OO

 

Part 8 - Taking or interfering with water

 

 

8.8 Is any of the proposed operational work for any thing constructed or installed that allows, under the
Water Act 2000, for taking or interfering with artesian water (other than using a water truck to pump
water)?

 

 

IXJNo

 

° You must complete Taking artesian or sub-artesian water - IDAS form 12.
This application requires assessment by the Department of Environment and Resource
Management as a concurrence agency.

LJ Yes

 

 

 

8.9 ls any of the proposed operational work for any thing constructed or installed that allows, under the
Water Act 2000, for taking overland flow water (other than using a water truck to pump water)?

 

 

{J No ° Go to question 8.12.

 

 

(1 Yes

 

 

8.12 Is any of the proposed operationai work for any thing constructed or installed that allows, under the
Water Act 2000, for taking or interfering with subartesian water (other than using a water truck to
pump water)?

 

 

No . Go to question 8.14
(Yes

 

 

 

 

8.14 Does any of the proposed operational work for any thing constructed or installed that allows, under
the Water Act 2000, for interfering with overland flow water (other than using a water truck to pump
water)?

 

 

[J No

Go to question 8.19

 

C] Yes

 

 

 

8.49 Is the proposed operational work for the following?

 

 

 

 

 

 

for the construction of a referable dam as defined under the Water Supply (Safety CO Yes [No
and Reliability) Act 2008

to increase the storage capacity of a referable dam by more than 10 per cent 0 Yes {) No
. If yes to any of the above you must complete Referable dam - IDAS form 16.

. This application requires assessment by the Department of Environment and Resource Management

(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application

Section reference:

. Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, items 3 and 4

. Sustainable Planning Regulation 2009, schedule 5, part 1, table 4, items 3 and 4

° Sustainable Planning Regulation 2009, schedule 7, table 2, items 9, 10 and 11

. Water Act 2000, section 966A and 966B (note: no current wild river declaration identifies taking or interfering

with subartesian water as assessable)
Wild Rivers Act 2005, section 43A

e Wild Rivers Code (note: this code does not currently contain applicable provision for taking or interfering with
artesian water)
° Relevant wild river declarations

 

Operational works - DAS checklist 4
Version 1.0 December 2009

 

Used in these records

About this file

File size
800 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

10_0406 - Operational Works - Jetty [As Published].pdf · 800 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.