Officer: 	Monkeith Kadhum
Direct Telephone: 	5329 6293
Our Reference:	OPW19/0239
Your Reference:	02518
8 November 2019
Gympie Terrace Noosaville P/L TTE
C/- Martoo Consulting Pty Ltd
PO Box 1684
NOOSA HEADS  QLD  4567
[email protected]
Dear Nadine
Information Request
Planning Act 2016
I refer to your application and advise that Council requires further information to satisfactorily assess the proposal.
application details
Application No.	OPW19/0239
Street Address:	217 Gympie Tce Noosaville Qld 4566
Real Property Description:	Lot 1 RP 66483, Lot 1 RP 70165
Planning Scheme:	The Noosa Plan (8 June 2018)
INFORMATION REQUIRED
The information requested is set out below:
Issue
Given the prominence of the area, the significant traffic flows and location of the site near a busy commercial and touristic area, it is considered necessary a construction and traffic management plan be provided for assessment prior to issuing a permit approval for OPW. Reference is also made to Condition 43 of the higher order approval MCU19/0030.
Information Required
Provide construction and  traffic management plan/s that address the requirements of  Condition 43 of MCU19/0030, and in particular but not limited to the following:
Timeline and duration/s for the proposed piles and earth excavation works, particularly avoiding peak times sessions (eg public and school holidays).
Traffic management measures to that address minimising any potential adverse impact on traffic movements due to the development works and achieving no obstruction to traffic flows on the local streets.
Measures to ensure unobstructed and safe pedestrian access across the frontage of the site is maintained at all times.
Parking arrangement for machineries and workers’ vehicles during the development works.
Minimising impact of noise and dust emissions on neighbouring properties during the piles and excavation works.
Issue
Concerns regarding the management and pumping of stormwater and groundwater from excavated area during construction, particularly in relation to the discharging of contaminated water into the receiving stormwater system and into Noosa River.
Information Required
Provide details and information, prepared by suitably qualified and registered engineer, but not limited to the following:
Procedure and frequency for water testing of sediment contaminated pumped water.
Procedure and frequency for water testing for potential of Acid Sufate contaminated pumped water.
Measures to be implemented to control and treat silt/sediment contaminated water (eg silt settlement tank, silt separator) to achieve the accepted targets*.
Measures to be implemented to control and treat Acid Sulfate contaminated water to achieve the required parameters prior to releasing from site**.
Type of pump and measures to be used to control noise emissions to approved accepted levels.
Issue
Proposed stair to the basement is not shown the current approved plans for the development
Information Required
Provide the following confirmations/general information:
The proposed stair is approved or will be approved for inclusion in the development.
The stair or door design to demonstrate the protection of the basement from flood inundation during heavy stormwater event (eg 1% AEP Defined Flood Event).

Foot Notes
(*) Assessment against the Water Sensitive Design Code of The Noosa Plan to demonstrate that released waters are treated to not affect downstream ecology.
(**)  Surface waters must be sampled and tested at a NATA certified laboratory to confirm the following water parameters are met prior to release from the site:
a pH range of 6.5-8.5 pH units;
50mg/L maximum  total suspended solids concentration;
0.3mg/L maximum total iron concentration;
0.2mg/L maximum total aluminium concentration.
General Notes
Evidence QLeave payment is required before the assessment manager decides this application for OPW.
Please note that Condition 6 of the associated higher order approval requires the submission of a $20,000 performance bond prior to the issue of a Development Permit for Operational Works.
due date for response to information request
The due date for providing the requested information is 17 February 2020. Please advise Council of your response to this information request in accordance with section 13 of the Development Assessment Rules.
If you do not provide a response before the due date, it will be taken as if you have decided not to respond to the information request and Council will continue with the assessment of your application.
other details
You can follow the progress of this application online at www.noosa.qld.gov.au. The “Online Services” page can be accessed via "Quick Links" on the left hand side of the screen.
Should you have any further queries in relation to the above, please do not hesitate to contact me on the number above.
Yours faithfully,

Monkeith Kadhum
Development Engineer

[word/footer1.xml]
Page 3 of 3

[word/footer2.xml]
PO Box 141		P. (07) 5329 6500	[email protected]	
	TEWANTIN  QLD  4565	F. (07) 5329 6501	www.noosa.qld.gov.au
				Page 1 of 1

[word/header1.xml]
3

Used in these records

About this file

File size
122 KB (small file)
File type
DOCX

No other editions are linked here.

Original file

Log in to download the original file

Information Request OPW19 0239.docx · 122 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.