Council archive · source document
23643 DA - Change to existing approval [As Published] · 132003.221152.4
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 April 2007
Operational work that is tidal work or |9. The application involves operational work that is: (tick the applicable box/es)
work in nennn we eeu te ret (1 (i) tidal work"? as defined under the Coastal Protection and Management Act 1995 (the
more information about prescribed tidal work in Coastal Act) that is not prescribed tidal work ~ complete Part M of Form 1; OF
local goverment él areas refer o Guide 24.) [7] (i) tidal work that is prescribed tidal work"" other than in a canal’? -complete Part P of Form 1; 0f
he lector esas seecenentty te *. C1 (iii) carried out within a coastal management district under the Coastal Act and for - complete
Environmental Protection Agency (EPA). Part M of Form 1 if any box/es (a) to (i) below are ticked.
fan agency other than EPA is the assessment (1 (a) constructing or installing works in a watercourse between MHWS and HAT (le.
Fares eo acacy ate appcsion in other than those works in tidal water) where the development has been determined not
relation to this matter. to be assessable against the Water Act 2000;
ol ple wanaenaaliaiaiadiadl {1(b) constructing a canal’? intended to be connected to tidal waters;
{1 (c) constructing an artificial waterway;
CO (d)_ reclaiming tand under tida! water;
C1 (e) disposing of dredge spoil or other solid waste material in tidal water;
C1 (f) _ interfering with quarry material on State coastal land above high-water mark;
(1 (g)_ draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
(C1 (h)_ removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
(1 (i) constructing a bank or bund wall to establish a ponded pasture on fand, other
than State coastal land, above high-water mark; or
{iv) none of the above.
Operational work below high water | 10. The application involves operational work that is: ( tick the applicable box/es)
mark itonmaton celerto Guide 18, For (1 (i) tidat work"? as defined under the Coastal Protection and Management Act 1995 (the
more information about prescribed tdal work in Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or
local goverment tidal areas refer to Guide 24, C1 (ii) tidal work that is prescribed tidal work"4 - complete Part P of Form 1; of
O10, he apclentn tigoes cetera ero C1 (iii) carried out within a coastal management district'S under the Coastal Act and for -
Se aarsnon fa Wartime Safety Or) cispasing of dredge spoil or other solid waste material in tidal water - complete Part
foal presobed tal wo mance C1 (b) reclaiming land under tidal water - complete Part M of Form 1; or
(J (c)_ constructing a canal’?, if the canal is associated with reconfiguring a lot - complete
Part M of Form 1;
(iv) none of the above.
Coastal management 11. The application involves: (tick the applicable box/es)
For more information refer to Guide 18.
Unless you answered “none of the above" to
Q11, the application requires assessment by the
Environmental Protection Agency (EPA).
Hf an agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the apptication in
relation to this matter.
C{i) a material change of use assessable under a planning scheme involving operational
work carried out completely or partly in a coastal management district'5
CD (ii) a material change of use assessable under a planning scheme involving building
work, carried out completely or partly in a coastal management district that is —
« the construction of a new premises with a GFA" of at least 1000m?2
« the enlargement of the GFA of existing premises by more than 1000m?
CI (iii) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
(1) (iv) reconfiguring a lot’ assessable under schedule 8 of the IPA and in connection with
the construction of a canal'2 — complete Part M of Form 1
(v) none of the above
10 Tidal work is defined in sch 10 of the IPA.
11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area,
12 Canal means canal as defined under the Coastal Protection and Management Act 1995
13 Tidal work is defined in sch 10 of the IPA.
14 Prescribed tidal work Is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2} of that Act.
16 GFAis defined in sch 14 of the IPA to mean the gross floor area, For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.
17 Under s117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the application for the operational works to construct the artificial waterway.
Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23643 DA - Change to existing approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.