Skip to the record
Accept no imitations.

Original source · versioned page text

RECOR Preliminary Stormwater Management Report - 20220198

of 28

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

DRAINS Modelling Results
Project number:    20220198                                                                 Calculations:          B. Parry
Street Address:    3 Delorme St
Locality:          Noosa Heads, NSC                                                         Date:                  19/08/2022




Pre / Post Comparison (To Delorme St)


A.E.P                 Qy Pre (m3/s)             Qy Post (m3/s) Qchange (m3/s)               Qchange (%)
          63.2% AEP                     0.021             0.024                    0.003                    14%
           50% AEP                      0.025             0.028                    0.003                    12%
           20% AEP                      0.039             0.041                    0.002                     5%
           10% AEP                      0.045             0.050                    0.005                    11%
             5% AEP                     0.057             0.057                    0.000                     0%
             2% AEP                     0.065             0.065                    0.000                     0%
             1% AEP                     0.071             0.072                    0.001                     1%




Pre / Post w/ OSD Comparison (To Delorme St)                                                                                    Tank Node Assumptions
A.E.P               Qy Pre (m3/s)          Qy Post (m3/s)         Qchange (m3/s)            Qchange (%)                         https://kingspanwatertanks.com.au/product/3000-litre-slimline-tank/
          63.2% AEP                     0.021             0.021                     0.000                     0%                2x3kL slimline tanks
           50% AEP                      0.025             0.024                    -0.001                    -4%                Total Area                         3.5 m²
           20% AEP                      0.039             0.033                    -0.006                   -15%                Low flow orifice                    81 mm
           10% AEP                      0.045             0.041                    -0.004                    -9%                                                    57 mm/tank
             5% AEP                     0.057             0.049                    -0.008                   -14%                Overflow                          100 mm
             2% AEP                     0.065             0.063                    -0.002                    -3%                Tank Height                       1.86 m
             1% AEP                     0.071             0.071                     0.000                     0%                Overlow height                    1.76 m
Log in to download the original file

RECOR Preliminary Stormwater Management Report - 20220198.pdf · 4.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.