Council archive · source document
08/1927 - Report for Detached House at 20 Grosvenor Terrace, Noosa Heads [As Published] · 132008.1927
7
12. All manholes, inspection pits and grates are to be raised to finished surface levels and kept
free of cover and be visible at all times to ensure prompt access in case of emergency.
Relevant Period
The Development Permit for a material change of use lapses if the use has not happened by 5
March 2013, unless an application to extend the currency is approved by the Iconic Panel.
Land Development
13. A vehicular access driveway to serve the site shall be constructed from the Grosvenor
Terrace frontage of the site generally in accordance with Site Plan KSY Sheet 1 and 13 by
Ausmar Homes dated 15 January 2009 except as modified herein.
14. The driveway shall be designed and constructed to Council’s design standards and to grades
that prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians
movements along the footpath without any step or level difference. Should any driveways be
constructed to grades that do not comply with AS/NZS 2890.1-2004 Council will require that
the driveway be removed and reconstructed to levels that do comply.
Please note, a step between the driveway and the surrounding area shall be avoided, as it is
preferred to have the footpath continue at a constant grade to minimise the potential for
pedestrians to trip or fall.
15. To ensure pedestrian safety between vehicles exiting the site and pedestrians on the
property frontage, the driveway and any associated fencing or vegetation near the driveway
shall comply with the minimum sight line requirements as defined in AS 2890.1, section
3.2.4. The applicant shall demonstrate compliance by illustrating these sight lines on the
plans submitted for Building Works approval.
16. A Road/Footpath Permit shall be completed and submitted for the construction of the access
driveway in accordance with Council’s Local Law No.8. If approval is given the driveway shall
be constructed in accordance with Council’s standard drawings, which will be provided at
time of approval.
Roof Water & Stormwater Drainage
17. Prior to issue of Building Approval, the sites Rapid Infiltration Pit (RIP) must be demolished
and a new RIP constructed in strict accordance with the specifications detailed on the
information request response letter to Suncoast Building Approval from Steve Harrison of
TATE Professional Engineers Pty Ltd dated 19th January 2009.
An RPEQ must provide a signed letter to Council prior to issue of Building Works Approval to
certify that the RIP has been constructed in accordance with the response letter to Suncoast
Building Approval from Steve Harrison of TATE Professional Engineers Pty Ltd dated 19th
January 2009.
18. Roof runoff from any new dwelling shall be directed to a rainwater storage system or tank
that is installed to ensure water from the rainwater storage system or tank is used for
external uses (such as watering gardens, irrigation, ornamental ponds, water features,
topping-up swimming pools, outdoor cleaning, etc) and for internal (ground floor) use in
washing machine cold taps and toilet cisterns. All rainwater tanks are to be designed and
installed in accordance with the Queensland Development Code (QDC) current at the time of
building approval, and shall be part of the plumbing application for approval. The location
and capacity of the tanks shall be clearly shown on the plans submitted for Building Works
approval and any overflow shall be directed to Rapid Infiltration Pit located within the site.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1927 - Report for Detached House at 20 Grosvenor Terrace, Noosa Heads [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.