 50m’ of material (other than
placement of topsoil not exceeding
400mm in depth: or

c) __ involve cut or fill with a vertical depth
of more than 1.5m relative to ground
level; or

d) redirect or impede water flows in an
existing watercourse or stormwater
drain; or

e) _ involve construction of an on-site
effluent disposal system, or

$5.2 Asite specific geo-technical report

prepared by a registered professional

engineer either—

a) certifies that the site is not at risk from
landslide emanating from the site or
from other land; or

b) identifies methods of stabilising all
buildings, accessways and use areas;

AND

$5.3 If the geo-technical report identifies

methods of stabilising buildings,

accessways and use areas, those methods
are implemented.

 

The subject site is located within a
Landslide Hazard Area.

a) Complies - As can be seen on the
proposal plans, no significant on-site
vegetation is required to be removed.
Further, as the proposed extensions are
able to be undertaken without additional
footings, the works will not impact upon
the root systems of existing trees.

b) Complies with Specific Outcome - it
is not proposed to excavate greater than
50m* of material. The elevations
included as Attachment 2 detail the
extent of excavation proposed on site.

¢) Complies - No benching of the site is
proposed.

d) Complies - No watercourses or
stormwater drains traverse the site.

e) Complies - The site is connected to
Council's sewer network,

 

 

Page 25

@ Page 4

 

 

above the ground level on stumps,
for sloping sites.

SBR alternative provision to QDC Parts

11 and 12, A4.

11 and 12, P4.

Built form
Height
O06 Buildings and other structures— $6.1 The maximum number of storeys and | Complies — The proposed extension will
a) _ are lowrise and presenta building | building height is~ increase the height of the existing
height consistent with structures on | 4) fin the Visitor Mixed Use Zone 3 | dwelling to 2 storeys. However as
adjoining and surrounding land; st and 12m: or previously detailed the proposed
b) have a maximum building height of- storeys " ; extensions will not increase the overall
- — b) _ifin the Noosa Heads Locality, height of the building in metres.
i) Visitor Mixed Use Zone— 3 Attached Housing Zone—
storeys; or i 00064 i
it) ifin the Noosa Heads Serenty Close Noosa Heads -
Locafity Attached Housing .
Jonny _— storeys and 15m;
. Lot 4 on ii otherwise — 3 storeys and
SP1000664 in 12m,
Serenity Close ©) _ifin the Noosaville Locality and the
Noosa Heads— 4 Attached Housing Zone and with
storeys frontage to the following streets: -
° Otherwise- 3 Russell St, William St and Howard
| _ storeys | St, or Weyba Rd, James St and
it) ifin the Noosaville Locality Alert St north of their intersections
and the Attached Housing with Elizabeth St — 3 storeys and
Zone with frontage to the 42m:
following streets: - Russell ain .
St, Wiliam Stand Howard | °) inthe Noosa Not Shore Locality
St, or Weyba Rd, James St «2 sto and 8m or 2 sto and
and Albert St north of their @m othe pitched roof, bons
iforsections wih Elizabeth other part of the building or structure,
. 9 storeys; ceeds 8m; or
iv) _otherwise- 2 storeys; ex "
c) donot visually dominate the street, | €) __ ifin the Rural Zone or Rural
surrounding spaces or the existing Settlement Zone — 2 storeys and 8m
skyline; of 2 storeys and 9m where the
d) —_ preserve the amenity of surrounding pitched roof, but no other part of the
land including access to sunlight; building or structure, exceeds 8m; or
e) respect the scale of surrounding f otherwise — 2 storeys and 8m.
vegetation; and
fy respond to the topography of the site
by stepping down the slope or siting | SBR alternative provision to QDC Parts

 

Site cover ~ Noosa Heads Locality,
Detached House Zone, 6-14 Park
Road, Noosa Heads

010 = The site cover of buildings and
other roofed structures—

a) has a low site impact to maximise

the opportunity to retain natural site

characteristics such as native
vegetation and natural landforms;

$10.1 If on premises at 6-14 Park Road
Noosa Heads, the maximum site cover of ail
buildings and structures does not exceed
150m?

SBR altemative provision to QDC Parts
11 and 12, A3

Complies— As previously detailed, the
proposed extension does not increase
the site cover of the existing dwelling
which is less than 150m”.

 

 

and
b) maintains the safety of people and
property from the risk of landslide
and bushfire.
SBR alternative provision to QDC Parts
14 and 12, P3
Roof form
012 Roof forms— $12.1 The main roof of the Detached Not Applicable - The proposal does not
a) contribute positively to the local house or Ancillary dwelling unit has— alter the existing roof form of the
skyline; a) a roof pitch no less than— dwelling.
b) complement the low density hin win Win ca
character of the locality; if in Kin Kin village or Boreen Point
° do not present an appearance of village - 12 degrees;

excessive bulk to side neighbours

 

 

 

 

Page 26

@ Page5

 

(eg. avoid low pitched roofs or box
profiles/parapets);
d) use simple traditional roof designs;
e) do not create opportunities for

otherwise - 5 degrees; and
b) if not in Precinct C or D of Noosa
Springs — roof overhangs a

 

013 Detached houses and Ancillary
dwelling units are designed to provide
adequate visual privacy for people using
the building and buildings on adjoining
premises.

SBR altemative provision to QDC Parts
11 and 12, PS.

$13.1 The Queensland Development
Code, Part 11, A5 applies

residents to overlook the private minimum of 600mm wide;
open space areas of neighbouring AND Complies— The proposal does not seek
properties. $12.2 Buildings and structures do not to establish a roof top terrace.
include roof top terrace areas.
Privacy

Complies — Due to the dense vegetation
surrounding the site, the proposed
extension will not impact upon the visual
privacy of adjoining uses.

 

Streetscape character
014 Buildings and structures provide

$14.1 \fin the Detached Housing Zone, for

Complies — No wall lengths greater than

for visual amenity by-- buildings and structures— 15 metres are proposed.
a) staggering or separating continuous | a) the maximum wail length is 15m;
walls into smaller sections to vary and
the elevation; and b) each extemal wall plane
b) providing well articulated building incorporates at least one design
forms with strong vertical design element to add visual interest and
features. amenity (such as windows,
pergolas, sun shading devices,
balconies or a change of building
material).

 

Streetscape - Casual surveillance

017 Detached houses and ancillary
dwelling units provide opportunity for
casual surveillance to and from the street
to protect the personal safety and
security of residents and visitors.

$17.1 Ifin the Detached Housing, Semi-
attached Housing, Attached Housing or
Village Mix Zone — the main entrance of the
Detached house or Ancillary dwelling
unit is clearly defined and visible from the
street.

Not Applicable — The subject site is
within the Detached House Zone.

 

Garages and carports - other than Kin

Kin or Boreen Point villages

018 Within the Detached Housing,

Semi-Attached Housing, Attached

Housing and Visitor Mixed Use Zones,

garages and carport structures are

designed and sited to visually integrate

with the dwelling unit and avoid

dominating the street by—

a) minimising the width of the structure;

b) minimising projection of the structure
forward of the main face of dwelling
unit, and

c) ensuring the roof form, materials
and detailing complement that of the
associated dwelling unit.

 

 

$18.1 Within the Detached Housing, Semi-
Attached Housing, Attached Housing and
Visitor Mixed Use Zones, garages and

carports—

a) have a front boundary setback of at
least 6m; and

b) adopt a roof form and use building
materials that are the same as that
of the building; and

c) if the front elevation is visible from
toad frontages -

i present a minimum width to
the streetscape (the total width
of garage doors is no more
than 6m or 50% of the
frontage width, whichever is
the lesser, where the structure
faces the street); or

=

for more than a 2 car garage -
additional garages are set
back from the frontage not less
than the width of the additional
garage door; or
d) that are visible from, but do not face
the street, include windows or other
articulation and have a 6m

buffer area between the
structure and the frontage.

 

Not Applicable - The proposal does not
seek to alter the existing car
accommodation structure.

 

 

Page 27

@ Page 6

 

Water Storage

 

Water conservation and storage

020 On-site water storage is provided,
designed and operated to support the
efficient use of water;

AND

021 On-site water storage is adequate
for occupants every day use;

AND

022 Detached houses and Ancillary
dwelling units within Bushfire Hazard
Areas have sufficient water supply for fire
fighting purposes.

$20.1 Ifin a designated rainwater tank area
as identified in Map 1 of Schedule 8,
detached houses have a rainwater tank in
accordance with Schedule 8.

AND

$21.1 If not in a reticulated water service
area a rainwater tank of a minimum of
60,000 litres is provided for each dwelling
unit,

AND

$22.1 Ifnot in a reticulated water service
area and an on-site assessment undertaken
by a private certifier in accordance with
Australian Standard AS3959 indicates the
premises is in a Medium or High Bushfire
Hazard Area there is, on the fot, an
accessible dam, swimming pool or water
tank with fire brigade fittings, that contains at
least 5000 litres of water.

The provision of an above-ground
rainwater tank would increase the site
cover of the existing dwelling. The
provision of an in-ground rainwater tank
would impact upon the existing
vegetation. Both these outcomes are
not supported by other provisions of the
Detached House Code.

 

Carparking

 

Carparking spaces

025 Sufficient carparking is provided
to accommodate the number of vehicles
likely to use the site.

SBR alternative provision to QDC Parts
11 and 12, P8&

$25.1 A minimum of 1 carparking space is
provided on-site;

SBR altemative provisions to QDC Parts
11 and 12, A&

Not Applicable — As previously detailed
the proposal does not seek to alter the
existing car accommodation.

 

Effects of use

 

Amenity

026 Detached houses and Ancillary
dwelling units are located, designed
and operated to avoid significant adverse
changes to the light, air quality, noise,
accessibility or other conditions enjoyed
by users of associated, adjoining or
nearby premises;

AND

027 Lighting associated with the use
of Detached houses and Ancillary
dwelling units does not have an
adverse impact upon the amenity
enjoyed by users of adjoining or nearby
premises.

 

 

$26.1 No solution provided (no requirement
for self-assessable development)

$27.1 For lighting

a) the vertical illumination resulting
from direct, reflected or other
incidental lighting emanating from
the site does not exceed 8 tux when
measured at any point 1.5m outside
the boundary and at any level from
ground level upward;

b) all flood lighting is hooded or baffled
to direct lighting downward or is of a
type that gives no upward
component of light when mounted
horizontally;

co) all flood lighting is setback a
minimum of-

i 6m from the boundary to any
frontage; and
ii 2m to any other boundary;

d) lighting structures are not more than
8m in height.

 

Complies — As detailed previously the
proposed extension will not impact upon
the residential amenity of adjoining uses.

Complies — Conditions may be
recommended accordingly.

 

 

As detailed in Section 1, the subject site is mapped as a Landslide Hazard Area & Medium Bushfire Hazard
Area. However, the assessment table included in Division 8 of The Noosa Plan details that works
associated with a Detached House are exempt from assessment against the applicable codes.

Page 28

@ Page?

5. CONCLUSION

This application can be supported on a number of grounds. These grounds include:

The proposal design takes into consideration the unique environmental and locational constraints
of the subject site;

The proposed extension does not increase the site cover of the existing dwelling;

The proposed extension will be of a form and treatment consistent with the existing dwelling;
The proposal does not adversely impact the residentia! amenity of the adjoining premises;
The proposal has been designed to ensure no additional footings are required:

The proposal does not require significant vegetation to be removed, nor does it impact upon the
root systems of existing vegetation;

The proposal is consistent with all requirements of the Detached House Code.

The Assessment Manager's favourable consideration of the above development application is therefore
recommended. Please contact our office if you require any further information and/or clarification with respect
to the above application.

Yours sincerely

Hannah Blue
Senior Planner
Martoo Consulting Pty. Ltd.

Cc. Noel Robinson ~ Design Inc Brisbane

Page 29

@ Page 8

Attachments

 

Attachment 1 — Location Map

 

tH, Ss;
TweS $y

NOOR, p,
7@-The State of Qugensland,

  

ae

Page 30

@ Page

Attachments

 

Attachment 2 — Proposal Plans

Page 31

 

 

 

 

 

 
          

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

T 1
| COLORBOND STEEL ROOF SHEETING
1
1
\ = PuYwoOD CLADDING = RL+35.400
— oe _L 33.900 FAMILY
— _PRWOODCADONG AL HS2.340
LOUVRE WINDOWS
REVERSE STUD WALL
CONSTRUCTION
___(WESTERNSPOTTED GUM) _RL-+30.240__LIVING
PLYWOOD CLADDING
LOUVRE WINDOWS
RL+27.000 BUNK UP ROOM
Poo LL NY eA Ng A mah ELLZAL LIA ELIZA OANA LZARTEZARZIEANZON) 4) —— oan we — ee ee ee
STAINLESS STEEL
VERTICAL WIRES
{
1
| 1
SITE BOUNDARY AT LINE
SITE BOUNDARY AT LINE
_ OF WEST BUILDING FACE C OF WEST BUILDING FACE
ot on vam ceom [om Sign Off oH SH ROD BY OLE “ GREG WOOLLEY Puy wu
QUALTY ceRMAEDIso soo "EAA dere nedwranes De RSCTA ~ = oan, SSE Teg 10_T cppommury pocuveNTATON T T D 8 mos | |
cowrin upeetinntyis NT aa eer ee rt Ts xen T == TEAATIONS TO ‘Sree owe Te So
eteterr ctr eee ete nm Renter T T ppmcet BSG pocuse T T ee DASA
Sv epameermemee (I [Tf Taser TT 12 PARK ROAD, NOOSA Sauer ee —=lnnn
ican 2 . . Se
eRES Sd Seay t t TT [per Besevion T T ™ NORTH ELEVATION am at7es.ne7
(erent aoe Whalen ncrntcertneesteta [T_T TT oT carsrmnon cooADTATEN T T Archtactre urhun Seige nore wn [wo een ~7e In
~ T T T T so _[ Fost CONTRACT COIETNOR T T

 

 

 

 

 

 

 

 

Page 32

LOUVRE WINDOWS

Seem
CONS
GUTTER SPOTTED GUM}

GABLE ROLL EDGE

REVERSE STUD WALL
CONSTRUCTION
(WESTERN SPOTTED GUM)

DOWN PIPE +
PLYWOOD CLADDING SPREADER

COLORBOND STEEL ROOF SHEETING

LOUVRE WINDOWS

STAINLESS STEEL
VERTICAL WIRE BALUSTRADE

PLYWOOD CLADDING

REVERSE STUD WALL
CONSTRUCTIO
(WESTERN SPOTTED GUM)

STAINLESS STEEL
VERTICAL WIRE BALUSTRADE

c a
ounanroce: Saninirntatemsenrs [ ES GREG WOOLLEY
score Sasa = Eee wr es
pecs tararcam siege ae ALTERATIONS 70 coram mane 0 liao
12 PARK R NOOSA ae a coment, oven ce | 92.05.57

auc et en tnt io nem matinee aeeest
Sara ee ae Ee “* WEST ELEVATION an Tuas
aa tere a tt treet sence Aschhectirs urban deste bnteriers wom Twn ean

 

Page 33

 

 

—_ SITE BOUNDARY

 

LOUVRE WINDOWS

REVERSE STUD WALL
CONSTRUCTION
(WESTERN SPOTTED GUM)

PLYWOOD CLADDING —
GABLE ROLL EDGE 5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ee ae

£
Pent kr cet ones pe

 

 

 

 

 

anabeal are ea Yr trecimcntNecy emer Ab,

 

 

 

 

 

 

 

GABLE ROLL EDGE
FASCIA
Ti , Fo
a 4
PLYWOOD CLADDING
TO FIREPLACE
. COLORBOND STEEL
= ROOFSHETING
; aS pops ~ 77 T==" BLOOD CLADDING "TT
| = [- GABLE ROLL EOGE ,
EEE am
mq Ea aS
Fete 2 " = Li Set ebecss esse see ee eS SSE ES SSS SST SSS SSS SS SS SSS SSS
1 k= TI EE
wre
; Pop TSR =| iq PI ee
| ‘nt EH AL LOUVRE WINDOWS
TIMBER CRIB tl EE als DOWNPPES
| WALL LANDSCAPE re Thess NT — STAINLESS STEEL
: RETAINING VASES
LIVING _RL +30.240 | os Is ? | ‘AL WIRES BALUSTRADE
Loe ee DEO ow oe ee ee ee ee ree nee nnn ee Ed Se f peed oar eg ee eee eee nena
DECK AL +30.215 : =
| DOWN PIPES mT i NY PLYWOOD CLADDING
tl it Y
| it | H | Y AEVERSE STUD WA
"I u By S CONSTRUCTION
| i Ei = i (WESTERN SPOTTED BUM)
Vt 2 Rar MY,
\ Mi Fy I< STAINLESS STEEL
| 11 TIMBER CAIB EN] 7 VERTICAL WIRES BALUSTRADE
BUNK UP ROOM AL +27.000, woe too ee! Yo r WALL LAND SER = — — : ro = NATURAL GROUNDHINE — \---—---------------
Pe | { NI Tt AY SITE BOUNDARY
: 1 a NATURAL GROUND LINE
| u ss AT BUILDING'S FACE A
' ' ose,
| af
I Sa
\ 1 ~
| ~
1 i Ss, f
| | S
( man,
1 t ae
' mA,
| | ~
t Maa
| u —
’ wea
i
(
| : =
embody Onaga etercataceerinnae [ROE OESRPTON orev rece Yoo Sign Off ORAWNG STATUS REMEWED BY CATE GREG WOOLLEY
SAME  etneenenes | Ce — Se ong Bite
(© care ep st rerPaty oth Geta: Wesru le SSO mee perma
samecenemtmnmmenmmemervemens | SS a ALTERATIONS TO ere
Peart acta att

(70 9c 2 eta CTHEAND 507 ITAL
Tine saimasaneaad Hiren om
oi

12 PARK ROAD, NODSA

 

 

mee

re We

EAST ELEVATION

mmr Te ooze & [np
sas |180 Sam ag
tenes ott | 02.05.87
aoe [5B

 

 

Architecture Urtan design interfere

 

wom [rene meen |p

 

 

 

Page 34

 

 

 

 

      

WARDROBE

    
 

|
oe

+

       

+36.665
6

  

 

 

 

 

 

; GREG WOOLLEY
T

 

 

LT Ld

 

 

 

“ALTERATIONS TO

 

 

Reem Sasa

 

 

 

 

 

 

 

 

T T T 7 T T
T T T 7
1 1 Tr ca TT _ 12 PARK ROAD, NOOSA Sera
Ferececk ates tteemnentanaenannons (TOT Se LAUNDRY REMOVED AND
—_ ee DRY DECK & ROOF EXTENDED Atincum pend ta

 

 

 

 

 

 

 

 

 

Page 35

 

 

 

 

l
|
|
\
\
l
\
\
\
\
\
\
\
‘
‘
\
\
\
\
\
fy
\
\
\
\
oN
850

 

 

 

 

 

    

 

 

 

 

— A WN Be
eect 429 uoT 7
joo FR Pe) Ow |
TORE gee i ae A
e-77 "a3 af y fl
ato] = a" 4b we 2-7 vs
NY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

—e —
— -e
al
\

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

|
ha
a
v
\
\
\
20
cO

 

 

 

 

 

 

 

 

 

 

 

CK\ABOVE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2S, 7 Q

 

 

 

ul

<
}
MD

t
,
t
—
\
Yaa
\
\
\
\
\
&
&

sce tn
1
Ay

\

 

 

 

L po TIMBER GATTEN -<& yy
\ _ oy eb eee SCREEN TO ME Pp YS:
| oo ---eeee enn WATE PR RRR SSS op sonoma pe nnn i reado I LS OY
oe ------fe- --denceccr wl __ -1 i.e =
LANDSCAPED DESIGN-PATHWAK — — 4: Sg [= = Sogo6 = n

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

oN
[Yo
cies
Gy
pal wlio] sete. Leia
o

 

 

 

ge
on
bat

 

 

 

Comair at he Demy rar | . om

ev. ATE _OESCRFTON pam capes foo Sign Off DRANG STATUS | REWEMED BY OAIE GREG WOOLLEY I
aoe n ee LLE'

QUALITY CERTIFIED ISO 9001 wefled a corvieed sa the rewubereras of tte Prect MLE Pan

T cag. loam. sue Veg Tne 101 oproRTLNETY QOKNENTATION
[alg th ce corti fat Ndr Eee oer ak Tica Tea 20 _| Pre ce SGH DocUMeNTATON

cominivteseremen Sea onaceuawiizeae [ez 1 20507 oN, NOT rae at —
(8S DoD. ol ‘SCOUT DESCN OocUNENTA
‘eet gaa a gar pe ey ; at ed

T

T

T

ok a en evr rb ek Daa ra 3
niente 32) astasaty OOCLMERTATON T

T

T

i

T

 

 

 

Design! min
‘AOLOONTD MIN BEI

"ALTERATIONS TO ae

Grn s0c9 meagan WENN ATT TAR

12 PARK ROAD, NOOSA TEMG NAPA 17908

aa

 

 

 

 

 

 

Ei nen ny pevty  soe t sein rere

 

 

 

 

 

 

erik i eee ey T contact ES ie
Shao ff a 4 Teor meson ™ PROPOSED BUNK UP ROOM,
ercetcl hace eat eae ral
:

 

 

 

 

LAUNDRY AND TOILET Arcthectare Urbs destpa lenors

Trost covmees DocweNTaTOn.

 

 

 

 

 

 

 

 

 

 

 

 

Page 36

 

 

KA 7 LAND USE SECTION FEES
aw MENICLONTA 7

RECEIPT TYPE

SALE OF DOCUMENTS

Superseded Planning Scheme Documentation . 520

Copy of Permit/Approval Letter 110

The Noosa Plan Documentation 111
APPLICATION FEES

Material Change of Use - Code/impact

Consistent 521
Inconsistent 521

Assessment under Superseded Planning Scheme §21

Modification to a Development Permit . FG = 521

Extension of a Currency Period : 521

Operational Works - Landscaping 521

Bldg Work assessable against the Planning Scheme 521
PRE LODGEMENT REVIEW

Half Hour 522

One Hour 522
ADVERTISING

Purchase Advertised Applications 523
JETTIES

Jetty Application Fee 524

Jetty Bond : 51

(Category 4)

BONDS

Performance Bond : : . . 51

(Category 9)

SIGNS : .

Registration Fee . . . 222
SEARCH FEE

Search of Land Use Section file 112

Liquor Licensing Request 113

 

TOTAL $ 4oe

NAME: Aveertao Corsetti re ? kK

 

 

 

ADDRESS: @-_ Lo Boa | Get
Nesia HeEAag U4 5t.7
FILE NO: Ge 23643 04 DATE: 7/€fo7

 

‘RECEIPT NO: ‘ AL AO Signature of TP Officer: PS Snneameng

AUTHORITY NO:

13)200% [21 52/

Page 37

CALCULATION OF FEES

 

APPLICATION

FEE

TOTAL
FEES

 

MCU - CODE ASSESSMENT
Details of Development

Consistent 1.0
Inconsistent 3.0

FEE CALCULATION

 

MCU - IMPACT ASSESSMENT
Details of Development

Consistent 1.0
Inconsistent 3.0

FEE CALCULATION

 

OPERATIONAL WORKS
Details of Development

FEE CALCULATION

 

 

 

TOTAL FEES

 

 

 

Used in these records

About this file

File size
2.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

23643 DA - Change to existing approval [As Published].pdf · 2.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.