Council archive · source document
Decision Notice - Change to an Existing Approval - 010.2008.00001616.002 [As Published] · 172008.1616.02
2008/1616
Plan / Document No. Rev. Plan / Document Name Date
Sheet 2 3 Lower Floor Plan – Garlandesign 12 April 2009
Sheet 3 3 Upper Floor Plan – Garlandesign 12 April 2009
Sheet 4 3 Northern Side Elevation – Garlandesign 12 April 2009
Sheet 5 3 Western Rear Elevation & Eastern 12 April 2009
Front Elevation – Garlandesign
Sheet 6 3 Southern Side Elevation – 12 April 2009
Garlandesign
Sheet 7 3 Longitudinal Section A.A & Cross 12 April 2009
Section B.B – Garlandesign
Sheet 8 3 Roof Plan – Garlandesign 12 April 2009
and may be amended by these conditions and annotations on the plans.
2. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
3. Earthworks required on site shall be carried out in accordance with Council’s Planning
Scheme Policy PSP5 – Engineering Design Standards, so as not to cause the additional
ponding of water on any adjoining lands or concentrate or direct overland flow on to an
adjoining property.
4. The garage shall not exceed 8.0 metres above natural and finished ground level.
5. A verification survey of the garage is to be carried out by a Licensed Surveyor and a certificate
lodged with Council at completion of work confirming compliance with the maximum allowable
building height as required by either the conditions of approval or the Planning Scheme.
6. Existing trees on the site and within road reserves are to be retained, except where required to
be removed due to building operations or the conduct of the approved use.
7. All other vegetation shall be protected from interference resulting from clearing or construction
activities by:
7.1 Clearly marking vegetation to be retained with flagging tape;
7.2 Installing protective fencing around the drip line of the vegetation;
7.3 Low impact construction techniques are used around vegetation to minimise
interference with the vegetation.
8. Cleared vegetation is to be suitably processed by one of the following methods and removed
from the site:-
8.1 Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a
minimum of 10 metres between edges of heaps.
8.2 Disposal for firewood.
8.3 Disposal for landscaping purposes.
8.4 Transport to alternative site for breaking down materials provided that all necessary
permits have been obtained to allow the alternate site to be used for this purpose.
8.5 The Applicant is advised that other methods may be considered provided full details of
the method are submitted.
Page 2 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval - 010.2008.00001616.002 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 58 KB (small file)
- File type
No other editions are linked here.