Council archive · source document
Decision Notice - 010.2007.00001670.001 [As Published] · 142007.1670
NOOSA COUNCIL IDAS Development Application Decision Notice 3 of 10
Noosa Council Conditions
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
Landscaping
1. The site is to be landscaped in accordance with Council’s Policy on Landscaping Guidelines and the
approved plan of Development. The approved plan is titled Landscape Plan, prepared by Environmental
Landscape Planning and dated October 2007 and as may be amended by these conditions.
2. All manholes, inspection pits and grates are to be raised to finish surface level and kept free of cover and
be visible at all times to ensure prompt access in case of emergency.
3. The landscape construction is to be implemented in accordance with the landscape plan, planting
schedule and horticultural industry best practices.
4. All plant species located in group plantings shall not be subjected to any hedging maintenance regimes.
5. All trees 45 litre and greater must be securely tied and staked to assist their growth during the
establishment period.
6. The density of planting must achieve the set out requirements as detailed on the approved landscape
plan.
7. Prior to commencement of any works on site, all existing trees located in the road reserve and detailed for
retention on the approved landscape plan shall be preserved and protected. The tree protection material
is to consist of hazard barricade fencing and shall remain in place until all building construction works on
site have been completed
8. The applicant must ensure that all landscaping treatment does not unduly restrict/prevent access to
service meters within the site.
9. All trees must be located:
9.1. a minimum of 1.0 metres from all services to prevent root/service conflict and to provide future
ease of maintenance requirements
9.2. a minimum of 2.0 metres from stormwater catchpits
9.3. a minimum of 4.0 metres from all overhead street lighting
10. This Development Permit lapses if the development has not happened by 29 November 2009, unless
application to extend the currency is approved by Council.
Frontage Works, Access, Car Parking, Stormwater Disposal, Sediment & Erosion Controls and Filling of
the Site.
10. The development shall be carried out in accordance with Engineering drawings Nos.
Driveway Details dated 20 October 2007 by Paul Clout Design
C1 dated 26 April 2007 by Paul Clout Design
16017-OW1A dated 22 October 2007 by SCG Consulting Engineers
or as modified herein.
11. Roof and surface runoff connection to Council’s kerb and channel and infiltration pits shall be as shown
on drawing No. 16017-OW1A. Kerb adaptors shall be used in the kerb.
MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@9801a144\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2007.00001670.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 40 KB (small file)
- File type
No other editions are linked here.