                                              Terms and Conditions of Quotation and Sale

1.    PAYMENT                                                                           council/town planning (relaxation) approvals are required by the
(a)   The Owner shall pay a deposit at the time of placing this Order.                  Local Council.
(b)   A Works Contract setting out progress payments is required to be            (f)   The owner is responsible for supplying a plan of the site with the
      signed prior to Construction.                                                     position of the proposed structure and all service amenities,
(c)   Construction will not commence until all progress payments as stated              easements and boundary lines clearly indicated. The Owner is
      have been made.                                                                   responsible to ensure that all boundary lines or easements are clearly
(d)   Payment for “kit only” purchase (i.e. without installation) must be               marked at the site location. The Contractor and/or its subcontractors
      made in full prior to manufacture.                                                will not be held responsible for the incorrect location of the structure
(e)   Account customers as per normal trading terms.                                    if boundary lines have not been correctly marked or for damage to
2.    DELIVERY                                                                          any service which has not been shown on the site plan.
(a)   The Owner will at his own expense provide or cause to be provided           (g)   The Owner warrants that he/she is entitled to build upon the site and
      full and clear access to the delivery site. It is the driver’s discretion         that if in the event that he/she shall not be the sole owner of the site,
      as to whether or not to enter the delivery site. If the site is not               he/she has complete absolute authority to act on behalf of all the
      accessible and delivery needs to be rescheduled then the Owner will               owner/s thereof. The Owner agrees to give the Contractor and/or its
      be liable for any additional delivery costs.                                      subcontractor’s full access to the site for the full period of the
(b)   Unless the Owner has notified the Contractor, the materials will be               contract.
      delivered and unloaded in the location considered appropriate to            (h)   The Contractor and/or its subcontractors will ensure downpipes are
      effectively fill the order. Any additional cost incurred by the carrier           taken to the bottom of the wall sheeting/columns only. The Owner is
      manhandling materials due to the Owners specific location                         responsible for discharge of roof water to Council requirements and
      requirements or if any additional mechanic assistance is required to              obtaining the Final Building Approval Certificate from the relevant
      unload the materials (eg crane etc) shall be paid for by the Owner.               Council.
(c)   The Owner is responsible for checking that all materials have been          (i)   The Contractor and/or its subcontractors reserve the right to touch up
      received and in good order, and the Owner will be deemed to have                  small scratches and dents.
      accepted the materials unless a claim of short supply, faulty or            (j)   The Owner is responsible for removing all excess waste materials
      incorrect materials is made in writing by the Owner within 7 days                 from the site.
      from pick up or delivery.                                                   5.    GENERAL
(d)   The Owner is responsible for any damage or loss of the materials            (a)   This Owner acknowledges that this structure has not been not
      once delivered to site.                                                           designed for occupation or as a place of residence.
3.    OWNERSHIP OF MATERIALS                                                      (b)   It is the Owners responsibility to check with appropriate authorities
(a)   Ownership of the materials does not pass to the Owner until all                   regarding the wind region, terrain category, topography and shielding
      amounts due and owing are paid in full to the Contractor.                         factors for the specific site conditions. The structure quoted has been
(b)   Unless payment for the materials is made to the Contractor by due                 designed to the wind category stated in the Quotation.
      date, the Contractor or its agents or employees, may at any time enter      (c)   Dimensions stated on plans are nominal only. Minor variations in
      onto the site where the materials are stored and remove the materials.            measurements from those shown shall not give rise to any claim for
(c)   The Owner must indemnify the Contractor in respect of any claims,                 damages or breach of Agreement
      losses, costs or damages that the Contractor may incur as a result of       (d)   The Owner warrants that he has carried out his own inquiries and
      the Contractor taking action under Clause 3(b).                                   investigations as to adequacy or suitability of the structure for the
(d)   Until the Owner has paid for the materials, the Owner must not use,               purpose for which the Owner intends to use the structure and the
      sell, lease, dispose, assign or encumber the materials (by mortgage,              Owner has not relied on the Contractor or the Contractor’s
      lien, charge or otherwise) without the consent of the Contractor and              employees, agents or distributors in determining the adequacy or
      the Owner must store the materials separately in a readily identifiable           suitability of the structure for the Owner’s purposes.
      state.                                                                      (e)   All dates given are estimates only. While every endeavour will be
4.    ERECTION                                                                          made, no guarantee will be given by the Contractor to deliver
(a)   Unless otherwise noted, the Quotation has been prepared SITE                      materials or complete contract on the date/s nominated. No
      UNSEEN from the information supplied by the Owner.                                responsibility will be accepted by the Contractor for any costs or
(b)   It is the Owners responsibility to provide power and water to the site.           consequential expenses to the owner arising in delays in respect to
      If power to site is not available then the Owner authorises the                   supply and/or erection of goods sold.
      Contractor to utilise a generator and the Owner agrees to a variation       (f)   All materials supplied will be of similar quality and quantity as those
      to the Contract in relation to the additional cost incurred by the                used in the Contractor’s display centres. However, the Contractor
      Contractor.                                                                       reserves the right to alter designs, plans and specifications at any time
(c)   The Owner must provide a clear and accessible site for the structure,             without notice.
      clear of vegetation or obstructions and including a minimum of 1.5m         (g)   This quotation is subject to managements final discretion and it could
      level clear space around the perimeter of the proposed structure for              be amended to reflect any price rises or falls, errors or emissions..
      ladders and or scaffolding. The cost of any site works are not              6.    COOLING OFF PERIOD
      included whatsoever, nor does it include the removal of building            (a)   The Owner may withdraw from the Contract with five (5) business
      waste from site. These costs are the sole responsibility of the Owner.            days after receiving a signed copy of the Contract. The Owner must
(d)   The concrete slab price is based on a level site which is rock and                give written notice to the Contractor.
      vegetation free with access and therefore does NOT include fill,            (b)   The cancellation of, or any variance to this order must be made in
      pump hire or any unforseen expenses which may arise. The slab price               writing and accepted by the Contractor in order to be binding upon
      is based on M soil conditions as per our standard engineering designs             the parties hereto. As the materials for each structure are made as
      and does not allow for unstable or reactive soil conditions. It is the            required, any orders cancelled after ordering of materials will not be
      Owners responsibility to provide any soil tests if required and pay               refunded and/or any moneys outstanding will become immediately
      any additional charges incurred in relation to the Slab.                          due and payable. If the Owner withdraws from the Contract under
(e)   If standard Council/Certifier fees are included in the Quotation, the             this Clause, the Contractor must return the deposit to the Owner less
      Contractor will act on behalf of the Owner and apply for and pay for              $100 and any out of pocket expenses incurred by the Contractor to
      the fees for the building approval required in relation to the structure.         the date the Contractor received the Owners notice. If the Owner has
      The Owner will be responsible for any additional costs should the                 not paid the Deposit, the amount of $100 plus any out of pocket
      Local Council require any changes to the building or if additional                expenses incurred by the Contractor is deemed to be a debt payable
                                                                                        from the Owner to the Contractor.

      I hereby confirm the details contained in Quotation No. …………………..………. dated ………….…….……………
                            and agree to the above Terms and Conditions of Quotation and Sale.

Owners Name ………………………….……….. Signature ………………….…………………………Date …..……..……

Owners Name ………………………….……… Signature ………………..…….…………………… Date ..….………….
Log in to download the original file

Michelle Huntley-Walker 4x12.pdf · 195 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.