Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Attachment 4b - Engineering Report Part 2 · MCU18/0015

Attached to the e-mail Response to Information Request (Engineering Report Part 2) MCU18/0015 & RAL18/0001.

of 38

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (15.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 34, section 1. The text section number identifies this passage in the reader.

From: Adam Shayler <[email protected]>
Sent: Friday, 6 April 2018 10:52 AM
To: Justin Walsh <[email protected]>
Cc: James Brownsworth <[email protected]>; Pamela Davidson <[email protected]>; Ben Crosby
<[email protected]>
Subject: RE: Sewer Construction in Steep Sands

Hi Justin,

Sorry I have not replied before now.

I will review information you have sent and get back to you.

Kind regards,
Adam Shayler
Manager - Trenchless

M: +61 432391577
O: +61 7 3217 5153
E: [email protected]
A: 2/4 Park Rd Milton Qld Aust 4064
P: PO Box 2211 Milton Qld Aust 4064
W: www.bamser.com.au




NOTE: This email is confidential and may be subject to legal or other professional privilege. If you have received it in error you must
not disclose or use the information in it, and confidentiality and privilege are not waived. Please notify the sender by return email
and delete it from your system.


Please consider the environment before printing this e‐mail

From: Justin Walsh <[email protected]>
Sent: Wednesday, 4 April 2018 9:52 AM
To: [email protected]
Cc: James Brownsworth <[email protected]>; Pamela Davidson <[email protected]>;
[email protected]
Subject: Sewer Construction in Steep Sands

G’day Adam,

We are currently looking at another project in Noosa where we have to construct approximately 250 metres
of sewer through a steep vegetated dune area. We propose to utilise poly pipe within bends rather than
traditional sewer and hope to do it with trenchless, directional boring. We need to address the attached
information request from council and we would appreciate it if you provide some details of how you would
go about it with a trenchless system eg extent of clearing, access requirements etc.
Thanks.
                                                                                 3

Used in these records

About this file

File size
15.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 4b - Engineering Report Part 2.pdf · 15.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.