Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

7 avocet pde · OPW19/0077

Attached to the e-mail Operational Works Application OPW 19/0077 - DA Form 1 - Plans - 7 Avocet Pde, Peregian Beach.

of 44

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                                                              Department of Housing and Public Works

                                                              Form 15 Compliance certificate
                                                              for building design or
                                                              specification          Version 4 July 2017


NOTE: This is to be used for the purposes of section 10 of the Building Act 1975 and/or section 46 of the
Building Regulation 2006.
RESTRICTION: A building certifier (class B) can only give a compliance certificate about whether building work
complies with the BCA or a provision of the Queensland Development Code (QDC). A building certifier (Class B)
can not give a certificate regarding QDC boundary clearance and site cover provisions.
1. Property description                   Street address (include no., street, suburb/locality and postcode)
This section need only be
completed if details of street
address and property description                                                                          Postcode:
are applicable.
E.g. in the case of                       Lot and plan details (attach list if necessary)
(standard/generic) pool design/shell
manufacture and/or patio and
carport systems this section may          In which local government area is the land situated?
not be applicable.
The description must identify all
land the subject of the application.
The lot and plan details (e.g.
SP/RP) are shown on title
documents or a rates notice.
If the plan is not registered by title,
provide previous lot and plan
details.
2. Description of
   component/s certified
Clearly describe the extent of work
covered by this certificate, e.g. all
structural aspects of the steel roof
beams.




3. Basis of certification
Detail the basis for giving the
certificate and the extent to which
tests, specifications, rules,
standards, codes of practice and other
publications, were relied upon.




4. Reference documentation
Clearly identify any relevant
documentation, e.g. numbered
structural engineering plans.




LOCAL GOVERNMENT USE ONLY
 Date received                                                        Reference Number/s

Used in these records

About this file

File size
16.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

7 avocet pde.pdf · 16.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.