RECOR Preliminary Stormwater Management Report - 20220198

of 28

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                                                                                         1 METER MAX.              STAR PICKETS

                                             PROVIDE WASH WATER FOR                                                                                                DROP INLET
TIMBER SLEEPER OR METAL                                                                                                                                            WITH GRATE
                                             TRUCKS EXITING SITE
GRID 100mm HIGH AND                                                                                                                                                WIRE OR STEEL MESH
SPACED AT 300mm CTS                              MIN LEN                                                                                                           (14 GAUGE x 150mm                                                                                                    WRAP FILTER




                                                                                                                                                                                                                                                                                                                                                500 - 600mm
                                                        GTH 10m
                                                                                  BERM 300 HIGH MIN                                                                OPENINGS) WHERE GEOTEXTILE                                                                                           CLOTH OVER GRATE
  CONSTRUCTION SITE                                                                                                                                                IS NOT SELF-SUPPORTING
                                                                                                                                                                   WOVEN GEOTEXTILE                                                                                                                                                                                                       1.5m STAR
                                                                                       EXISTING ROADWAY                                                                                                                                                                                                                                                                                   PICKETS
                                                                                                                                                                                                                                                                                                                                                                                          AT MAX. 2.5m CENTRES

  GEOTEXTILE FABRIC                                                                                                                                           STAR PICKET                                                                                                                                                                                                              SELF-SUPPORTING
                                                                                                                                                              FITTED WITH                                                                                                                                                                                                              GEOTEXTILE
                                             50-75mm GRAVEL BED                                                                                               SAFETY CAP                                                                                                                                                                                                                           OW
                                             MIN 200mm THICK                                                                                                                                                                                                                                                                                                                       DIRECTION OF FL
                 RUNOFF FROM PAD DIRECTED                                                                 SANDBAGS                                      WOVEN GEOTEXTILE
                 TO SEDIMENT TRAP
                                                                                                                                                                 RUNOFF                                                                         WRAP FILTER
                                                                                                                                                                                                                          RUNOFF                                                                                                                                                          ON SOIL, 150mm x 100mm
           TEMPORARY CONSTRUCTION VEHICLE EXIT                                                                                                                   WATER WITH                                                                     CLOTH OVER GRATE




                                                                                                                                 FLOW
                                                                                                                                                                                                                          WATER WITH                                                                                                                                                      TRENCH WITH
                                   SCALE: N.T.S.                                                          WATERWAY                                               SEDIMENT
                                                                                                                                                                                                                          SEDIMENT                                                                                                                                                        COMPACTED BACKFILL
                                                                                                                                                                                                                                                                                                                                                                                          AND ON ROCK, SET INTO
                                                                                                          EXCAVATION                                                                                                                                                                                                                                                                      SURFACE CONCRETE
                                                                                                                                                                                                                                                                                                                                                                      SECTION DETAIL




                                                                                                                                                                                                                                                                                                                                                600mm MIN.
                                                                                                                                                                                           FILTERED                                                               FILTERED
                                                                                                                                                                                            WATER                                                                  WATER
                                                                                                                                                                GEOTEXTILE
                                                                                                          EARTH BANK                                            EMBEDDED 150mm
                                                                                                                                                                INTO GROUND                                                                                                                                                                                                    20m MAX.




                                                                                                                                                                                                                                                                                                                            MIN. 1.5m
                                                                                                                                                        FOR DROP INLETS AT NON-SAG POINTS,                                       GEOTEXTILE INLET FILTER TYPE B                                                                                                                              FLOW
                                                                                                                                                        SANDBAGS, EARTH BANK OR EXCAVATION                                                           SCALE N.T.S
                                                                                                                                                        USED TO CREATE ARTIFICIAL SAG POINT                                                                                                                                                              STAR PICKETS AT
                                                                                                                                                                                                                                                                                                                                                         MAX. 2.5m SPACINGS
                                                                                                            GEOTEXTILE INLET FILTER CONSTRUCTION NOTES:                                                                                                                                                                                                  TYPICAL
                                                                                                            1. FABRICATE A SEDIMENT BARRIER MADE FROM GEOTEXTILE OR STRAW BALES.

                                                                                                            2.   PICKET SPACING TO BE A MAXIMUM 1.0m CENTRES.                                                                                                                                                                                                                   PLAN

                                                                                                            3.   IN WATERWAYS, ARTIFICIAL SAG POINTS CAN BE CREATED WITH SANDBAGS
                                                                                                                 OR EARTH BANKS AS SHOWN IN THE DRAWING.

                                                                                                            4.   DO NOT COVER THE INLET WITH GEOTEXTILES UNLESS THE DESIGN IS
                                                                                                                                                                                                                                                                                                                                                              DISTURBED             DIRECTION           1.5m STAR PICKETS
                                                                                                                 ADEQUATE TO ALLOW FOR ALL WATERS TO BYPASS IT.
                                                                                                                                                                                                                                                                                                                                                              AREA                  OF FLOW             AT MAX. 2.5m
                                                                                                                        GEOTEXTILE INLET FILTER A                                                                                                                                                                                                                                                       CENTRES
                                                                                                                                               SCALE N.T.S

                  TIMBER SPACER                       KERB-SIDE
                  TO SUIT                             INLET




                                                                                                                                                                                                                                                                                                                                                              UNDISTURBED
                                                                                                                                                                                                                                                                                                                                                              AREAS

                                                    GRAVEL-FILLED WIRE
                                                    MESH OR GEOTEXTILE
                                                    "SAUSAGE"
                            OVERFLOW         TIMBER SPACER
  RUNOFF                                                                                                                GRADIENT OF
  WATER WITH                                 TO SUIT                                                                                                            CAN BE CONSTRUCTED         ALL BATTER
                                                                                                                        DRAIN 1% TO 5%
  SEDIMENT                                                                                                                                                      WITH OR WITHOUT            GRADES 2(H):1(V)
                                                                                                                                                                CHANNEL                                                                                                                                                SEDIMENT FENCE CONSTRUCTION NOTES:
                                                                                                                                                                                           MAX.                                                                        STABILISE STOCKPILE SURFACE
                                                                                                                        DIRECTION O                                                                                                                                                                                    1. CONSTRUCT SEDIMENT FENCES AS CLOSE AS POSSIBLE TO BEING PARALLEL
                                                                                                                                               F FLOW                                                              EARTH BANK                                        2:1                                                   TO THE CONTOURS OF THE SITE, BUT WITH SMALL RETURNS AS SHOWN IN THE
    SEDIMENT                                                                                                                                                                                                                                            A   X.)            SLO                                             DRAWING TO LIMIT THE CATCHMENT AREA OF ANY ONE SECTION. THE




                                                                                                                                                                                               300mm MIN.
                                                                                                                                                                                                                                                   E (M                          PE
                                                                                                                                                                                                                          FLOW               LOP                                      (MA                                  CATCHMENT AREA SHOULD BE SMALL ENOUGH TO LIMIT WATER FLOW IF
      GRAVEL-FILLED WIRE                             FILTERED WATER                                                                                                                                                                     2:1 S                                               X.)
                                                                                                                                                                                                                                                                                                                           CONCENTRATED AT ONE POINT TO 50 LITRES PER SECOND IN THE DESIGN
      MESH OR GEOTEXTILE                                                                                                                                                                                                                                                                                                   STORM EVENT, USUALLY THE 10-YEAR EVENT.
                                                                                                                                                                    2m MIN
      "SAUSAGE"
                                                                                                                             150mm MIN




      MESH & GRAVEL INLET FILTER CONSTRUCTION NOTES:                                                                                      NOTE: ONLY TO BE USED AS TEMPORARY                                                                                       SEDIMENT FENCE                                      2.               CUT A 150mm DEEP TRENCH ALONG THE UPSLOPE LINE OF THE FENCE FOR
      1. INSTALL FILTERS TO KERB INLETS ONLY AT SAG POINTS.                                                                               BANK WHERE MAXIMUM UPSLOPE LENGTH                                                                                                                                                             THE BOTTOM OF THE FABRIC TO BE ENTRENCHED.
                                                                                                                                          IS 80 METRES.
                                                                                                                                                                                                                     STOCKPILE CONSTRUCTION NOTES:                                                                     3.               DRIVE 1.5m LONG STAR PICKETS INTO GROUND AT 2.5m INTERVALS (MAX.) AT
      2.   FABRICATE A SLEEVE MADE FROM GEOTEXTILE OR WIRE MESH LONGER THAN                                             DIVERSION DRAIN CONSTRUCTION NOTES:
           THE LENGTH OF THE INLET PIT AND FILL IT WITH 25mm TO 50mm GRAVEL.                                                                                                                                         1.     PLACE STOCKPILES MORE THAN 2 (PREFERABLY 5) METRES FROM EXISTING                                            THE DOWNSLOPE EDGE OF THE TRENCH. ENSURE ANY STAR PICKETS ARE
                                                                                                                        1. BUILD WITH GRADIENTS BETWEEN 1% AND 5%.
                                                                                                                                                                                                                            VEGETATION, CONCENTRATED WATER FLOW, ROADS AND HAZARD AREAS.                                                FITTED WITH SAFETY CAPS.
      3.   FORM AN ELLIPTICAL CROSS-SECTION ABOUT 150mm HIGH x 400mm WIDE.                                              2.      AVOID REMOVING TREES AND SHRUBS IF POSSIBLE - WORK AROUND THEM.
                                                                                                                                                                                                                     2.     CONSTRUCT ON THE CONTOUR AS LOW, FLAT, ELONGATED MOUNDS.                                   4.               FIX SELF-SUPPORTING GEOTEXTILE TO THE UPSLOPE SIDE OF THE POSTS
      4.   PLACE THE FILTER AT THE OPENING LEAVING AT LEAST A 100mm SPACE                                                                                                                                                                                                                                                               ENSURING IT GOES TO THE BASE OF THE TRENCH. FIX THE GEOTEXTILE WITH
                                                                                                                        3.     ENSURE THE STRUCTURES ARE FREE OF PROJECTIONS OR OTHER
           BETWEEN IT AND THE KERB INLET. MAINTAIN THE OPENING WITH SPACER                                                                                                                                           3.     WHERE THERE IS SUFFICIENT AREA, TOPSOIL STOCKPILES SHALL BE LESS                                            WIRE TIES OR AS RECOMMENDED BY THE MANUFACTURER. ONLY USE
                                                                                                                               IRREGULARITIES THAT COULD IMPEDE WATER FLOW.
           BLOCKS.                                                                                                                                                                                                          THAN 2 METRES IN HEIGHT.                                                                                    GEOTEXTILE SPECIFICALLY PRODUCED FOR SEDIMENT FENCING. THE USE OF
                                                                                                                        4.     BUILD THE DRAINS WITH CIRCULAR, PARABOLIC OR TRAPEZOIDAL                                                                                                                                                 SHADE CLOTH FOR THIS PURPOSE IS NOT SATISFACTORY.
      5.   FORM A SEAL WITH THE KERB TO PREVENT SEDIMENT BYPASSING THE FILTER.                                                                                                                                       4.     WHERE THEY ARE TO BE PLACE FOR MORE THAN 10 DAYS, STABILISE
                                                                                                                               CROSS-SECTIONS, NOT "V" SHAPED.
                                                                                                                                                                                                                            FOLLOWING THE APPROVED ESCP OR SWMP TO REDUCE THE C-FACTOR TO                              5.               JOIN SECTIONS OF FABRIC AT A SUPPORT POST WITH A 150mm OVERLAP.
      6.   SANDBAGS FILLED WITH GRAVEL CAN SUBSTITUTE FOR THE MESH OR                                                                                                                                                       LESS THAN 0.10.
                                                                                                                        5.     ENSURE BANKS ARE PROPERLY COMPACTED TO PREVENT FAILURE.
           GEOTEXTILE PROVIDING THEY ARE PLACED SO THAT THEY CAN FIRMLY ABUT                                                                                                                                                                                                                                           6.               BACKFILL THE TRENCH OVER THE BASE OF THE FABRIC AND COMPACT IT
           EACH OTHER AND SEDIMENT-LADEN WATERS CANNOT PASS BETWEEN.                                                                                                                                                 5.     CONSTRUCT EARTH BANKS ON THE UPSLOPE SIDE TO DIVERT WATER AROUND                                            THOROUGHLY OVER THE GEOTEXTILE.
                                                                                                                        6.     COMPLETE PERMANENT OR TEMPORARY STABILISATION WITHIN 10 DAYS OF
                                                                                                                                                                                                                            STOCKPILES AND SEDIMENT FENCES 1 TO 2 METRES DOWNSLOPE.
                                                                                                                               CONSTRUCTION.
                    MESH & GRAVEL INLET FILTER                                                                                                          DIVERSION DRAIN                                                                                 STOCKPILES                                                                                               SEDIMENT FENCE
                                   SCALE N.T.S                                                                                                                SCALE N.T.S                                                                                         SCALE N.T.S                                                                                             SCALE: N.T.S.




                                                                                                                                           CLIENT DETAILS:                                                    PROJECT ADDRESS:                                                                    APPROVED BY:                                 PROJECT NAME:

                                                                                                                                                                                                                                                                                                                                               3 DELORME STREET, NOOSA HEADS
                                                                                                                                                             CAPITAL PRUDENTIAL                                                                                                                                                                TITLE:                                                       STATUS:

                                                                                                                                                                                                                                                                                                                                               EROSION SEDIMENT                                             FOR APPROVAL
                                                                                                                                                                                                               3 DELORME STREET, NOOSA HEADS                                                                                                                                                                NOT FOR CONSTRUCTION
            © ABN 89 647 469 707                                                                                                                                                                                                                                                                           JARO BAULEKA                        CONTROL DETAILS
              75 NOOSA DRIVE                                                                                                                                                                                                                                                                                 RPEQ: 2693
                                                           01   28/08/222   ISSUED FOR APPROVAL           MVP     JAC        JB            SCALE:
           NOOSA HEADS, QLD 4567                                                                                                                                                                                                                                                                               CPEng
               +61 7 5211 1003                        REV        DATE               DESCRIPTION           DWN     CHK        APP
                                                                                                                                                                 AS INDICATED                                                                                                                              DATE: 26/08/22
                                                                                                                                                                                                                                                                                                                                               DRAWING NUMBER:                                              PROJECT NUMBER:   SHEET REV:
                                                                                                                                                                                                                                                                                                                                                                                                                               SIZE:
           RECORCONSULTING.COM                                                             REVISIONS
                                                                                                                                                               DO NOT SCALE, IF IN DOUBT ASK
                                                                                                                                                                                                                                                                                                                                               031                                                          20220198          A1 01
Log in to download the original file

RECOR Preliminary Stormwater Management Report - 20220198.pdf · 4.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.