#102 Line test report OBoats Noosaville
Attached to the e-mail MCU22/0048 & OPW22/0089 - Representations.
3rd Party Certified Testing of service lines: Test Results O Boats Noosaville
Service Line Test Results:
#1 ULP supply Line Test Results: PASS
Date Time Time finish Test time Test pressure Test pressure Result
start KPA Start KPA Finish
14/12/21 12.30 hrs 12.45 hrs 15 minutes 100 100 PASS
#2 Line Test Results:
#3 Line Test Results:
#4 Line Test Results:
#5 Line Test Results:
#6 Line Test Results:
#7 Line Test Results:
#8 Line Test Results:
#9 Line Test Results:
DGC technician reports:
#1 ULP line PASSED the line test criteria. Hydrostatic pressure test.
Observations:
The double wall UPP supply line was isolated at the tank turret and the 2 tri-flexers under each pump
(dual bowser). Then a hydrostatic pressure was conducted to 100kpa.
The line held target test pressure for 15 minutes and proved tight.
On conclusion of the test, the triflexers were reinstated with 2 new gaskets.
Other maintenance works;
Technician removed and checked the VR float valve for operation. All good.
Recommendations:
Maintain annual tank/ line integrity test maintenance schedule for indications of future
degradation.
Non‐compliance items shall be upgraded in accordance with current legislation & Standards:
• Work Health and Safety Act 2011 & Work Health and Safety Regulation 2011
• AS 1940-2017: The storage and handling of flammable and combustible liquids
• AS 4897-2008: The design, installation and operation of underground petroleum
storage systems.
Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.