Amended Bushfire Risk Assessment and Risk Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Ecological Natural Area Management
Recommendations for Part E: Natural hazards of the Queensland State Planning Policy 2017
It is recommended that, notwithstanding that the proposed building location is in an area of
Potential Bushfire Hazard:
• The building siting, construction, firefighting resources etc appropriately mitigates the
potential bushfire Hazard as required by the SPP
• The development does not unduly burden emergency services as there is good access for
firefighting appliances, good fire fighting space, good water supply and contributes only one
extra building in the emergency services area
• The building and the cleared and hard-standing areas decreases the severity of a bushfire
on the lot and therefore does not increase severity of the bushfire Hazard and,
• There will be no hazardous material stored on the lot.
Bushfire Risk Assessment and Management Plan for a small rural subdivision at 15 Jirrama Cr, Cooroibah March 2022
7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.