Sunshine Coast Checklist - Applications Involving Planning
egional Council Assessment and Operational Works Assessment

 

 

RECEIPT OF IDAS APPLICATIONS AT. TEWANTIN OFFICE

This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter to determine if properly made. (This may not always be possible and can be further checked)

 

dd. APPLICATION FORMS. : . : al
1.1. Form 1 required for all application & Forms 2-32

 

1.1.1 Ensure that the relevant forms are fully completed (mandatory), are current versions and include

 

payment of appropriate fee. (Do not receipt at this stage)

 

 

 

1.1.2 In the case of an MCU or Op Works below the high-water mark, owner's consent is required. /

 

1.1.2.4 If there are multiple owners, the consent of each owner is required.

1.1.2.2 _ If the owner of the land is a company, either ACN No, Company name (clearly indicated by
signatory) or Company Seal required.

IDAS ASSESSMENT CHECKLIST, ar ea
2.4 Ensure that relevant checklist/s have been completed with regard to referral ee ee ee — WF —
+i =— —=— (if applicable-notmandatory) ~~

2.2 Ensure correct IDAS.Forms are provided where required for referral (ie most common are Form 11 for
Assessable Vegetation, Form 24 for Contaminated tand and Form 28 for Prescribed Tidal Works)

(3, ENVIRONMENTALLY RELEVANT ACTIVITIES i . q so tintin al
3.1. Ensure that Part G is completed if EPA referral is required.

 

 

 

 

 

 

 

 

3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application. (Refer Healthly Places for fees)

FORM 2- REQUEST TO.CHANGE APPROVAL ~

4.1 Ensure that relevant items have been checked and/or completed including information regarding
* _ appticant details along with owners consent if not current owner of land as shown on Council records.

If over multiple properties on one or more sites, consent of Body Corporate is required.

i5._PLANS eae ee eee " ey
5.1. Ensure that generally at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational iy

t

vv

 

 

   

 

 

 

 

 

 

Works) accompany the application. In addition ensure that each set is complete.

5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is
unbound. :

 

 

 

 

 

 

SUPPORTING INFORMATION®. Fee i
6.1 Ensure. that generally at least 6 copies of any report accompanies the application (5 for Reconfiguration 4
T

 

 

and Operational Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction.

6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. |
6.3 Additionally an electronic version is preferred where possible for ease of electronic record keeping ,

(FEE
7.1 Ensure that the application fee, as determined from the Council’s adopted scale of fees,
accompanies the application or has been paid.

 

 

 

 

en ea - ~onnamyemer
oo fe = . .

 

 

 

 

 

 

 

« Planning Assessment MCU applications; Lot reconfiguration; Prescribed Tidal Works; Operational Work if Jetty
* Operational Works Assessment Operational Work not including Jetties
Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.

 

 

 

T g.Manduse\administrative processes\application checklist.doc
Full text of the other 18 pages

Page 2

 
 
 

 

VES He | eakCOMMENT,

 
 

ey oe
Department of Main Roads (Concurrence or Advice)
e State Controlled Road

 

Dept Environmental Resource & Management

Advice
¢ Acid sulphate soils
« Wetlands
« Conservation estate
Concurrence
¢ Clearing of native vegetation on freehold land .
¢ Environmentally Relevant Activity (for non-devolved Council as EPA)
« Contaminated land
« Environmental Management/Contaminated Land Register
= UXO
= Land recently used as a ‘notifiable activity’
« Industrial land changed to sensitive uses (eg school)
¢ Coastal related development.
« Koala habitat

 

Queensland Transport (Concurrence)
° Railway
° Public Passenger Transport

 

Energex or other responsible entity (Advice)
. Electricity Easements/Substations

 

DIP (Concurrence)
. SEQ Regional plan

 

VARIOUS

 

 

 

   

 

pe mi sas pei as 2
Department of Environmental Resource Management

 

 

 

 

 

For further clarification refer to IDAS Guides prepared by Department of Infrastructure & Planning.

Te: Uanduse \administrative processes\application checklist.doc

=

Page 3

LEA
a

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

son eee
Application Details - IDAS form 1
r 13 MAR 2010

(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009) ft §e.

 

You MUST complete ALL questions unless the form indicates otherwisd. incomplete re toh WARE nou all
necessary information and documentation will result in your application not beng

 

For all development applications, you must:
* complete this form (Application details - IDAS form 1)
. complete any other forms relevant to your application

° provide any mandatory supporting information identified on the forms as being required to accompany your
application.

All terms used on this form have the meaning given | in the Sustainable Planning Act 2009 or the Sustainable
Planning Reguiation 2009.

 

Applicant details (note: the applicant is the person responsible for making the application afid need not be the
owner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is
correct. Any development permit or preliminary approval that may be issued as a consequence of this application will

 

 

be.issued to the applicant.)

 

Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another
applicant” button below.

 

 

 

 

 

 

 

 

 

 

 

 

 

Names (individual or company name in full) Pile-It Pty Ltd t/a Noosa Jetty Builders
For companies, contact name Emma Reed

Postal address PO Box 299 Noosaville QLD 4566
Contact phone number 07 5474 3480

Mobile number (non-mandatory) 0408 137 526

Fax number (non-mandatory) 07 5474 3480

e-mail address (non-mandatory) [email protected]

 

 

 

 

 

1. What is the nature of development proposed? (tick all applicable boxes)

 

 

{1 material change of use of premises
[]_ building work
Dd operational work

(1) reconfiguring a lot

 

 

 

 

 

Page 4

CIO

 

 

2. What type of approval is being sought?

 

 

{J development permit
(1 preliminary approval
()_ both - provide details below

 

 

3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?

 

 

XI No

[1 Yes - complete table A and then go to question 5

 

4, Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)

 

 

Table B - street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises

 

 

 

 

Lot on plan
Street Address description
Local government area
Unit | Street Street name and official Post |) ot No,| Plan ype (e.g. Logan,Cairns)
No. | No. suburb/locality name code ‘| and plan no.
1 477 |Shorehaven Drive Noosaville |4586 |710 |sP100034 cunsnine Coast Regional

 

 

 

 

 

 

 

 

{[]Street address / lot on plan

ml Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
water e.g. jetty, pontoon) :

 

Table C - premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g.
channel dredging in Moreton Bay) :

 

 

 

Coordinates (note: place each set of
coordinates in a separate row) Zone Local government
reference Datum area (if applicable)
Easting Northing | Latitude | Longitude PP
e (1) GDA94
1 . ( wese4
(J other

 

 

 

 

 

 

 

 

 

 

5. Total area of the premises on which the development is proposed {indicate hectares or m?)
803m2 :

6. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm, etc.)

 

 

 

 

 

1 |House

 

 

 

 

7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.)

 

Timber Jetty

 

 

 

Application Details - IDAS form 4
Version 1.0 18 December 2009

 

Page 5

mh

@ Table E

OO

 

 

8. Is owner's consent required for this application? (refer to notes at the end of this form for more information)

 

 

CI No

{Xj Yes - complete either table D, table E or table F as applicable

 

Table D (note: do not complete this table if lodging the application on-line using Smart eDA)

 

 

Name of owner/s of the land {SBM Enterprises Pty Ltd ATF MBS Unit Trust

 

\We, the above-mentioned owner/s of the land, consent to the making of this application.

 

 

 

 

Cy
Signature of owner/s of the tand|
. x +
Date IS \a\ ao10

 

 

 

 

Name of owner/s of the land

 

 

(] The owner's written consent is attached or will be provided separately to the assessment manager

 

Table F

 

 

Name of owner/s of the land

 

 

Oo By making this application, |, the applicant, declare that the owner has given written consent to the making of
the application.

 

 

9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry
materials. Refer, to the notes at the end of this form for more @ information)

 

@ No (Yes - complete table G ‘

 

 

10. Identify if any of the following apply to the premises (tick applicable box/es)

 

{J adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H
(] _ on strategic port land under the Transport Infrastructure Act 1994 - complete table '

oO in a tidal water area - complete table J

 

Table H Name of water body, watercourse or aquifer

 

1 j|Noosa Waters Canal

 

 

 

 

11. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow,
water, etc.)

 

 

BXINo_ [[]Yes - ensure the type, location and dimension of each easement is included in the plans submitted

 

Application Details - IDAS form 1
Version 1.0 18 December 2009 -

 

 

Page 6

i

”

?

OOH

 

42. Does the proposal include new building work or operational work on the premises? (including any
services) - . : a

 

LJNo Yes - ensure the nature, location and dimensions of proposed works are included in plans submitted

 

43. Is the payment of a portable long service leave levy applicable to this application? (refer to the notes at the

 

end of this form for more information)

 

(1 No - Go to question 15 0 Yes

 

15. Has the local government agreed to apply a superseded planning scheme to this application under .

 

section 96 of the Sustainable Planning Act 2009?

 

KX No

LJ Yes - provide details below -

 

16. List below all of the forms and supporting information that accompany this application (include all IDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this

 

question does not apply for applications made online using Smart eDA)

 

Method of lodgement to

Description of attachment or title of attachment assessment manager

 

 

 

1 |Form6 over the counter
2 {Checklist over the counter
3. | John Norden Plans over the counter

 

 

 

 

 

17. Applicant's declaration

 

 

 

Nd] By making this application, | declare that all information in this application is true and correct (note: it is
ZN unlawful to provide false or misleading information).

 

 

Application Details - IDAS form 1
Version 1.0 18 December 2009

 

 

 

Page 7

OIL

Notes for completing this form

Question 8:

* Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required
for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is
required under section 263, then an application must contain, or be accompanied by, the written consent of the
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application.

e Owner's consent is not required for a mobile and temporary ERA.

Question 9:

e Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation.
Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is
required to be given, and the evidence required, to support the application.

Question 13:

¢ The Building and Construction Industry (Portablé Long Service Leave) Act 1991 prescribes when the portable
long service leave levy is payable.

¢ The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.

Question 14:

e The portable long service leave levy need not be paid when the application is made, but the Building and
Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
permit is issued.

¢ Building and Construction Industry Notification and Payment Forms are available from any Queensland post
office or agency, on request from QLeave, or can be completed on the QLeave website at
www.qgleave.qid.gov. au. For further information contact QLeave on 1800 803 481 or www.qleave.qld.gov.au.

Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a
purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act
2009) or as required by Parliament. This information may be stored in a departmental database. The information
collected will be retained as required by the Public Records Act 2002.

 

OFFICE USE ONLY

 

 

Date received Reference numbers

 

 

 

 

 

NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER

 

 

 

 

 

 

To: Council. | have been engaged as the private certifier for the
. building work referred to in this application.

Date of Name BSA Certification Building

engagement license number classification/s

 

 

 

 

 

 

 

Application Details - IDAS form 14
Version 1.0 18 December 2009

 

Page 8

OL

QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)

 

Date receipted :
form sighted by|Name of officer who
assessment __|sighted the form

manager

QLeave Project {Amount

Description of the work Number paid ($)

Date paid

 

 

 

 

 

 

 

 

 

 

The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This
form and all other required application materials should be sent to your assessment manager and any referral
agencies.

 

Application Details - IDAS form 1
' Version 1.0 18 December 2009

Page 9

 

 

 

 

 

 

 

 

 

integrated, Development'Assessment'System form

Building or operational work assessable
against a planning scheme - IDAS form 6

(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)

 

 

This form must be completed for development applications for building works or operational work assessable against
a planning scheme.

You MUST complete ALL questions unless the form indicates otherwise. Incomplete form
necessary information and documentation will result in your applicatibn no!

aT ome CBS
19 MAR 2010

provide any mandatory supporting information identified on the prmeasteing mp iny.vAgur
application. pupquntin® moe

 
 
   

           
   

For all development applications, you must:

*® complete Applicant details - IDAS form 1

 

. complete any other forms relevant to your application
.

     

All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.

This form can also be used for development on strategic portland under the Transport Infrastructure Act 1994.

 

4. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es)

 

(1 building work - complete table A [X] operational work - complete table B

 

Table B

What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es)

LJ road works (] stormwater &X) water infrastructure
[] drainage Works ( earthworks ((] sewerage infrastructure
(7 landscaping LO signage (J clearing vegetation under the planning scheme

LL other - please specify below

What type of approval is being sought? (if you have indicated multiple works in the above question, please
use an attachment to this form to detail each approval request)

[X} development permit (J preliminary approval LD both - specify below

Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)

XJ No (11 Yes - specify the number of lots being created

Are there any current approvals associated with this application? (e.g. material change of use)

IX] No (] Yes - provide details below

 

 

 

 

 

 

 

 

Page 10

aa

 

 

 

 

 

2. What is the dollar value of the proposed building work? (inc GST, materials and labour)| $ 14,640

 

 

Building and operational work assessable against a planning scheme - IDAS form 6
Version 1.0 18 December 2009

Page 11

LILO

 

3. Confirm.the following mandatory supporting information accompanies this application

 

Confirmation

of lodgement Method of lodgement

 

All applications for operational works

 

site plans drawn to scale which show the following:

e the location and site area of the land to which the application relates
(relevant land)

e the north point

e the boundaries of the relevant land
the allotment layout showing existing lots, any proposed lots (including
the dimensions of those lots), existing or proposed road reserves, [x]confirmed over the counter
building envelopes and existing or proposed open space (note:
numbering is required for allt lots)

* any existing or proposed easements on the relevant land and their
function

e any access limitation strips

© alt existing and proposed roads and access points on the relevant land

 

‘a statement about how the proposed development addresses the local
government's planning schemes and any other planning documents L confirmed
relevant to the application

 

Applications for operational works involving earthworks (filling and excavating)

 

drawings showing:
e existing and proposed contours
® areas to be cut and filled
¢ the location and level of any permanent survey marks or reference
stations used as datum for the works (C]confirmed
e the location of any proposed retaining walls on the relevant land and
their height
the defined flood level (if applicable)
the defined fill level (if applicable)

 

Applications for operational works involving roadworks

 

drawings showing:

e existing and proposed contours

e the centreline or construction line showing chainages, bearings, offsets
if the construction line is not the centreline of the road and all
intersection points

¢ information for each curve including tangent point chainages and
offsets, curve radii, arc length, tangent length, superelevation (if
applicable) and curve widening (if applicable)

e kerb lines including kerb radii (where not parallel to centreline) and

tangent point changes (where not paraliel to centreline)

edge of pavement where kerb is not constructed (confirmed

position and extent of channelisation

location and details of ail traffic signs, guideposts, guardrail and other

street furniture

pavement markings including details on raised pavement markers

catchpit, manhole and pipeline locations

drainage details (if applicable)

cross road drainage culverts (if applicable)

‘concrete footpaths and cycle paths

location and details for access points, ramps and invert crossings

changes in surfacing material

 

 

 

 

Building and operational work assessable against a planning scheme - IDAS form 6
Version 1.0 18 December 2009

 

Page 12

LID

 

Confirmation
of lodgement

Method of lodgement

 

Applications for operational works involving stormwater drainage

 

drawings showing:

e existing and proposed contours

e drainage locations, diameters and class of pipe, open drains and
easements

*® manhole location, chainage and offset or co-ordinates and inlet and
outiet invert levels

inlet pit locations, chainage and offset or co-ordinates and invert and
kerb levels

{_]confirmed

 

Applications for operational works involving water reticulation

 

drawings showing:

e kerb lines or edge of pavement where kerb is not constructed

¢ location and levels of other utility services where affected by water
reticulation works

¢ pipe diameter, type of pipe and pipe alignment

¢ water main alignments

* water supply pump station details (if applicable)

e minor reservoir details (if applicable)

e conduits

e location of valves and fire hydrants

* jfocation of house connections (if applicable)

¢ location of bench marks and reference pegs

(_] confirmed

 

Applications for operational works involving sewerage reticulation

 

drawings showing:
location of all existing and proposed services

location of all house connection branches

kerb lines or edge of pavement where kerb is not constructed
chainages

design sewer invert levels

design top of manhole levels

type of manhole and manhole cover

pipe diameter, type of pipe and pipe alignment

location of house connections (if applicable)

sewer pump station details (if applicable)

location of all existing and proposed sewer fines and manhole locations

(Jconfirmed

 

Applications for operational works involving street lighting

 

drawings showing:

location of ail light poles and service conduits

location of all other cross road conduits

type of wattage and lighting

any traffic calming devices

additional! plans for roundabouts and major roads (if applicable)
details of any variations to normai alignment

details of lighting levels

 

 

[_] confirmed

 

 

 

Building and operational work assessable against a planning scheme - IDAS form 6

Version 1.0 18 December 2009

 

Page 13

oO

LL

 

Confirmation
of lodgement

Method of lodgement

 

Applications for operational works involving public utility services

 

drawings showing:

any existing light poles and power poles
any existing underground services
details of proposed services

alternation to existing services

(_]confirmed

 

Applications for operational works involving landscaping works

 

 

drawings showing:

the location of proposed plant species

a plant schedule indicating common and botanical names, pot sizes
and:numbers of plants

planting bed preparation details including topsoil depth, subgrade
preparation, mulch type and depth, type of turf, pebble, paving and
garden edge

the location and type of any existing trees to be retained
construction details of planter boxes, retaining walls and fences

the proposed maintenance period

irrigation system details

[confirmed

 

 

 

 

Notes for completing this form:
© This form can also be used for development applications for building works or operational works assessable
against the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is

mentioned, take it to mean the land use plan for the airport land.

Privacy -please refer to your assessment manager for further details on the use of information recorded in

this form.

 

OFFICE USE ONLY

Date Received Reference Numbers

 

 

 

 

 

 

 

 

The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and
all other required application materials should be sent to your assessment manager and any referral agencies.

 

Building and operational work assessable against a planning scheme - IDAS form 6

Version 1.0 18 December 2009

we

Page 14

 

 

 

 

 

 

 

 

 

 

Uae pee Te HELENE TNT ‘Assessment System checklist

 

Operational Works - IDAS Checklist 4

(Sustainable Planning Act 2009, version 1.0, 18 December 2009)

This checklist only applies when the development application seeks approval for

  
    
 
  

You should complete all questions unless the checklist indicates otherwise. D
All planning and development applications require applicants to complete the fo owing’ YElOD Ment Cou
« Applicant details -IDAS form 1 ‘ nter

° any forms or mandatory supporting information identified as forming part f ygur applcatiohS MAR 2010

 
  
   
 

If you are unsure of any answers to questions, phone or visit your local gover iment, ongo to Department of

  

Infrastructure and Planning's website, www.dip.qid.gov.au. wantin
The checklist and relevant sections do not need to be completed for applications relating on ilding work

requiring assessment against the Building Act 1975.

 

 

 

 

 

 

Part 1 - General questions . oo
4.1 Is the proposed operational work assessable under the planning scheme?
>] No

. You must complete Building and operational work assessable against a planning scheme - IDAS
(J Yes form 6

. Continue on to question 1.3

 

 

1.2 Is the proposed operational work assessable under any state planning regulatory provisions?

 

 

 

 

 

[Xj] No . Go to question 1.9
(Yes . Go to question 1.4
1.9 Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is

also assessable?

 

 

{] No

 

CO Yes . It is recommended that you complete part 6 of this checklist.

 

 

 

1.10 Does the Vegetation Management Act 1999 apply to any of the proposed operational work for the
clearing of native vegetation? .

 

 

—X] No

 

[] Yes . It is recommended that you complete part 7 of this checklist.

 

 

 

1.11 Is any of the proposed operational work for any thing constructed or installed that allows, under the
Water Act 2000, for taking or interfering with water from a watercourse, lake or spring (other than
using a water truck to pump water; and other than under the Water Act 2000, section 20(2), (3) or (5),
or from a dam constructed on a watercourse or lake?

 

 

i] No . It is recommended that you complete part 8 (starting from question 8.8) of this checklist.

 

 

 

L] Yes . It is recommended that you complete part 8 (starting from question 8.1) of this checklist.

 

 

Department of Infrastructure and Planning | Gp

 

 

 

 

Page 15

OIC

 

1.12 1s any of the proposed operational work tidal work, other than excluded work defined under the
Sustainable Planning Regulation 2009?

 

 

&] No

 

(Yes . \t is recommended that you compiete part 9 of this checklist.

 

 

1.13 Is any of the operational work proposed to be carried out within a coastal management district?

 

 

x] No

 

LJ Yes . (t is recommended that you complete part 10 of this checklist.

 

 

 

1.14 Is any of the proposed operational work for constructing or raising waterway barrier works under the
Fisheries Act 1994? ; :

 

 

x] No

 

 

(1 Yes ° It is recommended that you complete part 11 of this checklist.

 

 

1.15 Is any of the proposed operational work to be carried out completely or partly within a declared fish
habitat area under the Fisheries Act 1994?

 

 

&X] No-

 

 

LJ Yes . It is recommended that you complete part 12 of this checklist.

 

 

1.16 Is any of the proposed operational work removing, destroying or damaging marine plants under the
Fisheries Act 1994?

 

 

XJ No

 

(7 Yes . It is recommended that you complete part 13 of this checklist.

 

 

1.17 Is any of the operational work proposed to be carried out in a wild river area declared under the Wild
Rivers Act 2005?

 

 

—X] No

 

C] Yes . \t is recommended that you complete part 14 of this checklist.

 

 

1.18 Is any part of the premises located in part of a future state-controlled road or within 100 metres of a
state-controlled road?

 

 

J No

 

(1 Yes . It is recommended that you complete part 15 of this checklist.

 

 

 

Part 2 - State-controlled roads

 

 

2.1 is the proposed operational work for filling or excavating listed in the Sustainable Planning
Regulation 2009 schedule 11 and does it exceed the threshold or combined threshold?

 

 

—X] No e End of part 2 of this checklist.

 

C1 Yes e This application requires assessment by the Department of Transport and Main Roads as a
concurrence agency.

 

 

 

 

° End of part 2 of this checklist.

Section reference:
. Sustainable Planning Regulation 2009, schedule 7, table 3, items 1(b) and 2

 

Operational works - IDAS checklist 4
Version 1.0 December 2009

Page 16

OO

 

Part 8 - Taking or interfering with water

 

 

8.8 Is any of the proposed operational work for any thing constructed or installed that allows, under the
Water Act 2000, for taking or interfering with artesian water (other than using a water truck to pump
water)?

 

 

IXJNo

 

° You must complete Taking artesian or sub-artesian water - IDAS form 12.
This application requires assessment by the Department of Environment and Resource
Management as a concurrence agency.

LJ Yes

 

 

 

8.9 ls any of the proposed operational work for any thing constructed or installed that allows, under the
Water Act 2000, for taking overland flow water (other than using a water truck to pump water)?

 

 

{J No ° Go to question 8.12.

 

 

(1 Yes

 

 

8.12 Is any of the proposed operationai work for any thing constructed or installed that allows, under the
Water Act 2000, for taking or interfering with subartesian water (other than using a water truck to
pump water)?

 

 

No . Go to question 8.14
(Yes

 

 

 

 

8.14 Does any of the proposed operational work for any thing constructed or installed that allows, under
the Water Act 2000, for interfering with overland flow water (other than using a water truck to pump
water)?

 

 

[J No

Go to question 8.19

 

C] Yes

 

 

 

8.49 Is the proposed operational work for the following?

 

 

 

 

 

 

for the construction of a referable dam as defined under the Water Supply (Safety CO Yes [No
and Reliability) Act 2008

to increase the storage capacity of a referable dam by more than 10 per cent 0 Yes {) No
. If yes to any of the above you must complete Referable dam - IDAS form 16.

. This application requires assessment by the Department of Environment and Resource Management

(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application

Section reference:

. Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, items 3 and 4

. Sustainable Planning Regulation 2009, schedule 5, part 1, table 4, items 3 and 4

° Sustainable Planning Regulation 2009, schedule 7, table 2, items 9, 10 and 11

. Water Act 2000, section 966A and 966B (note: no current wild river declaration identifies taking or interfering

with subartesian water as assessable)
Wild Rivers Act 2005, section 43A

e Wild Rivers Code (note: this code does not currently contain applicable provision for taking or interfering with
artesian water)
° Relevant wild river declarations

 

Operational works - DAS checklist 4
Version 1.0 December 2009

 

Page 17

OO

Notes for completing this form:

. Applicant details - IDAS form 1 and Development application assessment - IDAS checklist 1 must be
completed for all development applications to be considered.
. The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning.

Privacy - please refer to the assessment manager for further details on the use of information recorded in
this form.

Disclaimer:

While the Department of Infrastructure and Planning (D!P) believes that the information contained on this form and
provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on the
information without first making your own enquiries regarding the interpretation and application of the applicable
legislation to your circumstances.

To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for
negligence) for errors or omissions of any kind or for any toss (including direct and indirect losses), damage or other
consequence which may arise from your reliance on this process and the information contained on this form.

ot

 

Operational works - IDAS checklist 4
Version 1.0 December 2009

Page 18

 

Sunshine Coast LAND USE SECTION FEES

Regional Council

 

: CIVICA TYPE RECEIPT TYPE
SALE OF DOCUMENTS
Superseded Planning Scheme Documentation 520
Copy of Permit/Approval Letter 110

The Noosa Plan Documentation 111

APPLICATION FEES
Material Change of Use - Code/Impact MCU

Consistent 521
Inconsistent 521
Assessment under Superseded Planning Scheme . 521
Modification to a Development Permit MOD DP . 521
Extension of a Currency Period : 521
Lot Reconfiguration , RECONFIG 521
@ Bldg Work assessable against the Planning Scheme 521
PRE LODGEMENT REVIEW ; .
Half Hour §22
One Hour , §22
ADVERTISING .
: + Purchase Advertised Applications 523
JETTIES .
* Jetty Application Fee 922 524
Jetty Bond .. § Sbe 51
. . (Category 4)
BONDS :
Performance Bond . 51
(Category 9)
SEARCH FEE
" Search of Land Use Section file 112
© Liquor Licensing Request 113

 

TOTAL $e2eo

NAME: S6m_ - Grtorarcen
ADDRESS: © /Wvddiogha.~ Clone
: bw fe fuioe a Vie 3S

 

 

 

FILE NO: {o] uwoG DATE: 22/3{]{ 10
RECEIPT NO: Ynlark.O “Signature of TP Officer: P'S Su reo

AUTHORITY NO:

V

177 Shore have Br.

[2010] voto /j,

Page 19

CALCULATION OF FEES

 

APPLICATION

FEE

TOTAL
FEES

 

MCU - CODE ASSESSMENT
Details of Development

Consistent 1.0
Inconsistent 3.0

FEE CALCULATION

 

MCU - IMPACT ASSESSMENT
Details of Development

Consistent 1.0
Inconsistent 3.0

>

FEE CALCULATION

4

 

OPERATIONAL WORKS
Details of Development

FEE CALCULATION

 

 

 

TOTAL FEES

 

 

 

Used in these records

About this file

File size
800 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

10_0406 - Operational Works - Jetty [As Published].pdf · 800 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.