Attached to the e-mail Operational Works Application OPW 19/0077 - DA Form 1 - Plans - 7 Avocet Pde, Peregian Beach.

of 44

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.

5.   SITE CLASSIFICATION AND TARGET STRATA

     Based on the findings of the site investigation and the footing system design proposed on
     the client supplied information, the classification of the site is considered to conform to: -

                                       CLASS " P "
         This classification is due to poor bearing capacity of the existing soil.
          However, if this was not the case the soil type and reactivity would
                        be comparable to that of a CLASS " S ".

     in accordance with Australian Standard 2870-2011, 'Residential Slabs and Footings,
     Construction'.

     The target stratum where 100kpa of allowable bearing capacity is attained by the medium
     dense SAND which occurs at a depth of 1100mm from the existing ground level at
     location BH1 and at a depth of 1400mm at location BH2. Any fill placed over the
     existing ground shall be piered through the fill into the existing material. Further note that



6.   FOOTING SYSTEM DESIGN

     The footing system shall be designed to conform to the performance limits stated in AS
     2870 2011 and reprinted in the C.S.I.R.O.'s Publication 10/91, 'Guide to Home Owners
     on Foundation Maintenance and Footing Performance', a copy of which attached to this
     report. It should be noted that footings designed in accordance with AS2870-2011 does
     not guarantee no movement of footings, shrinkage cracking or other damage to the
     building.

     Foundation preparation and footing construction shall be in accordance AS 2870 -2011
     and AS 3798-1990 'Guidelines on Earthworks for Commercial and Residential
     Developments'.

     Where necessary, subsoil drainage shall be incorporated in the construction of the building
     to ensure that subsurface water is properly drained away from the footings.

     Potential seepage or subsoil drainage problems cannot always be recognised from the
     results of a site investigation. Problems with respect to subsurface water flow or seepage
     may not be evident until after the site has been subject to the first significant wet period.

     After construction of the footing system the ground surface around the residence shall be
     sloped away from the footings at a fall of 1 in 20 minimum for a distance of 2000 mm.


7.   ARTICULATION

     It is recommended that masonry walls on Class M, H, E and P sites be articulated at all or
     some openings. Articulation joints shall be constructed in accordance with the Cement and
     Concrete Association's Publication 'TN61 - Articulated Walling'.

Used in these records

About this file

File size
16.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

7 avocet pde.pdf · 16.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.