7 avocet pde · OPW19/0077
Attached to the e-mail Operational Works Application OPW 19/0077 - DA Form 1 - Plans - 7 Avocet Pde, Peregian Beach.
Very large file (16.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.
LINDSAY CONSULTING PTY
LTD
[OCR of page images]
FOUNDATION & STRUCTURAL PLANS
Permit No. 8140
DEVELOPMENT PERMIT FOR BUILDING WORKS
APPROVED WITH CONDITIONS
Date 11 FEB 2019
his is an approved document.
Notice for details and conditions appying to th
ISSUED BY URBAN CERTIFIERS PTY LTD
SITE CLASSIFICATION - P
PATIO,POOL & BLOCK WALL
EXISTING SITE CONDITIONS Y|N
TREES PRESENT ee
FILL PRESENT id
SITE CONTOURS PROVIDED oe
AS-CONST SERVICES PROVIDED oe
SOIL CLASSIFICATION AS PER LINDSAY CONSULTING P/L
REPORT 181811.
FOUNDATION REQUIREMENTS FOR MODERATELY, HIGHLY & EXTREMELY REACTIVE SITES.
For stiffened rafts, waffle rafts and strip footings on moderately, highly and extremely reactive sites, the following requirements
apply to the building services and footing system in addition to requirements of clause 6.4 & 65:
A. Penetrations of the edge beam and footing by drain pipes shall be sleeved using closed cell polyethylene lagging or similar.
B. During construction, water run-off shall be collected and chanelled away from the building.
C. Excavations near the edge of the footing system shall e backfilled in such a way as to prevent access of water to the
foundations as described in clause 5.6.3b.
Notes.
1, For example, excavations should be backfilled above or adjacent to the footing with moist clay compacted by hand rodding
or tamping.
2. Porous material such as sand, gravel or building rubble should not be used
D. Water shall not be allowed to pond in the trenches.
E. Concrete in beams shall be mechanically vibrated.
AS2870-2011 Appendix B2.3
(A) Drainage o the site: The site should be graded or drained so that water cannot pond against or near the building. The ground
immediately adjacent to the building should be graded to a uniform Fall of S0mm min away from building over the first metre, The
sub-floor space for buildings with suspended floors should be graded or drained to prevent ponding where this may affect the
performance of the footing system. The site drainage recommendations should be maintained for the economic life of the building.
(B} Limitations on gardens: The development of the gardens should not interfere with the drainage requirements or the sub floor
ventilation and weephole drainage systems. Garden beds adjacent to the building should be avoided. Care should be taken to avoid
overwatering of gardens close to the buildings footings.
(C) Restrictions on trees and shrubs: Planting of trees should be avoided bear the foundation of the building or neighbouring building
on reactive sites as the can cause damage due to the drying of the clay at substantial distances. To reduce, but not eliminate, the
the possibility of damage, tree planting should be restricted to a distance from the house as follows.
(i) 1 and a half times the mature height for class E sites.
(ii) 1 times the mature height for class H1 and H2 sites.
(ii) 0.75 times the mature height for class M sites.
Where rows or groups of trees are involved, the distance from the building should be increased. Removal of trees from the site can
also cause similar problems. Alternatively, root barrier shall be installed as per manufacturers specifications.
BUILDERS NOTES
1
These drawings shall be read in conjunction with the architectural & any other consultant drawings.
Any variations/descrepancies shall be referred immediately to the engineer.
The builder shall verify all set-out dimensions and levels prior to construction.
The builder shall be responsible for the maintainance of safe working conditions.
All workmanship and materials shall be in accordance with the relevant standards and the BLA.
Subterranean termite protection shall be in accodance with AS3660-Part and the BCA.
Nonstructural items such as damp proof coursing, flashing and weep holes are not shown for clarity.
Refer to the architectural details as required.
CONSTRUCTION NOTES
1. All workmanship and materials shall be in accordance with the requirements of the relevant current
Australian Standard Codes, Building By-Laws and the ordinances of the relevant Local Authority.
= Minimum 20 MPa at 28 days
~ 20 nominal maximum aggregate size
= 100 maximum slump +/-10mm
2. il Concrete Class
Slab on ground
ii) Concrete Class
Suspended slab
Minimum 32 MPa at 26 days for internal slabs
Minimum 40 MPa at 28 days for external slabs
= 20 nominal maximum aggregate size
= 100 maximum slump +/-10mm
3. Minimum Cover
fo Reinforcement
25 to upper face of internal slabs -0 +5mm
45 for external exposure
30 fo a membrane in contact with the ground
40 to unprotected ground
4. Minimum Laps and Splices for Reinforcement
{a} Slab Fabric ~ 225 nininum overlap of transverse bars at all edges
{b} Trench Mesh 500 splices in all footing beams
Laps at intersections as per the Design Drawings
500 splices in all footing beams
Provide “L” bars at all beam intersections with 500 laps to each leg
{c)_ Reinforcing Bars
5. Fireplaces shall be supported on slab thickening extending 300 past the edges of the masonry, and
reinforced with SL72 mesh top and bottom. Slab thickening shall be 150 thick for single storey construction
and 200 thick for two storey construction
Shrinkage Control
6. Reinforcing mesh shall be no less than SL82 for slabs over 18m no steps) in length.
7. Where the floor slab is to be tiled, the following recommendations are made, in order to
minimise the effect of shrinkage:
~ SL92 slab mesh (or equivalent) should be provided
~ Placement of files should be delayed for as long as possible (preferably for at least 3 months}
EARTHWORKS NOTES:
Where any filling is carried out on the site after the completion of the site investigation, the
following recommendation shall be followed:-
8. The site shall be stripped of all vegetation prior to the placement of any filling material
9. Compaction Standards for filling Material
A. Controlled Filling
(a) Sand filling up to 600 deep, placed in maxinum 300 thick layers and compacted with a vibrating
roller to achieve a minimum Dynamic Cone Penetrameter reading of 7 blows per 300 penetration
Irefer AS 1289.F3.3). Sand fill may be flooded if necessary to achieve this compaction standard,
provided the water can subsequently be drained from the site.
(b)Non-sand filling up to 400 deep, placed in maximum 150 thick layers and compacted with
mechanical roller. Clay fill shall be moist during compaction.
(a1 Controlled filling shall continue for at least 1 metre past the edge of the footing beam and shall
be battered back to the original surface with a slope of no more than 12 (Vert : Horl.
(d) Where the depth of filling material exceeds that specified above, the filling material shall be
compacted as follows:
Sand fill to 65% Density Index in accordance with AS1289.E6.1
Non-sand fill fo 95% Maximum Dry Density (Standard Compaction) in accordance with 5.4.1
Compaction tests shall be carried out on each layer as the filling is placed. If the compaction standard
specified is not achieved, then @ “Pier and Slab" and “Pier and Beam” footing design shall be adopted with
all piers founded on the underlying natural material.
B. Rolled Filling
(a) Sand Filling up to 600 deep, placed in maximum 300 thick layers and conpacted by repeated
rolling with an excavator.
(b) Non-sand filing up to 300 deep, placed in maximum 150 thick layers and compacted by repeated
rolling with an excavator.
{1 Where the depth of filling material exceeds that specified above, the filling material shall be
compacted as fallows:-
Sand fill to 65% Density Index in accordance with AS1289.66.1
Non-sand fill to 95% Maximum Dry Density (Standard Compaction) in accordance with 5.4.1
Compaction tests shall be carried out on each layer as the filling is placed. IF the compaction standard
spetified is not achieved, then a “Pier and Slab" and “Pier and Beam” footing design shall be adopted with
all piers founded on the natural underlying material.
LINDSAY CONSULTING £7;
THIS DRAWING REMAINS/THE PROPERTY OF
LINDSAY CONSULTING PTY LTD AND IS FOR
THE SOLE USE OF THE CLIENT. NO PART
MAY BE USED IN PART OR WHOLE WITHOUT
PRIOR EXPRESS WRITTEN CONSENT OF
LINDSAY CONSULTING PTY LTD
CLIENT AND PROJECT DESCRIPTION
MIKE BOLTON
PROPOSED PATIO & POOL
NO.7 AVOCET PARADE
PEREGIAN BEACH
DRAWING TITLE
COVER PAGE
SCALES
SURVEY DATUM
ASSOCIATED CONSULTANTS
REVESION LST
‘A [ORFGNAL ISSUE BAT
snFO.DWG
aS HORE SHEET RE,
18-1811-F1 TIA
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
7 avocet pde.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.