Skip to the record
Search everything, all in one place.

Original source · versioned page text

Minor Change Request - 101558

of 9

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                               Green                                       02.06.26
DA-02                  6       Elevations 1, drawn by Eco Cottages         13 February
2026-27 – 02           A       Elevations, drawn by Building Suncoast      2018
                               Green                                       02.06.26
DA-03                  6       Elevations 2, drawn by Eco Cottages         13 February
2026-27 – 03           A       3D Views, drawn by Building Suncoast        2018
                               Green                                       02.06.26
DA-04                  6       Sections, drawn by Eco Cottages             13 February
                                                                           2018
BA-01                  2       Site Plan, drawn by Eco Cottages            21 February
                                                                           2023
FE-02                  -       Eco Cottage Factory Extension – Glulam      29 Nov 2022
                               Beam Shop/Storage Shed Elevations, drawn
                               by Eco Cottages
FE-04                  -       Eco Cottage Factory Extension Glulam        29 Nov 2022
                               Beam Shop/Storage Shed Section A, drawn
                               by Eco Cottages
FE-05                  -       Eco Cottage Factory Extension Drying Shed   29 Nov 2022
                               Overview, Plan and Elevations, drawn by
                               Eco Cottages
BA-01                  B       Site Plan – Landscape Added, drawn by Eco   19 June
                               Cottages (as annotated by Council)          2023



Condition 16. A minimum of 30 15 car spaces, including 1 disabled space must be
provided on site, in accordance with the approved plans.



Condition 28. Development undertaken in accordance with this approval must be generally
comply with the approved plans of development. The approved plans are listed in the
following table unless otherwise amended by these conditions

Plan No.               Rev.    Plan Name                                   Date
27281-OW5              B       Operational Works: Driveway & Access,       13.08.2018
                       C       prepared by SCG Consulting Engineers        June 26
27281-SW1              C       Operational Works Stormwater                22.02.2018
                       D       Management, prepared by SCG Consulting      June 26
                               Engineers

Comment:

We advise Council that SCG is close to finalising the updated engineering plans and we
expect to have this submitted to Council within the next 5-10 business days.




                                           6

[email protected]                  Murray & Associates (QLD) Pty Ltd                         June 26
Log in to download the original file

Minor Change Request - 101558.pdf · 392 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.