RECOR Preliminary Stormwater Management Report - 20220198

of 28

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

GENERAL NOTES                                                                           18. DRAWINGS TO BE READ IN CONJUNCTION WITH ARCHITECT, SURVEYOR,                        THAT THE GEOTECHNICAL CONSULTANT BE CONTACTED TO CONFIRM THE                   CONFIRMATION THAT WORKS CAN COMMENCE.
                                                                                            HYDRAULICS, ETC. CONSULTANT AND CONTRACTOR DRAWINGS.                                SOIL CONDITIONS PRIOR TO EARTHWORKS COMMENCING.                            20. ALL EXCAVATIONS ARE TO BE CONDUCTED IN ACCORDANCE WITH THE
1.   ALL DIMENSIONS SHOWN ARE IN METERS UNLESS OTHERWISE SHOWN.                                                                                                             2. GRASS AND TOPSOIL SHALL BE STRIPPED TO A MINIMUM DEPTH OF 100MM                 REQUIREMENTS OF THE GEOTECHNICAL ENGINEER AS OUTLINED IN THE
                                                                                        19. CONTRACTOR TO PREPARE AND HAVE APPROVED BY RELEVANT AUTHORITY:
2.   ALL SETOUT ON SITE IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.                       ROAD OPENING PERMIT AND TRAFFIC MANAGEMENT PLAN FOR ALL WORKS                       OVER THE EXTENT OF THE WORKS UNLESS DIRECTED OTHERWISE AND                     GEOTECHNICAL INVESTIGATION REPORT BY TECTONIC. TEMPORARY
     CONTRACTOR TO ALLOW FOR ALL MEANS NECESSARY TO ACCURATELY                              WITHIN COUNCIL ROAD RESERVES. CONTRACTOR TO ALLOW FOR ALL COSTS                     STOCKPILED WHERE REQUIRED FOR FILL OF LANDSCAPING AREAS. TOPSOIL               UNSURCHARGED CUTS IN LOOSE TO VERY LOOSE SAND TO BE FORMED AT
     SETOUT THE WORKS.                                                                      ASSOCIATED WITH IMPLEMENTATION OF THE TMP.                                          MATERIALS MUST NOT BE USED IN STRUCTURAL FILL.                                 1V:2H, AND IN MEDIUM DENSE SAND AT 1V:1H FOR BATTERS UP TO 3M IN
                                                                                                                                                                            3. UNSUITABLE NATURAL MATERIALS SUCH AS SATURATED, LOOSE OR SOFT                   HEIGHT. DEEPER CUTS ARE TO BE ASSESSED BY THE GEOTECHNICAL
3.   ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH PROJECT                             20. ALL WORKS TO BE COMPLETED IN ACCORDANCE WITH ALL LOCAL AUTHORITY                    MATERIALS ENCOUNTERED SHOULD BE REMOVED DURING SUBGRADE                        ENGINEER.
     SPECIFICATIONS AND WHERE FURTHER DETAILS ARE REQUIRED THE                              APPROVALS RECEIVED FOR THE PROJECT AND IN ACCORDANCE WITH OPW                       PREPARATION FOR BULK EARTHWORKS. ALL UNSUITABLE MATERIAL TO BE             21. WHERE THE ABOVE TEMPORARY BATTER SLOPES CAN NOT BE ACHIEVED,
     CONTRACTOR SHALL REFER TO NOOSA SHIRE COUNCIL DEVELOPMENT                              APPROVALS BY COUNCIL.                                                               REMOVED FROM SITE AT CONTRACTORS EXPENSE.                                      TEMPORARY SHORING WILL BE REQUIRED UNDER THE ADVICE OF A
     GUIDELINES, LOCAL WATER AUTHORITY GUIDELINES, ASSOCIATED STANDARD
                                                                                        21. NO WORKS ARE TO BE UNDERTAKEN ON LAND OUTSIDE OF THE SITE                       4. COMPACTION OF THE EXPOSED SAND SUBGRADE REQUIRES SUBSTANTIAL                    SPECIALIST SHORING CONTRACTOR.
     DRAWINGS AND SPECIFICATIONS U.N.O.
                                                                                            BOUNDARY WITHOUT FORMAL APPROVAL BY THE OWNER/CUSTODIAN OF                          VOLUMES OF WATER COMBINED WITH VIBRATORY COMPACTION EQUIPMENT.             22. EXCAVATIONS IN PROXIMITY TO EXISTING STRUCTURES WILL REQUIRE
3.   SHOULD ANY OF THE CONSTRUCTED WORKS BE CONSTRUCTED OUTSIDE OF                          THAT LAND INCLUDING BUT NOT LIMITED TO PRIVATE PROPERTY, ROAD                       CARE MUST BE TAKEN TO ENSURE THERE ARE NO IMPACTS ON                           SPECIFIC DESIGN TO PREVENT UNDERMINING WHICH SHOULD BE CARRIED
     THE TOLERANCES SPECIFIED WITHIN THE PROJECT SPECIFICATION AND                          RESERVE, PARKS/OPENSPACE, EASEMENTS.                                                SURROUNDING STRUCTURES. MATERIAL TO BE COMPACTED IN ACCORDANCE                 OUT BY A SUITABLY QUALIFIED AND EXPERIENCED RPEQ STRUCTURAL
     LOCAL AUTHORITY REQUIREMENTS, THE CONTRACTOR WILL RECTIFY AT                                                                                                               WITH GEOTECHNICAL REPORT AND AS1289.                                           ENGINEER.
     THEIR COST INCLUSIVE OF ANY ADDITIONAL COSTS INCURRED BY RECOR.                    22. THE CONTRACTOR SHALL HAVE AN APPROVED SET OF CONSTRUCTION
                                                                                            DRAWINGS AND APPROVALS ON SITE AT ALL TIMES.                                    5. A MINIMUM 150MM THICK GRANULAR WORKING PLATFORM MAY BE REQUIRED             23. CONTRACTOR'S RPEQ GEOTECHNICAL ENGINEER IS TO CONFIRM THAT ANY
4.   EXISTING SERVICES HAVE BEEN PLOTTED FROM SUPPLIED DATA AND AS                                                                                                              ON SOIL SUBGRADES ALONG HAUL ROADS AND LAYDOWN AREAS TO                        CONSTRUCTED CUT/FILL BATTERS AND RETAINING STRUCTURES ON THE SITE
     SUCH THEIR ACCURACY CANNOT BE GUARANTEED. NO RESPONSIBILITY IS                     23. ALL WATER AND SEWER RETICULATION WORKS TO BE CONSTRUCTED IN                         IMPROVE TRAFFICABILITY. SPECIFIC PLATFORM DESIGN WOULD BE REQUIRED             HAVE ACHIEVED ADEQUATE STABILITY WITH A LONG-TERM FACTOR OF
     TAKEN BY RECOR OR THE PRINCIPAL FOR THE ACCURACY AND                                   ACCORDANCE WITH THE SEQ WATER SUPPLY AND SEWERAGE DESIGN AND                        PRIOR TO MOBILISATION AND TRAFFICKING OF ANY HEAVY MOBILE PLANT ON             SAFETY AGAINST GEOTECHNICAL FAILURES TO THEIR SATISFACTION.
     COMPLETENESS OF THIS INFORMATION. IT IS THE RESPONSIBILITY OF THE                      CONSTRUCTION CODE (2013).                                                           THE SITE.                                                                  24. EARTHWORKS LEVELS SHOWN ARE FINISHED SURFACE LEVELS INCLUSIVE OF
     CONTRACTOR TO ACCURATELY ESTABLISH THE LOCATION AND LEVEL OF ALL                                                                                                       6. IMPORTED GENERAL FILL MATERIAL SHALL BE SUPPLIED AND COMPACTED                  TOPSOIL LAYER. REFER TO STRUCTURAL ENGINEERING DRAWINGS FOR
     EXISTING SERVICES PRIOR THE COMMENCEMENT OF ANY WORKS. ANY                         STANDARD SIGNS AND LINE MARKING NOTES                                                   WHERE UNSUITABLE NATURAL MATERIALS ARE LOCATED AND AS OTHERWISE                BUILDING SLAB THICKNESSES AND HYDRAULIC DRAWINGS FOR SUB-FLOOR
     DISCREPANCIES SHALL BE REPORTED TO THE SUPERINTENDENT.                                                                                                                     NECESSARY TO OBTAIN SUBGRADE/PLATFORM LEVEL. IMPORTED GENERAL                  DRAINAGE FOR DETERMINATION OF REQUIRED BULK EARTHWORKS SURFACE.
     CONTRACTOR TO LOCATE AND PROTECT SERVICES AS REQUIRED DURING                       1. GENERAL                                                                              FILL MATERIAL SHALL BE CLEAN GRADED MATERIAL FREE OF ORGANIC               25. ANY PRELOADING REQUIRED IS TO OCCUR IN ACCORDANCE WITH THE
     PROPOSED WORKS.                                                                      1.1. ALL SIGNS AND PAVEMENT MARKING IS TO BE IN ACCORDANCE WITH THE                   MATTER AND STONES, WITH MAXIMUM PARTICLE SIZE OF 100mm AND                     GEOTECHNICAL ENGINEERS REQUIREMENTS. CONTRACTOR TO ALLOW FOR
5.   THE CONTRACTOR IS TO CHECK THROUGH LOCATING, POTHOLING AND                                QUEENSLAND TRANSPORT MANUAL OF UNIFORM TRAFFIC CONTROL                           CAPABLE OF BEING COMPACTED INTO COHERENT FILLING TO THE SPECIFIED              THE IMPORT AND REMOVAL OF ALL NECESSARY MATERIAL TO UNDERTAKE
     SURVEY ALL CRITICAL CONNECTION POINTS FOR ALL CIVIL WORKS SHOWN                           DEVICES (CURRENT EDITION).                                                       STANDARD. THE MATERIAL SHALL HAVE A MAXIMUM PLASTICITY INDEX OF                THE PRELOADING OPERATIONS.
     ON THE DRAWINGS INCLUDING ANY POTENTIAL EXISTING SERVICES CLASHES                  2. SIGNS                                                                                15%, A SHRINK-SWELL INDEX OF LESS THAN OR EQUAL TO 1% AND A MINIMUM        26. REFER ARCHITECTURAL DRAWINGS FOR BUILDING SETOUT.
     PRIOR TO COMMENCEMENT OF CIVIL WORKS. CONTRACTOR TO IMMEDIATELY                      2.1. ALL SIGNS TO BE REFLECTORISED CLASS 1 TO AS1906.1:2007 UNLESS                    C.B.R. OF 10%.
     REPORT ANY DISCREPANCIES TO RECOR AND AWAIT FORMAL DIRECTION                              NOTED OTHERWISE.                                                             7. ALL EARTHWORKS TO BE CARRIED OUT AT +/- 2% OPTIMUM MOISTURE
     PRIOR TO COMMENCING CIVIL WORKS.                                                     2.2. SIGNS ARE TO BE INSTALLED WITH THE FOLLOWING CLEARANCES TO                       CONTENT FOR STANDARD COMPACTION.                                           INSPECTIONS:
                                                                                               EDGE OF SIGN: LOCATION CLEARANCE NO KERB 600 BEHIND GUIDE                    8. ANY PROPOSED RETAINING WALL WORKS MUST BE WHOLLY WITHIN THE                 THE FOLLOWING INSPECTIONS MUST BE COMPLETED BY RECOR ENGINEERS
6.   ON COMPLETION OF SERVICES INSTALLATION, ALL DISTURBED AREAS SHALL                                                                                                          PROPERTY BOUNDARY OF THE SUBJECT SITE, INCLUDING REAR OF
                                                                                               POSTS BARRIER KERB 300 FROM FACE MOUNTABLE KERB 500 FROM FACE                                                                                               BEFORE ENGINEERING CERTIFICATION WILL BE ISSUED. THE CONTRACTOR IS TO
     BE RESTORED TO ORIGINAL LEVEL, INCLUDING KERBS, FOOTPATHS,                                                                                                                 RETAINING WALL DRAINAGE INFRASTRUCTURE FOR RETAINING WALLS IN CUT.
                                                                                               OF KERB.                                                                                                                                                    PROVIDE A MINIMUM OF 72 HOURS NOTICE TO RECOR FOR REQUIRED
     CONCRETE AREAS, GRAVEL AREAS, GRASSED AREAS AND ROAD PAVEMENTS.                                                                                                            RETAINING WALLS ARE TO BE PREPARED IN ACCORDANCE WITH STRUCTURAL
                                                                                          2.3. PARKING CONTROL SIGNS TO BE MOUNTED TO FACE APPROACHING                                                                                                     INSPECTIONS. SHOULD THE
7.   CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO                               TRAFFIC AT 45° TO KERB OR CARRIAGEWAY EDGE. ALL OTHER SIGNS TO                   ENGINEERS SPECIFICATIONS, AND IN CONFORMANCE WITH CONSTRUCTION
     AUTHORITY/COUNCIL'S INFRASTRUCTURE. SUCH REPAIR OR REINSTATEMENT                                                                                                           REQUIREMENTS OF GEOTECHNICAL REPORT.                                       CONTRACTOR FAIL TO REQUEST AN INSPECTION, THE CONTRACTOR WILL BE
                                                                                               BE TURNED AWAY BY 5° FROM THE NORMAL TO APPROACHING
     TO BE CARRIED OUT IMMEDIATELY TO THE SATISFACTION OF                                                                                                                                                                                                  RESPONSIBLE FOR ALL COSTS TO ALLOW FOR THE WORKS TO BE INSPECTED TO
                                                                                               HEADLIGHT.                                                                   9. REFER ARCHITECT/LANDSCAPE ARCHITECT DRAWINGS FOR CONFIRMATION
     INFRASTRUCTURE OWNER/MANAGER / AUTHORITY/COUNCIL.                                                                                                                                                                                                     THE SATISFACTION OF RECOR. ANY INSPECTIONS THAT FAIL ARE TO BE
                                                                                        3. SIGN SUPPORTS                                                                        OF RETAINING WALL COLOUR AND FINISH.
                                                                                                                                                                                                                                                           RE-INSPECTED WITH ALL REINSPECTION COSTS TO BE PAID BY THE CONTRACTOR.
8.   CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH ALL                             3.1.  SLEEVED SIGNS SUPPORTS ARE TO BE PROVIDED IN ALL AREAS WHERE                10. ALL EARTHWORKS OPERATIONS SHALL BE CARRIED OUT WITH 'LEVEL 2' SOIL
     WORKPLACE HEALTH AND SAFETY REQUIREMENTS.                                                 THEY ARE IN A PAVED SURFACE.                                                     ENGINEERING SUPERVISION IN ACCORDANCE WITH APPENDIX B OF AS 3798.          a.    PRESTART
                                                                                        4. LINEMARKING                                                                          THE NOMINATED GEOTECHNICAL TESTING AUTHORITY SHALL PROVIDE                 b.    EARTHWORKS - FINAL STRIPPING OF TOPSOIL, INSTALLATION OF SEDIMENT
9.   WHERE ANY EXCAVATION OR CONSTRUCTION WORKS ARE TO BE IN CLOSE                                                                                                              CERTIFICATION THAT ALL GENERAL EARTHWORKS OPERATIONS HAVE BEEN
     PROXIMITY TO NEIGHBOURING LOT BOUNDARIES OR INFRASTRUCTURE,                          4.1. REDUNDANT LINEMARKING IS TO BE GROUND OFF.                                                                                                                        AND EROSION CONTROL MEASURES UNSUITABLE GROUND
                                                                                                                                                                                CARRIED OUT IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS
     CONTRACTOR TO ALLOW IN SCOPE OF WORKS TO PROVIDE ALL MEASURES                        4.2. THERMOPLASTIC LINEMARKING TO BE USED FOR ALL CONCRETE.                           AND THE CONTROLLED FILL IS SUITABLE FOR PURPOSE TO THE REQUIRED            c.    SIDE AND CUT OFF DRAINS
     NECESSARY TO ENSURE THE INTEGRITY OF EXISTING BOUNDARIES AND                                                                                                               BEARING CAPACITY UNDER THE PLATFORM/STRUCTURES AS SPECIFIED BY             d.    STORMWATER PIPE LAID ON BEDDING PRIOR TO BACKFILL
     INFRASTRUCTURE. THIS MAY INCLUDE THE USE OF LOW VIBRATION                          JOINTING NOTES                                                                          THE GEOTECHNICAL REPORT.
     EQUIPMENT, TRENCH SHORING ETC AS REQUIRED.                                                                                                                                                                                                            e.    STORMWATER TRENCH BACKFILLED PRIOR TO PAVEMENT PLACEMENT
                                                                                                                                                                            11. ALL EARTHWORKS FILL AND EXCAVATED AREAS SHALL BE COMPACTED TO
10. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON THESE                      1.      ALL JOINTING AND CONCRETE TO BE IN ACCORDANCE WITH THE                          98% STANDARD MAXIMUM DRY DENSITY OR A DRY DENSITY INDEX OF AT              f.    STORMWATER STRUCTURE BASE SLABS
    DRAWINGS, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE WRITTEN                             REQUIREMENTS OF AS3727.1:2016.                                                  LEAST 75% IN ACCORDANCE WITH THE GEOTECHNICAL REPORT IN LAYERS OF
                                                                                                                                                                                                                                                           g.    SEWER RETICULATION
    CONFIRMATION THAT WORKS CAN COMMENCE.                                               2.      SAW CUT JOINTS MUST BE:                                                         250MM LOOSE THICKNESS (PRIOR TO COMPACTION).
                                                                                                                                                                            12. COMPACTION TESTING TO BE CARRIED OUT AT A MINIMUM OF TWO TESTS             h.    WATER RETICULATION
11. CONTRACTOR TO PROVIDE AS CONSTRUCTED DRAWINGS FOR ALL
                                                                                             2.1.
                                                                                                           1   1
                                                                                                    BETWEEN AND OF CONCRETE PAVEMENT DEPTHS.                                    PER VERTICAL LIFT WHERE STRUCTURAL FILL HEIGHTS EXCEED 300MM IN
    CONSTRUCTED WORKS IN ACCORDANCE WITH LOCAL GOVERNMENT                                                  4   3                                                                                                                                           i.    PAVEMENT SUBGRADE
    REQUIREMENTS. UNLESS OTHERWISE ADVISED BY RECOR CONTRACTOR TO                                                                                                               ACCORDANCE WITH AS3798. CONTRACTOR TO UNDERTAKE ALL
                                                                                          2.2.   CLEARED OF ANY DEBRIS FROM THE CUTTING METHOD.                                                                                                             j.   PAVEMENT REINFORCING
    NOTE COUNCILS ADAC REQUIREMENTS.                                                                                                                                            EARTHWORKS TESTING IN ACCORDANCE WITH GEOTECHNICAL ENGINEER
                                                                                          2.3.  PERFORMED WITHIN 6 TO 12 HOURS OF FINISHING CONCRETE POURS.                     AND LOCAL AUTHORITY REQUIREMENTS.                                          k.    PAVEMENT PRIOR TO SEALING (PRESEAL)
12. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH RELEVANT                       3. DOWELL BARS MUST BE INSTALLED EXACTLY 90° TO THE FACE OF JOINT TO                13. FINISHED SURFACES TO ALL DISTURBED AREAS ARE TO BE TREATED IN
    APPROVALS.                                                                               ALLOW EXPANSION AND CONTRACTION MOVEMENTS.                                                                                                                    l.    RETAINING WALL FOOTING REINFORCING
                                                                                                                                                                                ACCORDANCE WITH LANDSCAPE DRAWINGS.
13. CONTRACTOR TO ALLOW TO LIASE/CO-ORDINATE WITH ELECTRICAL,                           4. JOINTING LAYOUT TO BE CONFIRMED BY SUPERINTENDANT PRIOR TO                       14. ALL NEW WORKS TO MATCH NEATLY INTO EXISTING LEVELS.                        m. RETAINING WALL BLOCKWORK PRIOR TO CORE FILL
    LANDSCAPE AND OTHER SERVICE CONTRACTORS THROUGHOUT CIVIL                                 CONSTRUCTION COMMENCING. LAYOUT SHOULD AVOID ACUTE ANGLES IN
                                                                                                                                                                            15. ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH APPROVED                    n.    STEEL REINFORCEMENT OF CONCRETE STRUCTURES
    CONSTRUCTION.                                                                            THE CONCRETE SLAB AND AVOID MISMATCHED JOINTS.
                                                                                                                                                                                MANAGEMENT PLANS.
                                                                                        5. JOINT SEALANTS WHERE USED MUST ADHERE TO SIDE OF JOINT FACES ONLY                                                                                               o.    PRACTICAL COMPLETION
14. CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS PRIOR DEMOLITION                                                                                                          16. CONTRACTOR TO ENSURE SUITABLE EROSION CONTROL MEASURES ARE
                                                                                             AND SHALL NOT EXTEND ABOVE SIDES OF JOINTS ONTO THE SLAB SURFACE.                                                                                             p.    ON MAINTENANCE
    WORKS COMMENCING ON SITE.                                                                                                                                                   INSTALLED INCLUDING BUT NOT LIMITED TO SHAKE DOWNS, SILT FENCE ETC
                                                                                        6. DOWEL BARS ARE TO BE                                                                 IN ACCORDANCE WITH EROSION AND SEDIMENT CONTROL PLAN.
15. CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES, ROADS                                                                                                                                                                                         q.    OFF MAINTENANCE
                                                                                          6.1.  FOR 100MM THICK SLAB, 12MM Ø OF LENGTH 300MM AND SPACED AT                  17. ADEQUATE SAFETY FENCING/BARRIERS TO BE APPLIED TO ALL BATTERS OR
    AND SERVICES WITHIN LIMIT OF WORKS AND REMOVE FROM SITE U.N.O.                               400MM CENTRES                                                                                                                                             r.    ANY OTHER INSPECTION AS SPECIFIED BY LOCAL COUNCIL (REFER
                                                                                                                                                                                RETAINING WALLS (TEMPORARY OR PERMANENT) AS PER RELEVANT
16. CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING                             6.2.  FOR 125MM THICK SLAB, 16MM Ø OF LENGTH 350MM AND SPACED AT                      AUSTRALIAN STANDARDS AND LEGISLATION.                                            DEVELOPMENT APPROVAL)
    PROPERTIES AND COUNCIL ROADS AND VERGES PRIOR TO COMMENCEMENT                                300MM CENTRES                                                              18. DUST CONTROL MEASURES ARE TO INCLUDE SPRAYING WATER ON UNPAVED             s.    ANY OTHER INSPECTION AS REQUIRED BY UNITY WATER AND WHERE
    OF ANY WORKS ON SITE.                                                                 6.3.  FOR 150MM THICK SLAB, 20MM Ø OF LENGTH 400MM AND SPACED AT                      ROADS, ACCESS TRACKS AND STOCKPILES AT A SUFFICIENT LEVEL TO                     RELEVANT TO THEIR CERTIFICATION SCHEME
17. CONTRACTOR TO CLEAR AND GRUB ALL VEGETATION ON SITE AS IDENTIFIED                            300MM CENTRES                                                                  SUPPRESS DUST GENERATION. ADDITIONALLY CONTRACTORS ARE TO COVER
    IN THE APPROVED VEGETATION MANAGEMENT PLAN. CONTRACTOR TO                                                                                                                   OR ENCLOSE STOCKPILES WHERE REASONABLY PRACTICAL TO RESTRICT
    ENSURE ALL TREE ROOTS AND STUMPS ARE COMPLETELY REMOVED AND                         EARTHWORKS NOTES                                                                        DUST MOVEMENT.
    BACKFILLED TO LEVEL 1 SUPERVISION. CONTRACTOR TO ALLOW TO MULCH                                                                                                         19. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON THIS
                                                                                        1.      FOR DETAILED GEOTECHNICAL INFORMATION, REFER GEOTECHNICAL                       DRAWING, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE WRITTEN
    ALL CLEARED VEGETATION AND STOCKPILE ON SITE OR REMOVE FROM SITE
                                                                                                INVESTIGATION REPORT BY GEOTECHNICAL ENGINEER. IT IS RECOMMENDED
    AS DIRECTED.




                                                                                                                  CLIENT DETAILS:                                     PROJECT ADDRESS:                                       APPROVED BY:              PROJECT NAME:

                                                                                                                                                                                                                                                       3 DELORME STREET, NOOSA HEADS
                                                                                                                                    CAPITAL PRUDENTIAL                                                                                                 TITLE:                                     STATUS:

                                                                                                                                                                                                                                                       GENERAL NOTES                              FOR APPROVAL
          © ABN 89 647 469 707
                                                                                                                                                                       3 DELORME STREET, NOOSA HEADS                                  JARO BAULEKA                                                NOT FOR CONSTRUCTION
           75 NOOSA DRIVE                                                                                                                                                                                                               RPEQ: 2693
                                             01   28/08/222   ISSUED FOR APPROVAL             MVP    JAC    JB    SCALE:
        NOOSA HEADS, QLD 4567                                                                                                                                                                                                             CPEng
            +61 7 5211 1003                 REV    DATE               DESCRIPTION            DWN     CHK    APP
                                                                                                                                        AS INDICATED                                                                                  DATE: 26/08/22
                                                                                                                                                                                                                                                       DRAWING NUMBER:                            PROJECT NUMBER:                    SHEET REV:
                                                                                                                                                                                                                                                                                                                                      SIZE:
        RECORCONSULTING.COM                                                 REVISIONS
                                                                                                                                      DO NOT SCALE, IF IN DOUBT ASK
                                                                                                                                                                                                                                                       002                                        20220198                           A1 01
Log in to download the original file

RECOR Preliminary Stormwater Management Report - 20220198.pdf · 4.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.