Council archive · source document
23643 DA - Change to existing approval [As Published] · 132003.221152.4
INTEGRATED PLANNING ACT 1997
Form 2, Version 3.3, 29 May 2006
Applicant details 42. Name:
Cleary identify who is making the application. | Design Inc Brisbane C/- Martoo Consulting Pty Ltd ‘|
The applicant need not be the owner of the
land. 13. Postal address:
When signing and lodging this application 7
The applicant is responsible for ensuring the | PO Box 1684, Noosa Heads Q_ 4567 ‘|
information provided is correct. The .
assessment manager, any referral agency and | 14. Signature: i 15. Date:
the Chief Executive (where applicable) will rely C
on this information when assessing and [AL August 2007
deciding the application. 9
Ifthe applicant is a company
A contact person must be shown. All 16, Contact person:
correspondence will be mailed to this address. | Hannah Blue |
17. Telephone number: 18. Mobile number: (if applicable)
| 5455 5425 [ N/A |
19, Fax number: (if applicable) 20. Email address: (if applicable)
| 8455 §725 | [ [email protected]
Land owner/s consent (f applicable) 21. Land owner’s consent:
Section 3.5.24(3) of the IPA requires that the i "
Jand owner's consent must be provided if the Name In Full Signature Date
person making the request to change an (i) see attached
existing approval is not the fand owner.
For information about land owners refer to me
Guide 1 Making an IDAS development (ii)
application.
Land owner's consent Is not required for a (iii)
mobile or temporary ERA.
lfan owner has signed thisform.as _ . (iv)
applicant, their signature is not required again
in this section. -
Hf there are multiple owners, the consent of
gach owner fs required,
Resource entitlement (if applicable) 22. At the time of the request, would a development application for the approval have required
Sections 3.5.22(4) & (5), 3.5.24(3B) & (3C), evidence of resource entitlement?
and 3.5,33(3B) & (3C) of the IPA may require
the written agreement of a resource manager if x NO - go to a24 O YES - go 10.023
the request involves a prescribed State ‘ ‘ ‘ i ;
resource, f when the request was made a 23. Is this request accompanied by the written agreement of the chief executive from whom the
development application for the approval would evidence is required? (tick the applicable box)
have required evidence of resource entitlement {J NO - the written agreement of the chief executive must accompany this request
under section 3.2.1(5) of the IPA. oO YES
Nature of the request 24, This request is for:
aba may request to modify an existing (An extension of the relevant period for the development approval (s 3.5.22)
. LD To change or cancel conditions (s 3.5.33)
To change the development approval (other than a change of a condition) (s 3.5.24)
(1A change to conditions of a rezoning approval given under the P&E Act (s 6.1.354)
25. Provide details of, & justification for, the proposed modification
50m2 extension of the lower level of the existing dwelling house.
Concurrence agencies 26. Did the previous application involve concurrence agencies or building referral agencies?
Under s3.5.22(1)(a) & 3.5.24(1){a) of IPA, a
copy of this request must be forwarded to each
concurrence agency for the previous
application prior to lodgement of this form with
the assessment manager.
Note: “No” will always apply to a request to
change conditions of a rezoning approval given
under the P&E Act.
XX No
oO YES - fist the concurrence agencies who have been sent a copy of the request for modification
(i)
(ii)
(ii)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23643 DA - Change to existing approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.