Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

7 avocet pde · OPW19/0077

Attached to the e-mail Operational Works Application OPW 19/0077 - DA Form 1 - Plans - 7 Avocet Pde, Peregian Beach.

of 44

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.

LINDSAY CONSULTING PTY
                   LTD


[OCR of page images]
 

 

 

 

N16 bar in top course only — 4 LINDSAY CONSULTING

 

    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BACKFILL AND DRAINAGE
Be Gtructursl £ Civil Engineers)
1. Backfill should not be placed behind the wall until at least
ten days after grouting. THS DRAWING REMAINS/THE PROPERTY OF
2. Backfill should be placed and compacted in layers not more than LINDSAY CONSULTING PTY LTD AND IS FOR
200mm deep. The degree and method of compaction depends on MAG BE USED IN PART OR WHOLE WITHOUT
the proposed use of the backfill area PRIOR EXPRESS WRITTEN CONSENT DF
LINDSAY CONSULTING PTY LTD
3. The drainage system should be installed progressively as the
backfill rises CLIENT AND PROJECT DESCRIPTION
> 4. The drainage system behind the wall should be connected to the MIKE BOLTON
z
z ~ He Ni6 bars at 600 centres main drainage system. PROPOSED PATIO & POOL
ey = 5. When using soil backfill, it is advisable to seal off the top NO.7 AVOCET PARADE
ae 3 surface of the backfill with a semi-impermeable layer of soil PEREGIAN BEACH
gs ~ or earth. Compact and grade to a gutter to provide surface
Sa drainage.
ES
GZ DRAWING TITLE
ro
Zo FOUNDATION DETAILS
2 x
&3S =
nao €
az —
as s
as 3 SCALES
as 2.5 kPa Surcharge
25 eee ee ele eee
oo zs
2
= on
28 Longitudinal reinforcement
52 2/N12 at 400 except on top of
Zo . 7, cleanout blocks
HS 2 SURVEY DATUM
25 = + ee} — Granular backfill
= ht 2-N16 at 400 CRS with 55 cover
Lap bars MIN 600 ASSOCIATED CONSULTANTS
:
Pier - clean-ouf block + +100 Agg. drain with Granular backfill
\ Concrete
55 cover
55 cover lL i yet 25 MPa
h 250
= . . a
& S
~ N16 @ $00 CRS Each
et | N16 oF 300 each Woy Wo ath 55 over
300 N16 at 300
1200mm Min
| |_— Mass conerete piers @ 2m ors SE SSO
NATURAL STIFF_SAND_
e Refer Geo Report
=
s
38
DEVELOPMENT PERMIT FOR BUILDING WORKS
350 dio APPROVED WITH CONDITIONS
Permit No. 8140 Date 11 FEB 2019
This is an approved

 

 

 

  

 

 

FD.DWG

 

 

 

RETAINING WALL WITH BLOCKWALL DETAIL - ST2 A

NOT TO SCALE

 

ae WER EET] Re

18-1811-F6 6/A

 

 

 

 

 

 

 

 

 

 

Used in these records

About this file

File size
16.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

7 avocet pde.pdf · 16.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.