Council archive · source document
51984.3185.3 Amended Decision correcting applicant details
Officer: Marcus Brennan Direct Telephone: 07) 5449 5225 Fax: (07) 5447 5601 Response Address: Locked Bag 72, SCMC 4560 Our Reference: MBB:JLP:51984.3185.3 (TPC 1637) Your Reference: 17 March 2011 Ms Lisa Smith 64 Allambi Terrace NOOSA HEADS QLD 4567 Dear Madam Re: Application for a Change to a Development Approval – removal of tennis court and establishment of storage areas – situated at 16 Barbados Crescent, Noosaville described as Lot 0 BUP 6442 and Lot 1 RP 197123 I refer to your request dated 1 December 2010 to make a permissible change to an existing approval and apologise for the clerical error which caused this decision to be forwarded to the applicant detailed on the original application (TPC 1637). On 21 February 2011 Council decided to approve the change, subject to the following conditions: PLANNING ASSESSMENT Development undertaken in accordance with this approval must generally comply with the approved plan titled Schematic Design for Entrance and Public Areas prepared by Lisang Design. The proposed pool equipment store shall be no greater than 1.8 metres in height. CIVIL ENGINEERING Vehicle Access Where any mechanical gate is provided at the entrance, it shall be controlled by a via an intercom system connecting the vehicular gate to the individual units to ensure the spaces are available for visitor parking. All vehicles must enter and leave the site in a forward direction. Car Parking Visitor carparking must be provided within the site as shown on the submitted drawing titled “Schematic Design for Entrances and Public Areas” prepared by Lisang Design. The carparking area must be designed to comply with the provisions of AS/NZS 2890.1-2004 for user class 1A with allowance for vehicles to enter and leave the site in a forward gear and with a minimum head clearance (headroom) at any point of 2.2m. All carparking must be kept, maintained and line-marked in a condition fit for use. Sediment & Erosion Control Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site control measures such as silt fencing, controlled gravel access to the site and controlled disposal of waste, will be necessary and shall be prepared in accordance with the current version of Council's Manual for Erosion and Sediment control. Roof Water & Stormwater Drainage Stormwater runoff from the proposed storage bays and carparking area shall be controlled on-site and discharged into the existing on-site stormwater drainage system. All site stormwater drainage must be by means of a gravity system. Construction works undertaken in the vicinity of Unitywater water supply or sewerage infrastructure must not adversely affect the integrity of the infrastructure. All costs associated with repair, replacement or alteration of infrastructure must be met by the applicant. General Any damage caused to any public utility during the course of construction must be repaired to Council’s standards and at no cost to Council. Any alteration of any public utility or other facilities necessitated by the development of the land or associated construction works external to the site must be at no cost to Council. The transportation of all materials to and from the site must be undertaken in a manner such that no particle matter escapes onto a public road. All vehicles carrying materials either to or from the site must be covered to prevent materials including dust being windblown from the vehicle. The following advices are for information purposes only and do not form conditions of approval. The applicant is advised that a Compliance Permit for all plumbing and drainage works within the boundaries of the development site must be obtained from Council’s Plumbing Services Section prior to obtaining a Development Permit for Building Works. You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Sustainable Planning Act 2009 is attached. If you wish to obtain more information about Council’s decision, electronic copies of which are available on line at www.sunshinecoast.qld.gov.au, or at Council offices. Yours faithfully Denis Wallace Senior Development Planner Encl. Appeal Rights Approved Plans/Documents Appeal Rights SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING REGULATION 2009 The following is an extract from the Sustainable Planning Act 2009 (Chapter 7) 466 Appeals about decisions relating to permissible changes (1) For a development approval given for a development application, the following persons may appeal to the court against a decision on a request to make a permissible change to the approval— (a) if the responsible entity for making the change is the assessment manager for the application— (i) the person who made the request; or (ii) an entity that gave a notice under section 373 or a pre-request response notice about the request; (b) if the responsible entity for making the change is a concurrence agency for the application—the person who made the request. (2) The appeal must be started within 20 business days after the day the person is given notice of the decision on the request under section 376. (3) Also, a person who has made a request under section 369 may appeal to the court against a deemed refusal of the request. (4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. PD-DA-FM383/5-09/08/2010 Page 3 of 3 PD-DA-FM383/5-09/08/2010 Page 1 of 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
51984.3185.3 Amended Decision correcting applicant detailsRelated documentApplication case desk ↗
About this file
- File size
- 112 KB (small file)
- File type
- DOC
No other editions are linked here.