Original source · versioned page text
Appendix 8 - Waste management plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnWaste Management Plan for BP Service Station Redevelopment Prepared in response to the Noosa Plan, Part 14, Division 19 Project: Redevelopment of an existing BP Service Station site Site address: Lot 1 on RP 131598 and Lot 21 on RP 72829 (Cnr Weyba Road and Mary Street, Noosaville) Name of applicant: Wessel Petroleum Pty Ltd Address of applicant: PO Box 6074 Bundaberg East QLD 4670 Phone: 0407 139 222 Email: [email protected] Describe buildings and other structures currently on the site: Existing BP service station on Lot 1 and a separate commercial tenancy on Lot 21 with associated outbuildings and infrastructure. Describe proposed use/development: The proposed use is amalgamation of the two lots, redevelopment of the existing BP service station and deletion of the existing commercial tenancy. SPACE Number of units: 1 commercial premises (BP service station) Estimated waste generation: 720L/week (known from current site operation) Estimated recycling generation: 1500L/week (known from current site operation) Describe equipment and system to be used for managing waste: A 240L waste storage bin is currently provided onsite and will be retained for the redevelopment. The waste storage bin is emptied three times per week by the council garbage collection service on Monday, Wednesday and Friday. The waste bins will be emptied by a waste collection vehicle (WCV) internally on the site, as shown on the swept path plans prepared by Empire Engineering. Describe equipment and system to be used for managing recyclables: A 3000L recyclables storage bin is currently provided onsite and will be retained for the redevelopment. The recyclables storage bin is emptied fortnightly by JJ Richards collection service. The recycle bin will be emptied by a WCV internally on the site, as shown on the swept path plans prepared by Empire Engineering. Describe equipment and system to be used for managing garden organics (if applicable): Any garden waste will be gathered by a landscaping contractor and directly deposited at a green-waste facility. Space allocated (highlight on plan drawings): A 240L waste bin and a 3000L recycle bin is required for the development. A bulk bin storage area and refuse loading zone for waste collection vehicles is shown on the site plans. ACCESS Describe arrangements for access by customers to waste facilities (highlight on plan drawings): Collection bins for customer use will be located at each fuel bowser, as well as additional bins located at the entrance to the service station shop and internally within the shop. Bins for staff use will be located within the staff areas such as offices and staff rooms etc. Describe arrangements for access by collection contractors to waste facilities (highlight on plan drawings): Refer to the site plans and WCV swept path plans forming part of this application. Is minimum height met for service vehicles to access waste area? Yes – bulk bin storage area is not roofed and WCV can fit under fuel roof canopy.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.