Information Request MCU22 0201 [As Published]

of 5

Page text shows just the words. Original shows the document exactly as it was published.

                 Issue
                 The proposed car parking is not consistent with the car parking rate for a carwash under The
                 Noosa Plan 2020 and in part relies on street car parking. A more accessible parking space
                 should also be provided for the proposed dog wash bays.
                 Information Required
                 7.      Provide amended plans providing additional on site car parking to meet the Driveways
                         and Parking code minimum rate, having regard to accessibility for users.


                 Issue
                 Council has a number of queries with regard to the preliminary stormwater design plans
                 including:
                    i.Is the design engineer a Registered Professional Engineer of Queensland?
                   ii.Does the design include consideration for climate change?
                  iii.The rainfall intensities do not appear to be site specific (Cooroy locality)?
                  iv. The proposal includes a proprietary device to treat stormwater runoff. Council’s
                      preference is for natural processes?
                  v. The design includes a connection to Council’s system in Opal Street but no detail on the
                      structure has been indicated?
                  vi. The design does not include any levels and does not demonstrate that the system will
                      function or demonstrate that it will not conflict with other buried services in the road
                      reserve?
                 Information Required
                 8.      Provide additional comment and/or plan amendments to address the following:
                         8.1. Is the design engineer a Registered Professional Engineer of Queensland?
                         8.2. Provide additional comment and/or amended plans regarding the design
                              consideration for climate change. The additional detail must demonstrate that the
                              design achieves compliance with The Noosa Plan 2020 – Water Quality and
                              Drainage Code – PO2 and AO2.4 (20% increase in rainfall)
                         8.3. Provide amended calculations that utilise rainfall data for the subject site area
                              (Cooroy Locality)
                         8.4. Provide additional detail/comment to demonstrate that the design achieves
                              compliance with The Noosa Plan 2020 – Water Quality and Drainage Code – PO7
                              and AO7.1
                         8.5. Indicate on the design the structure proposed to be constructed to connect to
                              Council’s system in Opal Street
                         8.6. Provide amended plans that includes additional detail (levels etc) that is sufficient
                              to demonstrate that the system will function and will not conflict with other buried
                              services in the road reserve




                                                                                                           Page 4 of 5
Document Set ID: 22219649
Version: 4, Version Date: 22/12/2022
Log in to download the original file

Information Request MCU22 0201 [As Published].pdf · 251 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.