RECOR Preliminary Stormwater Management Report - 20220198
DRAINS Modelling Results Project number: 20220198 Calculations: B. Parry Street Address: 3 Delorme St Locality: Noosa Heads, NSC Date: 19/08/2022 Pre / Post Comparison (To Delorme St) A.E.P Qy Pre (m3/s) Qy Post (m3/s) Qchange (m3/s) Qchange (%) 63.2% AEP 0.021 0.024 0.003 14% 50% AEP 0.025 0.028 0.003 12% 20% AEP 0.039 0.041 0.002 5% 10% AEP 0.045 0.050 0.005 11% 5% AEP 0.057 0.057 0.000 0% 2% AEP 0.065 0.065 0.000 0% 1% AEP 0.071 0.072 0.001 1% Pre / Post w/ OSD Comparison (To Delorme St) Tank Node Assumptions A.E.P Qy Pre (m3/s) Qy Post (m3/s) Qchange (m3/s) Qchange (%) https://kingspanwatertanks.com.au/product/3000-litre-slimline-tank/ 63.2% AEP 0.021 0.021 0.000 0% 2x3kL slimline tanks 50% AEP 0.025 0.024 -0.001 -4% Total Area 3.5 m² 20% AEP 0.039 0.033 -0.006 -15% Low flow orifice 81 mm 10% AEP 0.045 0.041 -0.004 -9% 57 mm/tank 5% AEP 0.057 0.049 -0.008 -14% Overflow 100 mm 2% AEP 0.065 0.063 -0.002 -3% Tank Height 1.86 m 1% AEP 0.071 0.071 0.000 0% Overlow height 1.76 m
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.