Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

06/2552 - MCU Visitor Accomodation Type 4 [As Published] · 132006.2552

of 57

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

 

NE@k@KY:ee Referral Agencies Checklist

 

YES NO

 

IDAS REFERRAL AGENCY + TRIGGERS
Please tick ¥

 

Department of Main Roads (Concurrence or Advice)
e StateControlledRoad  — —— tte tine

 

Environmental Protection Agency (Concurrence)
e Environmentally Relevant Activity (for non-devolved Council as EPA)

« Contaminated land 4
‘(aor Management/Contaminated Land Register

. (POP oni used as a ‘notifiable activity’

« — Industrial land changed to sensitive uses (eg school)

¢ Coastal related developments

 

Department of Natural Resources & Mines
e Acid sulphate soils (Advice)
e Clearing of native vegetation on freehold land (Concurrence)
e Operational Work - taking or interfering with
water/watercourse/referrable dam (Concurrence)
« Removal of quarry material from a water course (Concurrence)

 

Department of Primary Industries (Concurrence)
e Environmentally Relevant Activities (piggeries/feedlots)

 

Queensland Fire & Rescue Authority (Advice)
® Building work containing special fire services required by SBRs

 

Department of Emergency Services (DES)
@ MCU - Major hazard facility (Concurrence)

 

Department of Local Government & Planning (Referral-Coordination)
« 30or more different concurrence agencies
e Involves a prescribed facility (Schedule 6 IP Regulations)

e Within a prescribed area (Schedule 7 IP Regulations)

 

 

OTHER STATE AGENCIES + TRIGGERS

 

Portable Long Service Leave Levy (PLSL)
Check for Operational Works Value in excess of $85,000.00 with =} ee fee
_respect to PLSL

 

 

OWNER’S CONSENT

 

Department of NaturalResources and Mines ee cece

 

 

 

 

 

REFERRAL AGENCY RESPONSE RECEIVED BEFORE LODGEMENT

 

 

 

For further clarification refer to IDAS Guides 1 - 18 prepared by Department of Loca! Government & Planning.

AOP2 15/10/2003 g:\anduse\templates\referral agencies checklist.doc

\

 

 
Full text of the other 56 pages

Page 2

 

NOOSA Checklist - Applications Involving Land
or Development & Land Use Sections
IDAS APPLICATION

This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.

 

1._ APPLICATION FORMS
1.1. Form 1 PartA

1.1.1. Ensure that the form is fully completed.

 

 

 

 

1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required.
1.1.2.1 if there are multiple owners, the consent of each owner is required.
4.1.2.2 If the owner of the land is a company, either ACN No. or Company Seal required.
1.2. Form’ Part B-O Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached.
1.1.2.1 Ensure that each of Forms B-O which are attached are fully completed.

2. REFERRAL INFORMATION ~. : ~ 4
LZ

2.1 Ensure that items 1-23 have been checked and/or completed with regard to referrals.

3. ~ ENVIRONMENTALLY RELEVANT ACTIVITIES nae .

 

3.1. Ensure that Part G is completed if EPA referral is required. p/ J

3.2. Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.

‘4, - FORM 2 - REQUEST.TO CHANGE APPROVAL

4.1 Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent.

 

 

 

 

 

 

 

 

 

 

 

5." PLANS _” st
5.1. Ensure that at feast 6 sets of the Plan of Development (5 for Reconfiguration and Operationa! be
Works) accompanies the application. In addition ensure that each set is complete.
5.2. Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is “
unbound.
6. ‘SUPPORTING INFORMATION ok as
6.1 Ensure that at least 6 copies of any report accompanies the application (5 for Reconfi iguration 6
and Operational Works). if the application is accompanied by a covering letter, ensure that it is
capable of reproduction. [v]
6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. \
7. FRE OS OT IST

 

7A Ensure that the application fee, as determined from the Council's adopted scale of fees,

 

 

 

 

 

accompanies the application or has been paid. ae
7.2. Ensure that the fee which has been paid is recorded on the application form. v4
Receiving Officer RS... degree Date... 12, ‘i foe Qe
Having completed this form and accepted the gpplication, please deliver both to the following IDAS Agplication Receiving

trays:-

e If the application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section.

¢ — Ifthe application is for an Material Change of Use & Reconfiguration - AOP1's desk in the Land Use Section.

«Ifthe application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the
Land Development Section.

«  Inall other circumstances — AOP1's desk in the Land Use Section.

Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.

 

 

 

SEP g:\antYorms\application checklist.doc

Page 3

>>

       
  

vrw
v
urban
Our Ref: S06-0199 strategies
15 November 2006 DEVELOPMENT CONSULTANTS

PRIVEE
16 NOV 2006

WONSA

  

TOWN PLANNING
URBAN DESIGN

The Chief Executive Officer : a
OUNCI

Noosa Council 3, sine 6 . *s/

PO Box 141 Oye

TEWANTIN QLD 4565 : z

Dear Sir

RE: DEVELOPMENT APPLICATION — MATERIAL CHANGE OF USE -
VISITOR ACCOMMODATION TYPE 4 CONVENTIONAL (MOTEL) AT
224-228 DAVID LOW WAY, PEREGIAN BEACH

Please find enclosed a development application for a material change of use
approval for the land at 224-228 David Low Way, Peregian Beach, described as
Lot 78 on P9311 (part) and Lot 1 on RP152737.

In support of the application, please find attached:

« IDAS Form 1 Parts A and D and Assessment Checklist;

= Six copies of the Town Planning Report prepared by Urban Strategies;

= Six copies of the proposal plans AQ00, A001, A101-A103, A501, A502 and
A601 prepared by H2o Architects; and

« A cheque to Council for the application fee of $26,400 (5 units x $785 + 5
units x $660 + 3 units x $525 x 3 inconsistent use).

Should Council have any query regarding this application, please contact our
office.

Yours faithfully
URBAN STRATEGIES (SUNSHINE COAST) PTY LTD

Chum

Samantha Cullen
SENIOR PLANNER

Encl, Coe oe Cnn ef _ Ke Len sed

e 1UXYS

‘CAshared\WPPRONSO60199\Letter - NC LadgeApplication !SNovO06.doc

SUNSHINE COAST

PO BOX 939 | 25 DUPORTH AVENUE URBAN STRATEGIES
MAROOCHYDORE 4558 | QUEENSLAND | AUSTRALIA UC SUNSHINE COAST } PTY LTD
BRISBANE ACN 106 124 172 ABN 66 106 124 172

PO BOX 3368 | LEVEL 1,39 GREY STREET

T 07-5443 9335 | F 07-5443 9885
SOUTH BRISBANE 4101 | QUEENSLAND | AUSTRALIA

[email protected]

Page 4

*.

. we

INTEGRATED PLANNING ACT 1997

       

Form 1 Development Application

y Common details

Part A, Version 2.4, 29 May 2006

 

The completion of all applicable questions on Part A is mandatory for all applications. Part A must be accompanied by the completed IDAS Assessment Checklist if
required, and by one (1) or more other completed parts of the Form as required. For more information on the parts of the Form refer to waw.ipa.qid.gov.au.
Any information requested in the form may be provided in an attachment to the application. For further information about completing the following details, refer to Guide 4.
Street address: {ncludinghouse number, street name, suburbflocaity name & postcode) (if applicable)
[ 224 & 228 David Low Way, PEREGIAN BEACH 4573 |

Description of land

Allland the subject of the application, must be
identified. However, a description of the land is net
‘Sequined in relafion tp a mobile or tamporary

1.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Environmentally Relevant Activity (ERA), 2. Name of water body or watercourse, within which the development is proposed: (if applicable)
Advice for completing Q2 - 02 apples if [ NA |
development is proposed within a water body or
Wetecourse. 3. Loton plan description (eg, Lot 123 on RP 4567) / GPS coordinates:
Advice for completing QS -
Sead scat dodgion Tweets | — [ Lot76on P93 (part) and Lot 1 on RP152737 |
Ce aannest am tie documents trough the | 4 The above description is for: (tick applicable box)
However, if the fend on wie the development is EX] the land on which the development is proposed; or
ec creenett poeta” |  (C] Gi) the tand adjoining the water body or watercourse, within which the development is
watercourse) provide ~ . proposed; or
0s Gi) the water body or watercourse.
a rang ener ony eeeton Bay). §. Shop / tenancy number. 6. Storey / level: 7. Total area of tand: (m? or ha):
Advice for completing QT - Q7 does it the
pe soso steerer Oto AM LNA 4 | WA | [ 4,200m2 |
Seen Tei cntretara,  |8- Local government area in which the land is situated: (eg. Esk, Hervey Bay, Woocao et. (if appfcabie)
Note: roa below high water marke netwetina | [Noosa Shire Council J
Jocal government's area undess provided for under the
Local Goverment Act 1993, . 9. Port authority for the strategic port {and or strategic port land tidal area on which the
Bete for comin 2 potioder . development is proposed: (eg. Port of Brisbane, Port of Townsvitle) (if applicable)
port land tidal area. For more details refer to Guide 11 | NA |
Proposal details 10. Existing use of the land: (eg. vacant, single house, shop etc.)
{f there Is insufficient room available, detals may be | Vacant |
provided in an attachment to the application.
11. Proposed use of the land: (eg. 6 unit apartment building, 30 lot residential subdivision, ERA for aquaculture in

ponds with a total area of 7 ha for which wastes are released into waters etc).

[ Visitor Accommodation Type 4 - Conventional (Motel) |
Other appliceble parts of Form 1 12. Other parts of Form 1 completed as part of this application: (eg. Part D, Part 1, etc)
Part A must always be accompanied by other [ Part D ]
completed parts of Form 1. For information about
when a part of Form 1 may apply refer to Guide 1.
Applicant details 13. Applicant's name: 15. Contact person:
Cogito rairatepicten Me | [ Raphil Py Lid ACV 1/3 Fl 905 | —_[ Scott Sobey
When signing end lodaing this application 14. Contact number. 16. Facsimile number/e-mail address:
Rrednginetin toyed vp baal 07 5443 9335 07 5443 9885
manager, eny referral agency & the Chief Executive [email protected]
teeesing and deidng the epptecton 47. Postal address:
tthe soplkant ls a company - & contact person C/- Urban Strategies (Sunshine Coast) Pty Ltd

PO Box 939 MAROOCHYDORE QLD 4558
18. Signature, { 19. Date:

 

 

 

Mey§

{Thiofok -

 

 

 

Page 5

my

INTEGRATED PLANNING ACT 1997

Part A, Version 2.4, 29 May 2006

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Land owner's consent (# appicable) 20. Land owner's consent to the making of this application:
Secon 3.2.1(3) of the IPA prescribes that:
appteason muck contin, o be appa by. te Name Zt Signature Date
writen consent of the land oemer/s, if the application Raohill Ltd
involves:
() a metered change of use, o aaneee aphill Pty coc eceeeeeeeeceecee eee.
8) reconfiguration of a lot
(work on lend below high-weter mark & not within a (i)
canal ax defined under the Coastal Protectonend} |
Act 199508
(¥) work on rail corridor land defined under the (iii)
Transport inrastuctre Act 1994, ft
Secon 3.8.1(2\a) of the IPA provides that
landowners consent Is not required for a mablle or (v)
femporayERA. |] rveenttttteeeentteeeecceeeceseteeteseretetteeeccccceeseeeseeeeneereseeererneseeercetecbeceeeeneeeenered
For mare information refer to Guide 1 (v)
Resource entitfement (# appicable) 21. Does this application involve a State resource prescribed under a regulation (other than involving
Section 3.2.18) of the IPA reques evidence Of quarry material on State coastal land under the Coastal Protection and Management Act 1996)?
involve a preserbed Sts resource, EXINO - goto 024 LIYES - got a22
spplioncannaton tke 0 me property oan 22. This application is accompanied by evidence: (tick applicable box)
wink evince of rere oterent C1 (i) of the allocation of, or entitlement to, the resource - attach evidence and go to Q23{v)
Rafer to schedule 10 of the integrated Planning Dil) the chief executive of the department administering the resource is satisfied the
1998 that the nature of evidence ' 5 o 5 ¥ .
roa ies Se Presarbee ioe waoette development is consistent with an allocation of, or entitlement to, the resource - go
(fii) the chief executive of the department administering the resource is satisfied the
development application m ceed in the absence of an allocation of, or
entitlement to, the resource - go to Q23
Advice for completing 023 evidence 23. Evidence of the resource entitlement
eres aa eae Tones | i) Resource entitlement / authority details (vil) Official stamp of the department
The official stamp of the Department of Natural administering the resource (if
Resourcas, Mines end Water is mandatory where the . applicable)
application involves eny water or riverine quarry (i) Name of “a officer
Material under the Water Act 2000.
Secon 32464) allows the resource emencger to int
evidence may be used. i) must ii iti
“ence me eee Wi) (iii) Position “elas officer
(iv) Signature of delegated officer
{v) Date
(vi) = date of evidence —
Assessment triggers 24. Is the IDAS Assessment Checklist completed and attached to this application?
This checklist does not apply if the appicaon requires X Yes (J NO - the assessment manager may refuse to accept this application on the
Pe cae ker oven " grounds that the application has not been properly made
Plans / drawings / reports 25. Plans/drawings/reports accompanying this application:

‘An application should be accompanied by details to
support the proposel & enable the assessment
manager, referral agencies and any person viewing
the application during public scrutiny or public
notification tn understand the scope of the proposal
‘and any potential impact.

 

 

Pian / Drawing / Report Number Title Date
(i) _ Plans prepared by H2o Architects | Site Plan, Ground Floor, First | 10{11(0G

(i) Drawing nos. A000, A101, A102,

i) A103, A501, A502 and A601

 

 

 

 

 

 

 

 

PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide ail applicable information required by Part A
and any other relevant part of Form 1.

OFFICE USE ONLY (appicable teassessment manager's)

 

[FEE Yeyor | rece | Huloh Meet IP.) fa nenegl eam Loe [aor]

Notification of Engagement of Private Certifier (Optional format S

To.

Nata nfennanament of |

Accreditation Number

Council. | have been engaged as the private certifier for the building work referred fo in this application.

Nama: Sianstira-

Page 6

INTEGRATED PLANNING ACT 1997

NX Form 1 Development Application

Part D, Version 2.0, 4 October 2004

 

Material change of use

assessable against a local government’s planning scheme

E
a.

 

Completion of all applicable questions on Part D is mandatory for all applications involving assessment of a
material change of use (MCU) assessable against a !ocal governments planning scheme.

 

Nature of the application

A development permit authorises
development to occur, while a preliminary
approval is a step in the approval process
and does not authorise development ta occur,

1.

This application is for: (tick 1 or both if applicable)

CJ Preliminary approval for a material change of use of premises including conceptual
design for any associated works that require approval under the planning scheme (ie. ,
consideration of the proposal concept)

AND/OR

({X] Development permit for a material change of use of premises including conceptual
design for any associated works that require approval under the planning scheme.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The subject land 2. How the subject land is identified in the planning scheme (name the zone, precinct etc.)
For the definition of “grass floor area” go to ; i
the planning scheme against which the | Semi-Attached Housing Zone
application will be assessed,
3. Existing gross floor area: (if applicable) Nil |
4. Are there any existing easements on the land?
NO :
(J YES - attach plans of the location and details of the purpose of the easement
Material change of use details 5. Details of the change to the use of the land: (eg. vacant land to shopping centre, house to apartment building,
vacant land to industry (tyre manufacturing) ete.)
| Vacant land to Visitor Accommodation Type 4 - Conventional (Motel) |
6. Number of employees: | Standard for use |
7. Operating days and hours: | Standard for use |
Associated building works details (if |g Site cover: 480m2 (40%)
applicable)
For the definition of "site cover’, “gross floor .
area” and “storey” go to the planning scheme Gross floor area: 563m2 (46%)
inst which thi lication will be . .
med 40. Number of on-site car parking spaces: | 15 spaces |
11. Number of storeys / maximum height above natural ground: 2 storeys / 8.0m
12. Number of employees Standard for use
13. Hours and days the use will operate | Standard for use |
Associated operational works details | 14. Details of associated operational works (eg. landscaping, cut and fil, drainage, road works etc.)

(if applicable}

 

 

[ Frontage works, driveway, landscaping, drainage

|

 

PLEASE NOTE

This application cannot be accepted unless accompanied by Part A of Form 1.
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information

 

requested by Part A and any other relevant part of Form 1.

 

OFFICE USE ONLY (applicable fo assessment manager)

 

DATE RECEIVED

 

 

REFERENCE |
NUMBERIS

 

 

 

 

Page 7

INTEGRATED PLANNING ACT 1997

Part N, Version 1.0, 4 October 2004

 

   

'
Completion of all questions on Part N is mandatory for all applications involving assessment gamer the Environmental Protection Act 1994 when
development is proposed on contaminated or potentially contaminated land.

For further information refer to Guide 5 Contaminated land matters available free from www.ipa.qid.gov.au or the Environmental Protection Agency's
(EPA's) information sheets available free from www.epa.qid.gov.au under Ecoaccess/ business and industry. Alternatively, contact the local government.

 

 

 

 

 

 

 

 

 

 

 

 

Nature of the application 1. This application is for: (Tick one (1) or both if applicable)
Exemptions may apply to your proposal.
Relerto Guide 3 Coote lad matters Aspect of development . Type of approval being sort
for advice regarding development that is 7 — :
exempl from this assessable development &] Material change of use (1 Preliminary approval &] Development permit
trigger.
LJ Reconfiguring a lot C1 Preliminary approval [J Development permit
2. Does this application require assessment against a planning scheme?
(No {K YES - complete other relevant parts of the DAS Application Form 1
The subject land 3. Has an Environmental Management Register (EMR) and/or Contaminated Land Register (CLR)
search been conducted for the !and the subject of the application?
I No (DYES - attach resutts of the search and complete Q4

4. All or part of the land the subject of the application is:
(1 (i) _ on the EMR or the CLR under the Environmental Protection Act 1994,

(1 (ii) used for, or if the land is vacant, was last used for-
C1 (a) anotifiable activity
(J (b) an industrial activity and the proposed use is for a child care centre,

educational, recreational or residential purpose (including a caretaker residence on
industrial land),

OD (ii) _ in an area for which an area management advice has been given for natural
mineralisation or industrial activity and the proposed use is for child care, educational,
recreational or residential purpose (including a caretaker residence on industrial land),

&] (iv) in an area for which an area management advice has been given for unexploded

 

ordnance.
Plans and documents 5. Confirm, by ticking the applicable box(es), that the following details are provided in plans and
For further information about preparing a written information supporting this application:
proposal report. refer to Guide 7 Preparing 8 Ci) _ plans showing where any Notifiable Activity, Hazardous Contaminant, or potentially

contaminated activity / activities have occurred on site;

C1 (il) _ if the application involves a material change of use from an industrial use to a more
sensitive use (eg. child care, educational, recreational or residential purposes), supply a detailed
site history outlining previous potentially contaminated uses on the site

PLEASE NOTE
PART N of Form 1 cannot be accepted by the assessment manger unless accompanied by PART A of Form 1.

The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 7.

 

 

OFFICE USE ONLY (applicable to assessment manager)

: REFERENCE
DATE RECEIVED NUMBERIS

 

 

 

 

 

 

 

Page 8

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 18.0, 10 November 2006

    
    
    

Form 1 Development Application

  

(Formerly the “Referrals Checklist’)

 

IMPORTANT NOTE FOR ALL APPLICANTS:

17 OCT 2s
NOOSA SHIRE COUNCK £ ]
1. This checklist was formerty referred to as the "Referrals Checklist’. Some of the ‘Guides’ to using the IDAS Application For fnue to retB {8E document’a
"Referrals Checklist”. The name of this checklist was changed from 25 July 2005 to more accurately describe its function. Drea

 
  
  

2. Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensland State’e
Agency, Dept. of Natural Resources, Mines and Water, Queensland Heritage Council etc.).

3. This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant to
determine the assessment manager’ for the application.

4, Therefore, the completion of all questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B only).
5. {tis the responsibility of the applicant to accurately complete this checklist-

6. — Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.

7.

The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to identify
any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers referral coordination?.

8. — Toassist you in answering the following questions a series of guides are available free from the IPA website www.ipa.qld.aov.au. Guide 25 explains the rote of the IDAS
Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application.

9. Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
www. ipa.qid.gov.au. :
40. Section 2 on page 10 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006.

SECTION 41 - STATE ASSESSMENT (completion mandatory)

Note: The following state assessment triggers apply to development other than for building work assessable against the Building Regulation 2006.

 

 

 

Environmentally relevant activity 1. The application involves: (tick applicable box/es)

For mare information refer to Guide 4. } C (i) an environmentally relevant activity (ERA) for which a code for environmental compliance
Unless you answered “none of the above” to Q1, the

apolcation requires assessment by the | has not been made - complete Part G of Form 1 ; ;

administering authority®. CO (ii) a mobile or temporary ERA for which a code of environmental compliance has not been
If an entity, other than the administering authority, is made - complete Part G of Form 7

the assessment manager for the application, the ae

administering authority is a concurrence agency for & (iii) none of the above

the application in relation to this matter.

Note: An application involving ERA 19 and/or 20 will
also require completion of Part Kr of Form 1 for
approval where an allocation under tha Water Act

 

2000 is required,

State-controlled road matters 2, The application involves: (tick applicable box/es)

Fe information refer to Guide 3. : .

Une you aveered "noe ofthe ab vet'to.02 the [1 (i) development on land contiguous’ to a State controlled road and for -

application triggers referral to the Department of [J] (a) material change of use assessable against the planning scheme;

Main Roads (DMR) as a referral agency. Oo (b) recon figuring alot unless

In certain circumstances DMR will be an advice .

agency, while in other circumstances DMR will be a e the total number of lots is not increased; and

ceheoctterR latin wit asi yout « the total number of lots abutting the State-controlled road is not increased;
ul eq

determine where DMR is an advice or concurrence LJ (c) operational work (not associated with a material change of use assessable against the

agency for the application. planning scheme or reconfiguring a tot mentioned in (b) above}-

« associated with access to a State-controlled road; or

¢ for filling or excavation; or

« involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.

 

 

1 The assessment manager is responsible for assessing and deciding an IDAS application. The assessment manager fer an application is prescribed in schedule 8A of the IPA.

2 For additional information refer to Guide 6 ‘Does my application trigger the referral coordination process?’

3. The ‘administering authority’ may be either the Environmental Protection Agency, the relevant local government (for a devolved ERA) or the Queensland Department of Primary Industries and
Fisheries (for a delegated ERA).

4 Land contiguous to a State-controlled road is defined in schedute 14 of the IP Regutation to mean land - if part of the land is within 100m of the State-controlled road; or that is part of a future State-
controlled road.

Page 1

Page 9

INTEGRATED PLANNING ACT 1997
State-controlled road matters (cont)

IDAS Assessment Checklist, Version 18.0, 10 November 2006
71 (ii) development on land not contiguous to a State-controlled road and -

OD (a) material change of use -
« assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;

(71 (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
(1 ©) operational work (not associated with @ material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above}-
assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.

(iii) none of the above

 

Clearing vegetation
For more information refer to Guide +2.

Unless you answered “none of the above” to Q3, the
application requires assessment by the Department
of Natural Resources Mines and Water (NRMW).

If an agency other than NRMW is the assessment
manager for the application, NRMW is a
concurrence agency for the application in relation to
this matter.

IFyou ticked Q3{i) or (ii), your application requires
referral to NRMW for assessment regardless of
whether vegetation clearing is proposed or not.

The application involves: (tick applicable box/es)
(1 (i) material change of use -
(a) assessable against the planning scheme;
(b) on a lot containing -
* acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
« ifthere is No property map of assessable vegetation for the lot - remnant vegetation;
(c) where the existing use of the land is a rural or environmental use; and
(d) where the size of the land is 2 hectares or larger - complete Part J of Form 1 e}
QO (ii) reconfiguring a lot —
: (a) on alot containing a category 1, 2 or 3 area shown on a property map of

assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;

(b) where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and
(d) where the size of any lot created is 25 hectares or smalier - complete Part J of Form 1
(ii) operational work -
(a) for the clearing of native vegetation where the vegetation clearing i is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning

scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form 1

&1 (iv) . none of the above.

 

Strategic port land

For more information refer to Guide 11.

Wf you ticked (i) - the relevant Port Authority is the
assessment manager for the application. -

If you ticked (ii) Queensland Transport is a
concurrence agency for the application.

The application involves:

CL (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (Tl
Act) - complete Part! of Form 1

C1 (ii) a material change of use that is inconsistent with the land use plan approved under nD
TI Act for the strategic port land - complete Part | of Form 1

{&] (ii) none of the above

 

* Acid sulfate soils
For more information referto Guide 10.
Unless you answered “none of the above” to Q5, the
application requires assessment by Department of
Natural Resources Mines and Water (NRMW).
Hf an agency other than NRMW is the assessment
manager for the application, NRMW is an advice
agency for the application in relation to this matter.

 

 

The application involves development on land situated in an identified5 local government area

and where the surface of the land is: (tick applicable box)

(1 (i) below 20m AHDS and the development will involve the excavation of 1000m? or more of
soil or sediment at or below 5m AHD, or

C1 (ii) at or below 5m AHD and the development will involve filling the site with 1000m3 or more
of material

(iii) none of the above

 

5 The identified local government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cooloola, Oounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Mardochy, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.

6 Austrafian Height Datum (AHD).

Page 2

Page 10

INTEGRATED PLANNING ACT 1997

Major hazard facilities or possible 6.

major hazard facilities

For more information refer to Guide 17.

Ifyou answered “YES” to Q6, the application
fequires assessment by the Department of
Ememency Services (DES).

if an agency other than DES is the assessment
manager for the application, DES is a concurrence
agency for the application in relation to this matter.

(DAS Assessment Checklist, Version 18.0, 10 November 2006
Does the application involve a material change of use for a major hazard facility or possible
major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?

INO

CO YES - complete Part tof Form 1

 

Water related development under the | 7.

Water Act 2000

For more information about items (a) - (d), refer to
Guide 15, For mora information about item (e),
refer to Guide 14 Does my application involve
assessment of a referable dam?

Unless you answered ‘none of the above" to Q7, the
application requires assessment by the Department
of Natural Resources Mines and Water (NRMW}.

Jf an agency other than NRMW is the assessment
manager for the application, NRMW is a
concurrence agency for the application in relation to
this matter.

The application involves:

L (i) operational work, for taking or interfering with water under the Water Act 2000, that is:
(tick applicable box/es)

C (a) ina watercourse, lake or spring, or from a dam constructed on a watercourse (eg.
@ pump, gravity diversion, stream re-direction, weir or dam) - complete Part Ko, Ka, Ks, Ks, or Ko of
Form 1 whichever is applicable;

Lo (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
Ky of Form 7;

(J (©) for a subartesian bore, in declared groundwater area’, for use for purposes other
than stock and/or domestic use - complete Part Kr of Form 1;

(0 (a) for a subartesian bore, in certain declared groundwater area, for use for stock
and/or domestic purposes - complete Part Kr of Form 1;

(1 (e) for constructing a referable dam® or that will increase the storage capacity of a
referable dam by more than 10% - complete Part Ks of Form 1, or

CO (f) for taking or interfering with overland flow water - complete Parts Ke and G of Form 1

1 (ii) none of the above.

 

Removal of quarry material from a 8.

watercourse
For more information refer to Guide 16.

Ifyou answered “YES” to Q8, the application
Tequires assessment by the Department of Natural
Resources Mines and Water (NRMW).

If an agency other than NRMW is the assessment
manager for the application, NRMW is a
concurrence agency for the application in relation to
this matter.

Note: Part G of Form 1 is required to be completed
as the activity of removing quarry material from a
watercourse is also an Environmentally Relevant
Activity (ERA).

 

Does the application involve development for the removal of quarry material from a watercourse®
requiring an allocation notice under the Water Act 2000?

NO
[YES - complete Parts Kr and G of Form 1

 

7 The declared ground water areas are listed in Guide 13 Develooment in a declared catchment area,

8 Referable dam is defined under the Water Act 2000.
9 Watercourse is defined in sch 10 of the IPA.

Page 3

Page 11

(NTEGRATED PLANNING ACT 1997
Operational works in a tidal area or
coastal management district

For more information refer to Guide 18. For more
information aboul prescribed tidal work in local
government tidal areas refer to Guide 24,

Unless you answered “none of the above" to Q9, the
application requires assessment by the
Environmental Protection Agency (EPA).

If an agency other than EPA is the assessment
manager for the application, EPA is a concurrence
agency for the application in relation to this matter.

Local government is the assessment manager for all
prescribed tidal work.

 

Operational work below high water
mark

For more information refer to Guide 18. For more
information about prescribed tidal work in local
goverment tidal areas refer to Guide 24.

Unless you answered “none of the above" to Q10,
the application triggers refarral to Queensland
Transport (QT) {Maritime Safety Qld) as
concurrence agency.

Local government is the assessment manager for ali
prescribed tidal work,

9. The application involves operational work that is: (tick the applicable box/es)

(1 (i) tidal work" as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work — complete Part M of Form 1; OF

10. The application involves operational work that is: (tick the applicable box/es)

(1 (i) tidal work" as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work ~ complete Part M of Form 1; oF

C1 (ii) tidal work that is prescribed tidal work'4 - complete Part P of Form 1; oF
O (ii) carried out within a coastal management district'S under the Coastal Act and for -

Oi)

IDAS Assessment Checklist, Version 18.0, 10 November 2006

tidal work that is prescribed tidal work"' other than in a canal’? -complete Part P of Form 1; or

D (ii) carried out within a coastal management district under the Coastal Act and for - complete
Part M of Form 1 if any box/es (a} to (i) below are ticked.

Oe)

CI (b)
Oe)
Od)
Oe)
OW
O@)

Oth)
Di

constructing or installing works in a watercourse between MHWS and HAT (ie.
other than those works in tidal water) where the development has been determined not
to be assessable against the Water Act 2000 ;

constructing a canal'2 intended to be connected to tidal waters;

constructing an artificial waterway;
reclaiming land under tidal water;

disposing of dredge spoil or other solid waste material in tidal water;
interfering with quarry matertal on State coastal land above high-water mark;
draining or allowing drainage or flow of water or other matter across State

coastal land above high-water mark;

removing or interfering with coastal dunes on land, other than State coastal land,

that is in an erosion prone area and above high-water mark;

constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal fand, above high-water mark; or

&] (iv) none of the above.

Dita)

disposing of dredge spoil or other solid waste material in tidal water ~ complete Part

M of Form 1;

reclaiming land under tidal water — complete Part M of Form 1; or

constructing a canal’, if the canal is associated with reconfiguring a lot - complete

Part M of Form 7;

EX] (iv) none of the above.

 

Coastal management
For more information refer to Guide 18.

Unless you answered “none of the above" to Q11,
the application requires assessment by the
Environmental Protection Agency (EPA).

\f an agency other than EPA is the assessment
manager for the application, EPA is a concurrence
agency for the application in relation to this matter.

 

11,

The application involves: (tick the applicable box/es)
a material change of use assessable under a planning scheme involving operational

Di
O(i)

Diy
OW
)

work carried out completely or partly in a coastal management district!

a material change of use assessable under a planning scheme involving building
work, carried out completely or partly in a coastal management district that is -

e the construction of a new premises with a GFA’ of at least 1000m2

« the enlargement of the GFA of existing premises by more than 1000m?2

reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district

reconfiguring a lot'® assessable under schedule 8 of the IPA and in connection with
the construction of a canal"® - complete Part M of Form 4

none of the above

 

10 Tidal work is defined in sch 10 of the IPA.

11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within 2 local government tidal area.

12 Canal means canal as defined under the Coasta! Protection and Management Act 1995 .

13 Tidal work is defined in sch 10 of the IPA.

14 Prescribed Uda! work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a

coastal management districl under section 47(2) of that Act
16 Canal means canal as defined under the Coasta! Protection and Management Act 1995

17 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.
18 Under 5117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the cons!

accompanied by the application for the operational works to construct the artificial waterway.

Page 4

 

! us
n artificial watenway, mus

Page 12

INTEGRATED PLANNING ACT 1997

Development within the limits of a

port

For more information refer to Guide 18. For

information about prescribed tidal work refer to

Guide 24.

If you answered "YES" to Q12, the application

triggers referral to the Port Authority.

_ Tha Pont Authority is a concurrence agency if the

development is —

* within 200m of a shipping channel or an entry
and exit shipping corridor for the port

© within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoil
grounds;

© within 1000m of a planned port facility identified
in aland use plan approved under the Transport
Infrastructure Act 1994,

In all other situation the Port Authority is an advice

agency.

Marinas

For more information refer to Guide 18. For
information about whether a marina is prescribed
fidat work refer to Guide 24. The local government
js the assessment manager for all prescribed tidal
work,

\f you answered “YES" to Q13, the application

triggers referral to Queensland Fire and Rescue
Service as an advice agency.

 

” Tidal works in strategic port land tidal
areas .

For more information refer to Guide 18.

Unless you answered ‘NO* to Q14, the relevant Port
Authority is the assessment A manager for fe
application and the E1 Pr

Agency (EPA) and Queensland Transoon ‘an are
concurrence agencies for the application,

 

Heritage
For further information refer to Guide 19.

If you answered “YES" to Q15, the application
triggers referral to the Queensland Heritage Council

@8 concurrence agency for the application.

12.

13.

15.

(DAS Assessment Checklist, Version 18.0, 10 November 2006
Does the application involve development below high water mark’? and within the limits of a port
under the Transport Infrastructure Act 1994?

Xe)

[DYES - complete Part M of Form 1, of Part P of Form 1 if the work is prescribed tidal work

Does the application involve operational work that is tidal work for a marina?° with more than 6
vessel berths?

INO

(71 YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work

Does the application involve tidal works within a strategic port land tidal area"?
EI No

(7 YES - complete Part M of Form 1

Does the application involve development in a heritage registered place as defined under the
Queensland Hentage Act 1992?

No"
(YES - complete Part C of Form 1

 

 

Declared catchment areas 16. The application is in an area declared to be a catchment area under the Water Act 2000 and
For more information, including a list of the declared involves: (tick the applicable box/es)

catchment areas within Queensland, refer to Guide 7 . . . og

3. Oi) reconfiguring a lot if any lot resulting from the reconfiguration is less than 16 hectares;
Untess you answered “none of the above" to 16, (ii) development assessable against the planning scheme involving the establishment or
the application requires assessment by the . . " ‘
Depariment of Natura! Resources Mines and Water expansion of a waste water disposal system, other than a disposal system for carrying
(NRMW). out an environmentally relevant activity under the Environmental Protection Act 1994;
If an agency other than NRMW is the assessment TI ii:

manager for the application, NRMW is a (ili) none of the above

concurrence agency for the application in relation to

this matter.

Contaminated land 17. The application involves: (tick the applicable box/es)

Applications involving material change of use and/
of reconfiguring a lot may trigger this referral.

For more information refer to Guide 5.

Unless you answered “none of the above” to Q17,
the application requires assessment by the
Environmental Protection Agency (EPA). If an
agency other than EPA is the assessment manager
for the application, EPA will be a concurrence
agency for the application in relation to this matter.

 

DD (i) reconfiguring a tot for which all of part of the premises are —
(a) premises mentioned in the IPA, schedule 8, part 1, table 2 -—
« item 5, including the exemption otherwise provided for by paragraph (d);
« item 6, including the exemption otherwise provided for by paragraph (e); or
« item 7, including the exemption otherwise provided for a mining activity or petroleum
activity; or
(b) in an area for which an area management advice has been given for unexploded
ordnance - complete Part N of Form 1
KX (ii) a material change of use -
(a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or

(b) assessable against the planning scheme and if all or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1

(iil) none of the above

 

19 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
20 Marina is defined in the Transport Operations (Maritime Pollution) Regulation 1995.
21 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land.

Page 5

Page 13

INTEGRATED PLANNING ACT 1997

Electricity infrastructure

For more Information refer to schedule 2of the [P
lation.

Untess you answered ‘none of the above" to Q18,
the application triggers referral to the agency to
which the easement is aranied in favour of as advice
agency.

Land designated for community
infrastructure

Applications involving development on land
designated for community infrastructure may trigger
this referral.

For more information refer to schedule 2 of the IP
Regulation.

Ifyou answered “YES” to 019, the application
requires assessment by the chief executive of the
department administering the Act authorising the
development for the designated purpose.

If an agency other than the designator is the
assessmant manager for the application, the
designating agency will be a concurrence agency for
the application in relation to this mattar.

 

IDAS Assessment Checklist, Version 18.0, 10 November 2006

18. The application involves: (tick the applicable boxes)

Ow

O (i)

O iii)

OW)

reconfiguring a fot where any part of the lot is -

+ subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994 and the easement is for a transmission grid or supply network under

that Act; or

« situated within 100m of a substation site;
a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if -
« any part of the premises is subject to an easement in favour of a distribution entity or

transmission entity under the Electricity Act 1994 and the easement is for a transmission

grid or supply network under that Act; and

located wholly or partly in the easement;

a material change of use, assessable against a planning scheme and not associated

with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site;
operational work that is filling or excavation assessable against the planning scheme,
not associated with reconfiguring a lot, if - /
« any part of the premises is subject to an easement in favour of a distribution entity or

* any structure or work that is the natural and ordinary consequence of the use is, or will be,

transmission entity under the Electricity Act 1994 and the work is located wholly or partly in

the easement;

e the work is located wholly or partly within 10m of a substation site;

EX] (v)_ none of the above.

Does the application involve development assessable against the planning scheme and on land

designated for community infrastructure?

(i) intended to be supplied by a public sector entity; and
(ii) on land not owned by or on behalf of the State; and

(iii) other than development -
(a) for the designated purpose; or

(b) carried out by, or on behaif of, the designator.

No
Cl Yes

 

Page 6

Page 14

INTEGRATED PLANNING ACT 1997
SEQ Regional Plan

For more information refer to schedule 2 of the 1P
Regulation.

Refer to Chapter 2, part SA and schedule 10 of the
integrated Planning Act 1997, and schedule 2 of the
Regulatory Provisions for relevant definitions.
Unless you answered “none af the above" to Q20,
the application requires assessment by the Office of
Urban Management (OUM).

IDAS Assessment Checklist, Version 18.0, 10 November 2006
20. The application involves (tick applicable box/es) -
C1 (i) amaterial change of use of premises -
{a) ina Major Development Area in the Urban Footprint for -
C1 () — anurban activity -
(C1 inan area included in a structure plan where the IPA, section 3.1.6
applies;
(1 inan area not included in a structure plan where -
« the IPA, section 3.1.6 applies to the application for the material change
of use; or
« the premises exceeds 10,000m2; or
the gross floor area (GFA) on the premises will exceed 10,000m2; or
+ impact assessment is required under the relevant planning scheme
(J (ii) intensive animal husbandry, or
© (ii) residential development involving a rural residential purpose

(b) in the Regional Landscape and Rural Production Area for -
(1 (i) anurban activity and not specified in section 2.4(2); or
C1 (ii) residential development involving a rural residential purpose and not
specified in section 2.6(2) ,
(c) in the Ruraf Living Area for an urban activity and not specified in section 2.8(2);

(d) in the Investigation Area for -
CJ (i) anurban activity and not specified in section 2.10(2);
C1) (ii) residential development involving a rural residential purpose and not
specified in section 2.12(2); or
C (ili). intensive animal husbandry

LC (ii) reconfiguring a lot-
On land in a Major Development Area in the Urban Footprint that is:
(a) not included in a structure plan; and
(b) not specified in section 3.1(2).
1 (iii) none of the above

 

Fisheries matters

For more information refar to schedule 2of the IP
ion.

Unless you answered "none of the above” to Q21,
the application requires assessment by the
Department of Primary Industries and Fisheries
(DPI&F), .

lf an agency other than OPI&F is the assessment
Manager for the application, OPI&F is a concurrence
agency for the application in relation to items (i) -
(iv) and an advice agency in relation to item (v). -

 

21. The application involves: (tick the applicable box/es)
C1 (i)_ an assessable material change of use for aquaculture - complete Part 0; of Fonn 1;

C1 (i) assessable operational work that is the construction or raising of a waterway barrier -
complete Part O3 of Form 1;

Oi iii) assessable operational work completely or partly within a declared fish habitat area-
complete Part O2 of Form 1,

Li (iv) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;

(J (v) development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area; :

(vi) none of the above.

 

Page?

Page 15

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 18.0, 10 November 2006

Integration of land use and public 22. The application involves: (tick the applicable box/es)—
transport : . . .
For ole informaton refer to Guide 23, schedule 8A (C1 (i) a material change of use assessable against the planning scheme for a purpose

of the IPA, & schadute 2 of the IP Regulation. mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
Unless you answered “none of the above’, the schedule,
application triggers referral to QT as a concurrence

agency. CO (ii) reconfiguring a lot—

(4 (a) ontand that is completely or partly within a public transport corridor, and the
total number of lots increases;

[1 (b) _ on land that is completely or partly within a future public transport corridor or
an airport's public safety area; :

[1 (ce) _ ontand that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;

(1 (d) for a residential purpose within the 25 ANEF contour for an airport;

(J (e) for a residential purpose resulting in 100 or more allotments.

O (ili) operationat work assessable against the planning scheme, but not associated with a
materia! change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that—

(1 (a) is completely or partly within a public transport corridor or a future public
transport corridor;
(J (b) will result in work that encroaches into an airport's operational airspace.

EX] (iv) none of the above.

 

Railway safety and efficiency 23. The application involves: (tick the applicable box/es)— Oo

Se er edale dot hoie Roat schedule BA Ot) a material change. of use assessable against the planning scheme for a purpose

Unless you answered ‘none of the above’, the mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that

application triggers referral to QT as a concurrence schedule.

agency. C1 (ii) reconfiguring a tot—

(1 (a) on land that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;

(J (b) — on tand that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater; , :

C1 (c) on land that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;

(1d) — on land that abuts rail corridor land, commercial corridor (and or future railway
land and an easement abutting the corridor or future railway land is created;

CJ (e) on land that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;

CI () for a residential purpose resulting in 100 or more allotments.

O (iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m3, on land that—

C1) {a) is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;

(J (b) _ is completely or partly within future railway land, or a railway tunnel easement;

(1 (ec) abuts rail corridor land, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary.

EX] (iv) none of the above.

 

Moonie to Brisbane pipeline 24. The application involves the easement for the construction or operation of the Moonie to

For more information refer to schedule 2of the [P Brisbane strategic pipeline, and involves: (tick the applicable box/es}—

ves you anewered sone of the above’, the Oa material change of use assessable against the planning scheme and not associated
application triggers referral to the hotder of pipeline with reconfiguring a lot, and any structure or work will be located wholly or partly in the

licence No 1 issued under the Petroleum Act 1923, . easement.

currently Santos QNT Pty Ltd, for advice. oe 5
0 (ii) reconfiguring a tot
C1 (iii) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.
(iv) none of the above.

 

 

Page 8

Page 16

INTEGRATED PLANNING ACT 1997
Koala habitat area

For more information, refer to Guide 26 and
schedute 2 of the IP Regulation.

Unless you answered “none of the above", the
application requires referral to the Environmental
Protection Agency as a concurrence agency.

IDAS Assessment Checklist, Version 18.0, 10 November 2006

25. The application involves: (tick the applicable box/es)—

(1 @) a material change of use of premises in a koala conservation area or koala
sustainability area made assessable under a planning scheme, that is not for a domestic
activity and will result in - :

C{a)
Ot)

Oe
Oi)

Clee)
Of

clearing of native vegetation over an area greater than 2500m2;

a new building and any reasonably associated structure with a total footprint
greater than 1000m2,

an extension to an existing building and any reasonably associated structure if
the extension has a total footprint greater than 1000m?,

extracting gravel, rock or sand from an area greater than 5000m?;

excavating or filling an area greater than 5000m2;

additional traffic in a koala conservation area or koala sustainability area,
between 6p.m. on a day and 6a.m. on the following day.

D (ii) reconfiguring a fot in a koala conservation area or koala sustainability area that will
result in —

CI (a)
0 (b)

an increased number of lots;
clearing of native vegetation over an area greater than 2500m2.

D (ii) operational work in a koala conservation area or koala sustainability area made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a lot mentioned in (ii) above) that will result in the clearing of native vegetation
over an area greater than 2500m2.

C1 (iv) operational work in a koala conservation area or koala-sustainability area made
assessable under a planning scheme (not associated with a material change of use
mentioned in {i) or reconfiguring a lot mentioned in (ii) above) that is not for a domestic activity
and will result in -

Cl (a)
CZ (b)

clearing of native vegetation over an area greater than 2500m?;
extracting gravel, rock or sand from an area greater than 5000m2;

CJ (c) excavating or fiting an area greater than 5000m2,
EX] (v) none of the above.

 

Referral coordination

An information raquest requires referral coordination
if the apptication involves -
(i) 3 or more concurrence agencies; or
(ii) a facility or area assessable under a
planning schema and prescribed in
schedule? or 8 of the IP Regulation; or
(iii) development which is subject to an
application for preliminary approval
mentioned in $3.1.6 of the IPA.

For more information go to Guide? and Guide 6.

 

26. Does the application trigger referral coordination? - .

[YES, as the application: (tick the applicable boxes)

NO
Oi)
C1 (i)
Dit
Citi)

triggers 3 or more concurrence agencies;

involves a material change of use made assessable under a planning
scheme and prescribed in schedule 7 of the IP Regulation;

involves a material change of use (other than a dwelling house, outbuilding
or farm building) made assessable under a planning scheme, or
reconfiguring a lot, in an area prescribed in schedule 8 of the IP Regulation;

is for a preliminary approval mentioned in $3.1.6 of the IPA

 

Referral agency responses prior to
lodgement

Under $3.3.2 of IPA a refercal agency may give a
referral agency response on a matter within its
jurisdiction about a proposal before an application
for the proposal is made to the assessment
manager.

This is commonly the case where an application
fequires referrat to a building referral agency (eg.
Qld Fire and Rescue Service).

27. Did a referral agency give a referral agency response under s3.3.2 of the IPA before the
application was made to the assessment manager?

ENO

(21 YES - attach a copy of the referral agency/s response/s

 

 

 

PLEASE NOTE:

The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the

completed IDAS Assessment Checklist (if applicable).

 

OFFICE USE ONLY (applicable to assessment manager)

 

|

DATE RECEIVED

{REFERENCE NUMBERIS |

Page 9

Page 17

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 18.0, 10 November 2006

 

SECTION 2 - BUILDING REFERRALS (completion not mandatory)

Below is a list of the referrals that can apply to an application for building work assessable against the Building Regulation 2006. This section of the IDAS
Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checklist is not required to be completed and lodged with an
application for building work assessable against the Building Regulation 2006 only.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Special fire services - generally 1. An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
For more information go to schedule 2 table 1 and fequires special fire services mentioned in schedule 2A part 1 of the Integrated Planning Regulation 1998
schedule 2A of the IP Regulation. (IP Regulation) or includes an alternative solution assessed against the performance requirements of the
Assessment period 15 days. No response is a Building Code of Australia,
deemed refusal.
Fire safety for budget accommodation | 2. — An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
For move information go to schedule 2 of the [P. the subject of the application requires the installation of a fire safety system for a budget accommodation
Regulation building.
Spray painting 3. An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
For more information go to schedule 2 of the IP if the application involves a workplace incorporating spray painting.
Regutation
Retail meat premises 4. An application may trigger referral to Safe Food Qld as a concurrence agency if the application involves a
For more information go to schedute 2 of the IP retail meat premises.
Regulation
Private health facilities 5. An application may trigger referral to the Department of Health as a concurrence agency if the application
For more information go to schedule 2 of the IP involves a private health facitity.
Regulation .
Workplace area less than 2.3m? 6. An application may trigger referral to the Department of Industrial Relations (DIR) as an advice agency if the
For more infarmation go to schedule 2 of the IP application involves a work place area less that 2.3m?,
Regulation ®@
Land contiguous to a State-controlled|7. An application may trigger referral to the Department of Main Roads as a concurrence agency or advice
road agency if the application involves land contiguous to a State-controlled road.
For mora information go to schedule 2 of the IP.
Regulation
Pastoral workers accommodation 8. An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
For more information go to schedule 2 of the IP if the application involves pastoral workers accommodation.
Regutation
Child care centre 9. An application may trigger referral to the Department of Communities as a concurrence agency if the
For more information go to schedule 2 of the [P application involves a childcare centre.

ion
Coastal development 10. An application may trigger referral to the Environmental Protection Agency (EPA) as a concurrence agency,
For mor information goto schedule 2 ofthe [2 if the application involves land completely or partly seaward of a coastal building line22.
Heritage 11, An application may trigger referral to the Heritage Council as a concurrence agency if the application
For more information go to schedule 2 of the !P involves a heritage registered place.
Regulation .
Fisheries matters 12. An application may trigger referral to the Department of Primary Industries and Fisheries (DPI&F) as a
For more information go to schedule 2 of the IP concurrence agency if the application involves assessable building work in a declared fish habitat area; or
Regulation as an advice agency if the application involves assessable building work on land that adjoins a declared fish

habitat area.

Integration of land use and public 13, An application may trigger referral to Queensland Transport as a concurrence agency if the application ®
transport involves existing or future public transport corridors, or airport operational airspace?’
For more information go to schedule 2 of the IP
Regulation
Railway safety and efficiency 14, An application may trigger referral to Queensland Transport as a concurrence agency if the application
For more information go to schedule 2 of the {P involves future railway land.
Regulation

 

 

 

NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS

The local government, as the concurrence agency, is required to assess and provide a response for the following building applications within a prescribed
time. For applications relating to design and siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is 5 days. For all
other applications the assessment period is 15 days. If no response is received from the local government for an application, it is taken to be a deemed
tefusal. However for amenity and aesthetics impact of particular building work for a single detached class 1a or class 10 building or structure (15), no
tesponse is taken to be a deemed approval.

 

 

Amenity and aesthetic impact of 15. An application will trigger a referral to the local goverment if it is :

particular building work for single © fora single detached class 1 building or class 10 structure; and

detached class 1 building or class 10 the local government has declared by resolution the following:

building or structure — the appearance of the building or structure will have an extremely adverse impact on the amenity of
For more information go to schedule 2 table 1 of the the locality; and

[PRequtation. — the appearance of the building or structure would be in extreme conflict with the character of the
Assessment period 15 days. No response is a locality.

deemed approval, .

 

 

 

 

2 Coastal building lines are praser the Coastal Protection end Management Act 1995,
2 Operational airspace is as defined in State Planning Policy 1402 "Development in the Vicinity of Certain Airports and Aviation Facilities".
Page 10

Page 18

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 18.0, 10 November 2006

 

 

 

 

 

 

 

 

Whether particular buildings maybe | 16. An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a

occupied for residential purposes referral to the local government as the concurrence agency.

For more information go to schedule 2 table 1 of the

IP Regulation.

Assessment period 15 days. No response is a

deemed refusal.

Design and siting 17. An application may trigger referral to the local government as the concurrence agency if the building work

For more information go to schedule 2 table 1 of the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.

IP Requtation. 18. An application may trigger referral to the local goverment as the concurrence agency if the building work

Assessment period § days. No response is a does not comply with the qualitative statement for building clearance and site cover.

deemed refusal 19. An application may trigger referral to the local gavemment as the concurrence agency if the building work
does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
Development Code, patt 11 or 12.

Fire safety in particular budget 20. An application may trigger referral to the local government as the concurrence agency to determine the

accommodation buildings building will comply with the fire safety standard under the Building Act 1975 when the builcing w work has

For mare information go to schedute 2 table 1 of the been completed.

IP Regutatian,

Assessment period 15 days. No response is a

deemed refusal.

Higher risk personal appearance 21. An application may trigger referral to the local govemment as the concurrence agency fo determine if the

services building work

For more information go to schedute 2 table 1 of the « complies with the performance criteria of the Queensland Development code part 15; and

IP Regulation and the QDC part 15. e the work does not comply with an acceptable solution stated in the part.

Assessment period 15 days. No response is a . .

deemed refusal).

Building work for residential service | 22. An application for building work for premises in which residential care service under the Residential

For more information go to schedule 2 table 1 of the Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger

IP Reguiation and the QDC part 20. referral to the local government as the concurrence agency.

Assessment period 15 days. No responseis a . :

deemed refusal.

Building work for removal or 23. An application for the removat and/or rebuilding at another site of a building or other structure, will trigger

rebuilding referral to the local government as the concurrence agency.

For mare information go to schedule 2 table 1 of the

IP Regulation.

Assessment period § days. No response is a

deemed refusal.

Building work for rainwater tank in 24, An application may trigger referral to the local government as the concurrence agency to determine if the

designated rainwater tank area

For mora information go to schedule 2 table 1 of the
IP Requlation and the QDC part 25.

Assessment period 15 days. No response is a
deemed refusal.

 

building work or structure complies with the relevant performance criteria if -

» Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
building work, in a designated rainwater tank area; and

e Under the Queensland Development Code, part 25, the rainwater tank does not include an acceptable
solution for a relevant performance criteria.

 

Page 11

 

Page 19

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 17.1, 30 October 2006

 
   

Form 1 Development Application

IDAS Assessment
Checklist ~~”

(Formerly the “Referrals Checklist”) Z

fi
IMPORTANT NOTE FOR ALL APPLICANTS: 5”
pplication o1

1. This checklist was formerly referred to as the “Referrals Checklist’. Some of the ‘Guides’ to using the ID, fms continue to
“Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately deScribe its function.

2, -Under the IPA and IDAS framework, an application may require assessment by the local Council arfd/or certain Queensland State.efttities (e.g. Environmental Protection
fessment by a Queensland Staté entity and may also assist the applicant to

 
    

 
 
  
   
 

r to this document as the

Agency, Dept. of Natural Resources, Mines and Water, Queensland Heritage Council etc.).

3. This checklist is provided to assist applicants to determine when an application requires
determine the assessment manager' for the application.

4, Therefore, the completion of alt questions in section 1 of this checklist is mandatofy for all applications (other théh those requiring the completion of Parts A & B only).

5. Iti the responsibility of the applicant to accurately complete this checklist. Oo

6. Depending cn the nature of the application, an applicable State entity may be either the assessment mariager or an IDAS referral agency for the application.

7.

The assessment manager for the application will rely on the information provided in this checklist (as welt as any material lodged in support of the application) to identify
any applicable referral agencies for the application in the Acknowledgement Notice, The assessment manager will also rely on this information when identifying if the
application triggers referral coordination?.

8. — Toassist you in answering the following questions a series of guides are available free from the IPA website www.ipa.qid.gov.au, Guide 25 explains the rote of the IDAS
Assessment Checklist in the IOAS application process, and its relationship to the Form 1 development application.

9. — Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
www jpa.qld.gov.au.
10. Section 2 on page 10 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006.

SECTION 1 - STATE ASSESSMENT (completion mandatory)

Note: The following state assessment triggers apply to development other than for building work assessable against the Building Regulation 2006.

Environmentally relevant activity
For more information refer to Guide 4.

Untess you answered “none of the above" to Q1, the
application requires assessment by the

. The application involves: (tick applicable box/es)
(1 (i) an environmentally relevant activity (ERA) for which a code for environmental compliance
has not been made - complete Part G of Form 1

administering authority’, Oi (ii) a mobile or temporary ERA for which a code of environmental compliance has not been
If an entity, other than the administering authority, is made - complete Part G of Form 1

the assessment manager for the application, the aes

administering authority is a concurrence agency for x (iil) none of the above

the application in relation to this matter.

Note: An application invotving ERA 19 and/or 20 will
also require completion of Part K7 of Form 1 for
approval where an allocation under the Water Act

 

 

2000 is required.

State-controlied road matters 2. The application involves: (tick applicable box/es)

esos aeaat Nanette o2.the (1 (i) development on land contiguous to a State controlled road and for -

apoteation roe teferal fo the _Desarmentof (1 (@) material change of use assessable against the planning scheme;

tn certain circumstances DMR will be an advice C1 (b) reconfiguring a fot unless -

agency, while in other circumstances DMR wil be a « the total number of lots is not increased; and

tmte oath > Raglan will assist you to « the total number of lots abutting the State-controiled road is not increased;
determine where OMR is an advice or concurrenca CO (©) operational work (not associated with a material change of use assessable against the

agency for the application. planning scheme or reconfiguring a fot mentioned in (b) above)—

* associated with access to a State-controlled road; or

© for filling or excavation; or

+ involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm that directs stormwater to a
State-controlled road.

 

 

1 The assessment manager is responsible for assessing and deciding an IDAS application. The assessment manager for an application is prescribed in schedule 8A of the IPA.

2 For additional information refer to Guide 6 ‘Doas my application trigger the referral coordination process?”

3 The ‘administering authority’ may be either the Environmental Protection Agency, the relevant local government (for a devolved ERA) or the Queenstand Department of Primary Industries and
Fisheries {for a delegated ERA).

4 Land contiguous to a State-centrolled road is defined in schedule 14 of the !P Regulation to meen land - if part of the land is within 100m of the State-controlled road; or that is part of a future State-
controled road.

Page 1

Page 20

INTEGRATED PLANNING ACT 1997
State-controlled road matters (cont)

IDAS Assessment Checidist, Version 17.1, 30 October 2006
LJ (i) development on land not contiguous to a State-controlled road and -
(1 @) material change of use ~
« assessable against the local government's planning scheme; and
¢ mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
(J (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
(1 (0) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)—
« assessable against the local government's planning scheme; and

* mentioned in schedule § of the IP Regulation and exceeding the thresholds set by
that schedule.

1 (ili) none of the above

 

Clearing vegetation

For more information refer to Guide 12.

Unless you answered “none of the above” to Q3, the
application requires assessment by the Department
of Naturat Resources Mines and Water (NRMW).

If an agency other than NRMW is the assessment
manager for the application, NRMW is a
concurrence agency for the application in relation to
this matter.

If you ticked Q3{i) or (ii), your application requires
referral to NRMW for assessment regardless of
whether vegetation clearing is propased or nat.

The application involves: (tick applicable boxes)
CA (i) material change of use -
(a) assessable against the planning scheme;
(6) on a lot containing -
* acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
¢ ifthere is no property map of assessable vegetation for the lot - remnant vegetation;
(c) where the existing use of the land is a rural or environmental use; and @
(d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
(ii) reconfiguring a lot —
(a) on alot containing a category 1, 2 or 3 area shown on a property map of

assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;

(b) where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
Dili) operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
{d) not associated with a material change of use assessable against the planning

scheme mentioned in (i) or reconfiguring a fot mentioned in (ii) - complete Part J of
Form 1

EX] (iv) none of the above.

 

Strategic port land

For more information refer ta Guide 11.

Ifyou ticked (f) - the relevant Port Authority is the
assessment manager for the application.

If you ticked (li) Queensland Transport is a
concurrence agency for the application.

The application involves:
LJ (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
Act) - complete Part | of Form 1 e

C1 (ii) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part ! of Form 1

(iii) none of the above

 

Acid sulfate soils

For more information refer to Guide 10.

Unless you answered "none of the above" to Q5, the
application requires assessment by Department of
Natural Resources Mines and Water (NRMW).

if an agency other than NRMW is the assessment
manager for the application, NRMW is an advice
agency for the application in relation to this matter.

 

 

The application involves development on land situated in an identified> jocal government area

and where the surface of the land is: (tick applicable box)

C1 (i) below 20m AHD® and the development will involve the excavation of 1000m3 or more of
soil or sediment at or below 5m AHD, or

LU (ii) at or below 5m AHD and the development will involve filling the site with 1000m? or more
of material

XI (iii) none of the above

 

5. The identified local government areas are: Aurukun, Bawen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook,

Cootoola, Dounalas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vaie, Momington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.

6 Australian Height Datum (AHD).

Page 2

Page 21

INTEGRATED PLANNING ACT 1897

Major hazard facilities or possible 6.

major hazard facilities

For more information refer to Guide 17.

Ifyou answered "YES" to O6, the application
requires assessment by the Department of
Emenency Services (DES).

(fan agency other than DES is the assessment
manager for the application, DES is a concurrence
‘agency for the application in relation io this matter.

IDAS Assessment Checklist, Version 17.1, 30 October 2006
Does the application involve a material change of use for a major hazard facility or possible
major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?

JNO

(DYES - complete Part L of Form 1

 

 

Water related development under the | 7.

Water Act 2000

For mora information about items (a) - (d), refer to
Guide 15. For more information about item (e),
fefer to Guide 14 Does my application involve
assessment of a referable dam?

Untess you answered ‘none of the above’ to Q7, the
application requires assessment by the Department
of Natural Resources Mines and Water (NRW).

If an agency other than NRMW is the assessment
manager for the application, NRMW is 2
concurrence agency for the application In relation to
this matter.

The application involves:
(1 (i) operational work, for taking or interfering with water under the Water Act 2000, that is:
(tick applicable box/es)
C1 (a) ina watercourse, lake or spring, or from a dam constructed on a watercourse (eg.
a pump, gravity diversion, stream re-direction, weir or dam) - complete Part Kz, Ks, Ke, Ke, or Ko of
Form 1 whichever is applicable;
(2 (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
Kt of Form 1;
C1 (c) for a subartesian bore, in declared groundwater area’, for use for purposes other
than stock and/or domestic use - complete Part K: of Form 1;
(1 (a) for a subartesian bore, in certain declared groundwater area, for use for stock
and/or domestic purposes - complete Part K: of Form 1;
Ce) for constructing a referable dam® or that will increase the storage capacity of a
referable dam by more than 10% - complete Part Ks of Form 1; or
(J (f) for taking or interfering with overland flow water - complete Parts Ka and G of Form 1

XX] (ii) none of the above.

 

 

Removal of quarry material from a 8.

watercourse
For more information refer to Guide 16,

Ifyou answered "YES" to Q8, the application
Tequires assessment by the Department of Natural
Min Water (NRMW).
If an agency other than NRMW is the assessment
manager for the application, NRMW is a
concurrence agency for the application in relation to
this matter.
Note: Part G of Form 1 is required to be completed
as the activity of removing quarry material from a
watercourse is also an Environmentally Relevant
Activity (ERA),

 

Does the application involve development for the removal of quarry material from a watercourse?
fequiring an allocation notice under the Water Act 2000?

KJ NO

(J YES - compiete Parts Kr and G of Form 1

 

7 The declared ground water areas are listed in Guide 13 Devefopmant in a declared catchment area.

8 Referable dam is defined under the Water Act 2000.
9 Watercourse is defined in sch 10 of the IPA.

Page 3

Page 22

INTEGRATED PLANNING ACT 4997

Operational works in a tidal area or
coastal management district

For more information refer ta Guide 18. For more
information about prescribed tidal work in local
goverment tidal areas refer to Guide 24.

Unless you answered “none of the above" to Q9, the
application requires assessment by the
Environmental Protection Agency (EPA).

It an agency other than EPA is the assessment
manager for the appfication, EPA is a concurrence
agency for the application In relation to this matter.
Local government is the assessment manager for ail
prescribed tidal work.

9.

Ow

D iii)
Diiii

IDAS Assessment Checklist, Version 17.1, 30 October 2008
The application involves operational work that is: (tick the applicable box/es)

tidal work'® as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; Or

tidal work that is prescribed tidal work" other than in a canal’ -complete Part P of Form 1; OF
carried out within a coastal management district under the Coastal Act and for - complete

Part M of Form 1 if any box/es (a) to (i) below are ticked.

O@

C1 (b)
Oo
Od)
Oe)
Of
O@)

Oh)
Ovi

constructing or installing works in a watercourse between MHWS and HAT (ie.
other than those works in tidal water) where the development has been determined not
to be assessable against the Water Act 2000 ;

constructing a canal’? intended to be connected to tidal waters;

constructing an artificial waterway;
reclaiming land under tidal water;

disposing of dredge spoil or other solid waste material in tidal water;
interfering with quarry material on State coastal land above high-water mark;
draining or allowing drainage or flow of water or other matter across State

coastal land above high-water mark;

removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;

constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or

(iv) none of the above.

 

Operational work below high water
mark

For more information refer to Guide 18. For more
information about prescribed tidal work in locad
government tidal areas refer ta Guide 24.

Unless you answered "none of the above" to Q10,
the application triggers referral to Queensland

Transport (QT) (Maritime Safety Qld) as a
concurrence agency.

Local government is the assessment manager for ail
prescribed tidal work.

10. The application involves operational work that is: ( tick the applicable box/es)

CA (i) tidal work"? as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; oF

CO (ii) tidal work that is prescribed tidal work"4 - complete Part P of Form 1; OF
U (iii) carried out within a coastal management district'S under the Coastal Act and for -
disposing of dredge spoil or other solid waste material in tidal water - complete Part

Oa)

O()
Oe

Mof Form 1;

teclaiming land under tidal water - complete Part M of Form 1; of
constructing a canal'®, if the canal is associated with reconfiguring a lot - complete

Part M of Form 1;

(iv) none of the above.

 

Coastal management

For more information refer to Guide 18.

Unless you answered “none of the above" to Qi1,
the application requires assessment by the
Environmental Protection Agency (EPA).

If an agency other than EPA is the assessment

manager for the application, EPA is a concurrence
agency for the application in relation ta this matter.

 

 

11.

The application involves: (tick the applicable box/es)

Ot
O (ii)

Di iii)
Ov)
(v)

a material change of use assessable under a planning scheme involving operational
work carried out completely or partly in a coastal management district'®

a material change of use assessable under a planning scheme involving building
work, carried out completely or partly in a coastal management district that is -

« the construction of a new premises with a GFA" of at least 1000m?

« the enlargement of the GFA of existing premises by more than 1000m?

reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district

reconfiguring a lot'® assessable under schedule 8 of the IPA and in connection with
the construction of a canal'® — complete Part M of Fonn 1

none of the above

 

10 Tidal work is defined in sch 10 of the IPA.

11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tdal area.

12 Canal means canal as defined under the Coasta! Protection and Management Act 1995

13 Tidal work is defined in sch 10 of the IPA.

14 Prescribed tidal work is defined in the Coastat Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area,
15 Coastal management district is defined in sch 10 of the IPA and means a coastat management disvict under the Coastal Protection and Management Act 1995, other than an area declared as a

coastal management district under section 47(2) of that Act
16 Canaj means canal as defined under the Coastal Protection and Management Act 1995

17 GFA is defined in sch 14 of the IPA to mean the gross floor area.

For a definition

Gf how io caiculaiad GFA, go to ihe pianning scheme against which the application is being assessed.
18 Under $117 of the Coasta! Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be

accompanied by the application for the operational works to construct the artificial waterway.

Page 4

Page 23

INTEGRATED PLANNING ACT 1997

Development within the limits of a

port

For more information refer to Guide 18. For

information about prescribed tidal work refer to

Guide 24.

Ifyou answered "YES" fo Q12, the application

tggers referral to the Port Authority.

The Port Authority is a concurrence agency if the

development is -

= within 200m of a shipping channel or an entry
and exit shipping corridor for the port

«within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoil
grounds;

© within 100m of a planned port facility identified
in a land use plan approved under the Transport
Infrastructure Act 1994.

tn all other situation the Port Authority is an advice
agency.

12.

IDAS Assessment Checklist, Version 17.1, 30 October 2006
Does the application involve development below high water mark’? and within the limits of a port
under the Transport infrastructure Act 1994?

KINO

[DYES ~ complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work

 

Marinas

For more information refer to Guide 18. For
information about whether a marina is prescribed
tidal work refer to Guide 24. The local government
is the assessment manager for all prescribed tidal
work.

tfyou answered "YES" to Q13, the application
triggers referral to Queensland Fire and Rescue
Service as an advice agency.

13.

Does the application involve operational work that is tidal work for a marina” with more than 6
vessel berths?

J No

(C1 YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work

 

Tidai works in strategic port land tidal
areas

For more information refer to Guide 18.

Unless you answered “NO” to Q14, the relevant Port
Authority is the assessment manager for the
application and the Environmentat Protection

Agency (EPA) and Queensland Transport (QT) are
concurrence agencies for the application.

Heritage
For further information refer to Guide 19.

Ifyou answered "YES" to Q15, the application
triggers referral to the Queensland Heritage Council

as concurrence. agency for the application.

Declared catchment areas

For mora information, including a list of the deciared
catchment areas within Queensland, refer to Guide
13,

Unless you answered "none of the above” to Q16,
the application requires assessment by the
Department of Natural Resources Mines and Water
(NRMW),

(fan agency other than NRMW is the assessment
manager for the application, NRMW is a
concurrence agency for the application in relation to
this matter.

15.

16.

Does the application involve tidal works within a strategic port land tidal area2"?
No
(C1 YES - complete Part M of Form 1

Does the application involve development in a heritage registered place as defined under the
Queensland Heritage Act 1992?

x] NO
(C1 YES - complete Part C of Form 1

The application is in an area declared to be a catchment area under the Water Act 2000 and
involves: (tick the applicable box/es)

O(i) reconfiguring a lot, if any lot resulting from the reconfiguration is less than 16 hectares;

C1 (ii) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994,

KX (iii) none of the above

 

Contaminated land

Applications involving material change of use and/
of reconfiguring a lot may trigger this referral.

For more information refer to Guide 5.

Unless you answered “none of the above" to Q17,
the application requires assessment by the
Environmental Protection Agency {EPA). If an
agency other than EPA is the assessment manager
for the application, EPA wil be a concurrence
agency for the application in relation to this matter.

 

17.

The application involves: (tick the applicable box/es)

(1 (i) reconfiguring a lot for which all of part of the premises are -
(a) premises mentioned in the IPA, schedule 8, part 1, table 2 ~
¢ item 5, including the exemption otherwise provided for by paragraph (d);
« item 6, including the exemption otherwise provided for by paragraph (e); or
¢ item 7, including the exemption otherwise provided for a mining activity or petroleum
activity; or
in an area for which an area management advice has been given for unexploded
ordnance - complete Part N of Form 1
Ci (ii) a material change of use -
(a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if all or part of the premises is in an area

for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1

1 (iii) none of the above

(b)

 

49 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
20 Marina is defined in the Transport Operations (Maritime Pollution) Reguiation 1995,
21 Strategic part land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land.

Page 5

Page 24

INTEGRATED PLANNING ACT 1997

Electricity infrastructure

For more information refer to schedule 2of the IP
lation.

Unless you answered "none of the above” to Q18,
the application triggers referral to the agency to
which the easement is granted in favour of as advice
agency.

18.

IDAS Assessment Checklist, Version 17,1, 30 October 2006
The application involves: (tick the applicable box/es)

(J (i) reconfiguring a fot where any part of the lot is —

subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or

« situated within 100m of a substation site;

a material change of use, assessable against a planning scheme and not associated

with reconfiguring a lot if -

« any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and

any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;

a material change of use, assessable against a planning scheme and not associated

with reconfiguring a lot if any part of the premises is situated within 100m of a substation

site;

C1 (iv) operational work that is filling or excavation assessable against the planning scheme,

not associated with reconfiguring a lot, if -

any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;

the work is located wholly or partly within 10m of a substation site;

EX] (v)_ none of the above.

Dit)

Dit)

 

 

Land designated for community
infrastructure

Applications involving development on land
designated for community infrastructure may tigger
this referrat.

For more information refer to schedule 2 of the IP
Regulation,

If you answered “YES" to Q19, the application
requires assessment by the chief executive of the
department administering the Act authorising the
development for the designated purpose,

if an agency other than the designator is the
assessment manager for the application, the
designating agency will be a concurrence agency for
the application in relation to this matter.

Does the application involve development assessable against the planning scheme and on land
designated for community infrastructure?

(i) intended to be supplied by a public sector entity; and
(ii) on land not owned by or on behalf of the State; and
(iii) other than development —

(a) for the designated purpose; or

(b) carried out by, or on behalf of, the designator.
KINO
CI YEes

 

SEQ Regional Plan

For more information refer to schedule 2 of the IP
Reaulation,

Unless you answered “none of the above" to Q20,
the application requires assessment by tha Office of
Urban Management (OUM).

 

20.

The application involves a material change of use of premises in the SEQ Region”? for: (tick
applicable box/es)
(i) urban activities23, other than where the premises are zoned for an urban purpose
under an {PA planning scheme; or the activity is outdoor recreation, in the -
(a) Regional Landscape and Rural Production Area; or
(b) Rural Living Area; or
(c) Investigation Area;
tural residential purposes where the premises are not zoned for rural residential
purposes and the premises are in the -
(a) Regional Landscape and Rural Production Area; or
(b) Investigation Area.
urban activities in major development areas, other than where a structure plan for the

site has been approved by the regional planning Minister or the activity is outdoor
recreation, where —

(a) The relevant planning scheme requires impact assessment for the activity; or
(b} The development proposal has a site coverage of one hectare or greater.

{XI (iv) none of the above

a)

D iii)

 

22 Loca! Governments within tha SEQ Region are identified in the South East Queensland Regional! Plan as Beaudesert Shire, Boonah Shire, Brisbane City, Caboolture Shire, Caloundra City, Esk Shire,

Gatton Shire, Gold Coast City, Ipswich City, Kilooy Shit
23 ‘Urban activity means urban activity 2¢ defined in sch

 
 

Laidley Shire, Logan City, Maroochy Shire, Noosa Shire, Pine Rivers Shire, Redcliffe City, Redland Shire and Toowoomba City.

2, Part H Ragulatory Provisions, South East Queensiand Regional Pian. The term includes some facilities and purposes and excludes soma

purposes. A single residential dwelling on a lot is not included in urban activity.
24 Rural residential purpose means rural residential purpose as defined in schedule 2, Part H Regutatory Provisions, South East Queensland Regional Plan.

Page 6

Page 25

INTEGRATED PLANNING ACT 1997
Fisheries matters

For more information refer to schedule 2of the IP
Reguiation.

Unless you answered ‘none of the above” to 021,
the application requires assessment by the
Department of Primary Industries and Fisheries
(OP IBF).

If an agency other than OPI&F is the assessment
manages for the application, DPI&F is a concurrence
agency for the application in celation to items (1) -
(iv) and an advica agency in relation fo item {v),

IDAS Assessment Checklist, Version 17.1, 30 October 2006

The application involves: (tick the applicable box/es)

CI(i) anassessable material change of use for aquaculture - complete Part 0: of Form 1;

O (ii) assessable operational work that is the construction or raising of a waterway barrier -
complete Part Os of Form 1;

LD (iii) assessable operational work completely or partly within a declared fish habitat area-
complete Part O2 of Form ;

Li {iv) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;

(J (¥) development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area;

(vi) none of the above.

21.

 

 

Integration of land use and public
transport

For more information refer to Guide 23, schedule 8A
of the IPA, & schedule 2 of the IP Regulation.
Unless you answered "none of the above’, the
application triggers referral to QT as a concurrence
agency.

 

Railway safety and efficiency

For more information refer to Guide 23, schedute 8A
of the IPA & scheduls 2 of the IP Regulation.

Untess you answered “none of the above’, the
application triggers referral to QT as aconcurrence
agency,

22. The application involves: (tick the applicable box/es)—
LC (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule.

C1 (ii) reconfiguring a fot—

(1 (@) _ onland that is completely or partly within a public transport corridor, and the
total number of lots increases;

(J (») on land that is completely or partly within a future public transport corridor or
an airport's public safety area;

CJ (c) _ onland that is within 400m of a public passenger transport facility or a future

public passenger transport facility, and the total site area is 5000m? or greater;
(1 @ _ for a residential purpose within the 25 ANEF contour for an airport;
(Je) _ fora residential purpose resulting in 100 or more allotments.

LD iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that—

(J (a) __ is completely or partly within a public transport corridor or a future public
transport corridor;
(1 (b) _ will result in work that encroaches into an airport's operational airspace.

EX] (iv) none of the above.

23, The application involves: (tick the applicable box/es)—
(7 (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedule.

C1 (ii) reconfiguring a lot—

O(a) onland that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;

C1 (b) on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater;

(J (c) | ontand that abuts rail corridor and, commercial corridor land or future railway
land, and the total number of lots increases;

(1 (4) onland that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;

CJ (e) on land that is completely or partly within 100m of, and abutting an approach
to, a railway {evel crossing, and the total number of lots increases;

(A (f) for a residential purpose resulting in 100 or more allotments.

C (ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m3, on land that—

 

CJ (a) __ is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
{J (b) is completely or partly within future railway land, or a railway tunnel easement;
CJ (c) abuts rail corridor land, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary.
{iv) none of the above.

 

Page7

Page 26

INTEGRATED PLANNING ACT 1997
Moonie to Brisbane pipeline

For more information refer to schedule 2of the IP
Regulation.

Unless you answered ‘none of the above", the
application triggers referral to the holder of pipeline

licence No 1 issued under the Petroleum Act 1923,
currently Santos QNT Pty Ltd, for advice.

24. The application involves the easement for the construction or operation of the Moonie to
Brisbane strategic pipeline, and involves: (tick the applicable bax/es)—
CO (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the

(I (iii) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the

IOAS Assessment Checklist, Version 17.1, 30 October 2006

easement.
CO (ii) reconfiguring a fot

work is located wholly or partly in the easement.
(iv) none of the above.

 

Koala habitat area
For more information, refer to Guide 26 and
schedule 2 of the IP Regulation.

Unless you answerad ‘none of the above’, the
application requires referral to the Environmental
Protection Agency as a concurrence agency.

25. The application involves: (tick the applicable box/es)—

C (i) a material change of use of premises in a koala conservation area or koala
sustainability area made assessable under a planning scheme, that is not for a domestic

CO (iv) operational work in a koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with a material change of use
mentioned in (i) or reconfiguring a fot mentioned in (ii) above) that is not for a domestic activity

activity and will result in -

Ol)
OO)

Ol)
O@)

Oe)
oO

clearing of native vegetation over an area greater than 2500m?;

a new building and any reasonably associated structure with a total footprint
greater than 1000m2,

an extension to an existing building and any reasonably associated structure if
the extension has a total footprint greater than 1000m?;

extracting gravel, rock or sand from an area greater than 5000m2;

excavating or filling an area greater than 5000m2;

additional traffic in a koala conservation area or koala sustainability area,
between 6p.m. on a day and 6a.m. on the following day.

CO (ii) reconfiguring a fot in a koala conservation area or koala sustainability area that will

result in -
(a) an increased number of lots;

(J (b) clearing of native vegetation over an area greater than 2500m2.

C (ii) operational work in a koala conservation area or koala sustainability area made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a lot mentioned in (ii) above) that will result in the clearing of native vegetation

over an area greater than 2500m?,

and will result in =

CL (a) clearing of native vegetation over an area greater than 2500m?;
C (b) extracting gravel, rock or sand from an area greater than 5000m?;
(J (c) excavating or filling an area greater than 5000m?,

BX (v) none of the above.

 

 

Referral coordination

An information request requires referral coordination
if the applicatian involves -
{i) 3 or mexe concurrence agencies; or
{li) a facility or area assessable under a
planning scheme and prescribed in
schedule? ar 8 of the IP Regulation; or
(iii), development which is subject to an
application for preliminary approval
mentioned in 53.1.6 of the IPA.

For more information go to Guide2 and Guide 6.

 

Referral agency responses prior to
lodgement

Under 83.3.2 of IPA a referral agency may give a
referral agency response on a matter within its
jurisdiction about a proposal before an application
for the proposal is made to the assessment
Manager.

This is commonly the case where an application
fequires referral to a buitding referral agency (eg.
Old Fire and Rescue Service).

PLEASE NOTE: The assessment manager may refuse to accept an anplic:

26. Does the application trigger referral coordination?

x] NO

(YES, as the application: (tick the applicable box/es)

27. Did a referral agency give a referral agency response under s3.3.2 of the IPA before the

Ot
Di

C1 di

Ot)

triggers 3 or more concurrence agencies;

involves a material change of use made assessable under a planning
scheme and prescribed in schedule 7 of the [P Regulation;

involves a material change of use (other than a dwelling house, outbuilding
or farm building) made assessable under a planning scheme, or
reconfiguring a fot, in an area prescribed in schedule 8 of the IP Regulation;

is for a preliminary approval mentioned in s3.1.6 of the IPA

application was made to the assessment manager?

[Xx] NO

(11 YES - attach a copy of the referral agency/s response/s

 

 

completed IDAS Assessment Checklist (if applicable).

Page &

time of lodgemeni, faiis to provide the

Page 27

&.

viv
v

urban
strategies

DEVELOPMENT CONSULTANTS
TOWN PLANNING.
URBAN DESIGN

» TOWN PLANNING REPORT

Application for Material Change of Use for
Visitor Accommodation Type 4 — Conventional (Motel)

224 — 228 David Low Way, Peregian Beach
Lot 78 on P9311 (part) & Lot 1 on RP152737

Prepared for
Raphill Pty Ltd

November 2006

SUNSHINE COAST

PO BOX 939 | 25 DUPORTH AVENUE URBAN STRATEGIES
MAROOCHYDORE 4558 | QUEENSLAND | AUSTRALIA [ SUNSHINE COAST ] PTY LTD
BRISBANE ACN 106 124 172 ABN 66 106 124 172

PO BOX 3368 | LEVEL |. 39 GREY STREET T 07-5443 9335 | F 07-5443 9885

SOUTH BRISBANE 4101 (| QUEENSLAND [| AUSTRALIA [email protected]

Page 28

URBAN STRATEGIES (SUNSHINE COAST) PTY LTO
TOWN PLANNING ASSESSMENT REPORT

 

CONTENTS

INTRODUCTION

1.1. Overview

1.2 Site Details

1.3. Development Application Details
1.4 Applicant Details

1.5 Background

PROPOSAL

SITE CHARACTERISTICS
3.1. Surrounding Land Use & Existing Built Form

LEGISLATIVE MATTERS

4.1. Application Process — Impact
4.2 Referral Co-ordination

4.3 Referral Agencies

STATE PLANNING MATTERS
5.1 South East Queensland Regional Plan
5.2 State Planning Policies

THE NOOSA PLAN

6.1 Eastern Beaches Locality

6.2 Overlays

6.3 Codes
6.3.1 Eastern Beaches Locality Code
6.3.2 Residential Uses Code
6.3.3. Visitor Accommodation Code

6.3.4 Landscaping Code
6.3.5 Engineering Works Codes

6.4 Alternative Solutions - Eastern Beaches Locality Code

CONCLUSION

C:\shared\WPPROJ\S060199\Planning Report - Motel 15Nov06.doc

ee er a

N

ooannuna A RA hp RR AE W &

Page 29

URBAN STRATEGIES (SUNSHINE COAST) PTY LTO v
TOWN PLANNING ASSESSMENT REPORT v

 

4. INTRODUCTION ]

1.1 Overview

This application has been prepared on behalf of Raphill Pty Ltd and seeks a Development
Permit for Material Change of Use of premises for the purpose of Visitor Accommodation
Type 4 — Conventional (Motel) at 224-228 David Low Way, Peregian Beach. The motel
comprises 12 motel units, reception and dining/entertainment area and managers unit, within
a ‘U’ shaped two storey building. The proposal generally complies with the Eastern Beaches
Locality Plan and applicable codes contained in The Noosa Pian.

The application is accompanied by the following:

= Town Planning Report prepared by Urban Strategies;

« Proposal plans A000, A001, A101-A103, A501, A502 and A601 dated 10/11/06
prepared by H2o0 Architects; and

» IDAS Form 1 — Parts A and D and Assessment Checklist.

1.2 Site Details

 

 

 

 

 

 

Address of Site . 224-228 David Low Way, Peregian Beach
Real property description | Lot 78 on P9311 (part) & Lot 1 on RP152737
Area of site 1,200m’

Zone Semi-attached Housing

Overlays “| Nil

‘Owner - , Raphill Pty Ltd

 

 

 

1.3 Development Application Details

 

 

 

Type of Development Code Assessment Impact Assessment
Preliminary Development Preliminary Development
. Approval Permit Approval y Permit
Material Change of Use xX

 

Reconfiguring a Lot
Operational Work

Building Work

Plumbing & Drainage Work

 

 

 

 

 

 

 

1.4 Applicant Details

Applicant Raphill Pty Ltd

C/- Urban Strategies (Sunshine Coast) Pty Ltd
PO Box 939 MAROOCHYDORE QLD 4558
Ph: 5443 9335 Fax: 5443 9885

Contact Person “| Scott Sobey / Samantha Cullen

Urban Strategies Reference | S06-0199

 

 

 

 

 

 

 

1.5 Background

In June 2006 Council issued a Negotiated Decision Notice granting a development permit for
lot reconfiguration over the site. The reconfiguration will see the common boundaries of the
subject lots and the adjoining lots to the south rearranged to create 2 x 600m? lots, plus one
large lot that has frontage to both David Low Way and Heron Street. The subject application

 

MATERIAL CHANGE OF USE - MOTEL 4
224-228 DAVID LOW WAY, PEREGIAN BEACH

Page 30

SB.

URBAN STRATEGIES (SUNSHINE COAST) PTY LTD wr
TOWN PLANNING ASSESSMENT REPORT v

 

relates to the 2 x 600m? lot areas approved with this reconfiguration. The Negotiated
Decision Notice also granted a Material Change of Use development permit for a mixed use
development on the Heron Street land known as ‘Peregian Boardwalk’. Construction of the
approved development has not yet commenced.

 

2. PROPOSAL i

This application seeks a Development Permit for Material Change of Use of land known as
224-228 David Low Way, Peregian Beach for the purpose of Visitor Accommodation type 4
— Conventional (Motel). The motel comprises 13 units, including 12 motel (accommodation)
units plus a managers (dwelling) unit.

The development will provide a two-storey building entity, with reception and dining/
entertainment area and carparking located on the ground level and motel and managers
units above. The reception and dining/entertainment area and managers unit are located at
the rear of the site, and two wings of motel units travel towards David Low Way to create a
‘u’ shaped building form that overlooks a central vehicle manoeuvring and landscaped area.

The units are accessed via stairs and a lift and interconnecting covered walkways. Each
motel unit contains a bedroom and bathroom. Laundry and kitchen facilities are not
proposed within the motel units. The managers unit however will be self contained. The
reception and dining area also provides an entertainment area, which opens out onto a
landscaped recreation area containing a pool.

The design incorporates a variety of building materials including rendered and painted
blockwork/precast; renderoc/precast parapets and screens; timber cladding, battens and
mullions; metal fascias; and zincalume roofing. Sections of pitched skillion roofing, together
with the designs horizontal and vertical articulation and use of a variety of building materials
results in character outcome compatible with the ‘Noosa style’ desired by Council and
consistent with the adjoining approved mixed use development.

Vehicles will access the site via a 6m wide crossover from David Low Way. A one way
internal driveway with a minimum width of 3.5m will access a total of 15 on site carparks,
including 12 undercover spaces and a disabled access space.

The development statistics are:

 

« Site area 1,200m? (1,169m? (Lot 1 on RP152737)
plus 31m, being part of Lot 78 on P9311)
« Gross floor area 553m? (46%)
* Site cover 480m? (40%)
= Population density 18.2 persons (13 x 1.4 (1 bed units))
= Building height 2 storeys / 8.0m
= On-site car parking spaces 15, including 1 disabled space
= Landscaped open space 240m? (20%) soft landscaping
MATERIAL CHANGE OF USE - MOTEL 2

224-228 DAVID LOW WAY, PEREGIAN BEACH

Page 31

URBAN STRATEGIES (SUNSHINE COAST) PTY LTD viv
TOWN PLANNING ASSESSMENT REPORT v

 

 

3._SITE CHARACTERISTICS }

 

The subject site comprises two allotments, located at 224 and 228 David Low Way,
Peregian Beach:

224 David Low Way (part) Lot 78 on P9311 604m?
228 David Low Way Lot 1 on RP152737 4,169m?

As indicated in section 1.5 above a development permit for the reconfiguration of the subject
site was approved by Council in June 2006. The proposed motel is located on lots 1 and 2
on the approved plan subdivision (Plan No S05-0123.1 prepared by Urban Strategies). The
combined area of proposed lots 1 and 2 is 1,200m?. The site has a frontage of 31m to
David Low Way and at its deepest point it is nearly 42m. The land has a gentle slope from
west to the east. David Low Way is fully constructed, with kerb and channel along the full
frontage. All necessary urban services are available to the site.

The allotments comprising the site are currently vacant and void of existing significant
vegetation. The site was previously occupied by a motel.

3.1 Surrounding Land Use & Existing Built Form

Surrounding uses are a mix of commercial and residential serving both the tourist and
resident community. The majority of existing commercial development is concentrated to
the south of the site, in the area bound by David Low Way, Herron Street, Kingfisher Drive
and Grebe Street. This area hosts a range shops, offices and cafes/restaurants. An
approved, but not yet constructed, mixed use development including shops, offices, medical
centres, restaurants and accommodation units adjoins the site to the south. The Peregian
Beach Hotel is located to the west, diagonally opposite on David Low Way.

 

Land to the north and west of the site is occupied by a range of residential uses including
detached houses, duplex dwellings, multiple dwellings and motels. Land to the east is
occupied by detached houses and units and a public carpark and beach access, and the
Peregian Beach Surf Life Saving Club opposite on Kingfisher Drive. While the established
built form varies in the locality, existing commercial and residential development is
consistently limited to two storeys in height.

Figure 1 following depicts the site in the context of the surrounding locality.

 

  
  

Subject Site:
224-228 David Low Way,
Peregian Beach

 

 

 

] Figure 1. Locality Plan

 

 

MATERIAL CHANGE OF USE - MOTEL 3
224-228 DAVID LOW WAY, PEREGIAN BEACH

Page 32

URBAN STRATEGIES (SUNSHINE COAST) PTY LTD vrv
TOWN PLANNING ASSESSMENT REPORT v

 

 

4. LEGISLATIVE MATTERS j

4.1 Application Process — Impact

 

The subject site is included in the Semi-attached Housing Zone in the Eastern Beaches
Locality of The Noosa Plan. Under the Assessment Table for the Semi-attached Housing
Zone (Part 7, Division 4, Table 7.2), the proposed Material Change of Use for Visitor
Accommodation Type 4 — Conventional is identified as an inconsistent use and subject to
Impact Assessment. It is however noted that the overall outcomes for the Eastern Beaches
Locality specifically states that Visitor Accommodation Type 4 — Conventional are located in
close proximity to the Peregian Beach neighbourhood centre.

Therefore, this application is to be assessed using the impact assessment procedures of the

Integrated Development Assessment System (IDAS) contained in Chapter 3 of the
Integrated Planing Act 1997.

4.2 Referral Co-ordination

 

The application will not require referral co-ordination for the following reasons:

« it does not require referral to three (3) or more State agencies;

«it does not involve a purpose or area listed under schedules 7 or 8 of the /ntegrated
Planning Regulation 1998; and

» It does not involve a preliminary approval under section 3.1.6 of the /ntegrated
Planning Act 1997.

4.3 Referral Agencies
There are no referral agencies required for this application.

 

 

‘5. STATE PLANNING MATTERS . |

5.1 South East Queensland Regional Plan

The subject site is identified within the Urban Footprint designation of the South East
Queensland Regional Plan. Land within the Urban Footprint is intended to accommodate
the full range of normal urban uses, such as housing, industry, business, infrastructure,
community facilities and urban open spaces. As such the use does not conflict with the
Plan.

 

5.2 State Planning Policies

 

There are no State Planning Policies involved in the assessment of this application.

 

MATERIAL CHANGE OF USE - MOTEL 4
224-228 DAVID LOW WAY, PEREGIAN BEACH

Page 33

URBAN STRATEGIES (SUNSHINE COAST) PTY LTD viv
TOWN PLANNING ASSESSMENT REPORT v

 

 

6. THE NOOSA PLAN ]

‘

6.1 Eastern Beaches Locality

The site is located within the Eastern Beaches Locality in The Noosa Plan. Under this
locality the site is included in the Semi-attached Housing Zone.

 

The Eastern Beaches Locality Plan recognises Peregian Beach as providing housing and
unit accommodation, as well as local convenience shopping, business and community
services for both permanent residents and visitors.

Table 7.13 of the Locality Code lists Visitor Accommodation Type 4 as an inconsistent use
that is not located in the Semi-attached Housing Zone. However, the overall outcomes for
the Eastern Beach Locality (section 7.8.2, clause q) ii) specifically states for Peregian Beach
“Multiple housing Type 2 Duplex and Visitor Accommodation Type 4 Conventional are
located in close proximity to the Peregian Beach neighbourhood centre shown in the
Neighbourhood Centre Zone;”

The subject site is just 60m from the existing Neighbourhood Centre Zoned land in the
centre of Peregian Beach. In addition, the approved ‘Peregian Boardwalk’ mixed use
development will directly adjoin the subject site to the south and will form part of the
neighbourhood centre. The site is within close proximity to the Peregian Beach
neighbourhood centre to support its development for Visitor Accommodation Type 4 in
accordance with the overall outcomes of the Locality.

The proposal is consistent with the overall outcomes for the Eastern Beaches Locality in the
following ways:

«= The proposal does not compromise the primary role of Peregian Beach as a
residential area that provides some visitor accommodation;

"The proposal provides visitor accommodation in close proximity to the existing
Peregian Beach neighbourhood centre;

= Site location, proposed uses and building design are consistent with the amenity
and safety expectations of the community;

« The proposal has been designed and will be managed to be compatible with
surrounding uses and maintain safety of people and works;

» The scale and form of development is consistent with that of surrounding existing
and approval development and displays a coastal character; and

« A landscaped setting will be provided.

On the basis of the foregoing and the overall outcomes’ direct desire for visitor
accommodation in close proximity to the Peregian Beach centre, sufficient justification exists
to support the proposal despite it being listed as an inconsistent use in the Semi-attached
Housing Zone.

The proposal complies with the Eastern Beaches Locality Code and other applicable codes
for the development, as detailed below.

6.2 Overlays

 

The site is not affected by any overlay provisions.

 

MATERIAL CHANGE OF USE — MOTEL 5
224-228 DAVID LOW WAY, PEREGIAN BEACH

Page 34

URBAN STRATEGIES (SUNSHINE COAST) PTY LTD
TOWN PLANNING ASSESSMENT REPORT

&

 

6.3 Codes

 

In accordance with Part 11 Division 4 Table 11.2, the proposal is assessable against the

following codes:

1) Eastern Beaches Locality Code;

2) Residential Uses Code;

3) Visitor Accommodation Code;

4) Landscaping Code; and

5) Engineering Works Codes.

These codes are addressed in turn below.

6.3.1 Eastern Beaches Locality Code

Division 15 — Specific Outcomes and Probable Solutions for the Eastern Beaches Locality

 

 

 

 

 

 

 

 

 

 

 

Table 7.11
Specific Outcomes ACR Proposal Compliance
| 7.9 Effects of use eum
Amenity No solution provided. The proposal has been v
O17 Uses are located, designed and designed such that adverse
operated to avoid significant adverse light, air quality, noise,
changes to the light, air quality, noise, accessibility and other impacts
accessibility or other conditions enjoyed are controlled.
by users of associated, adjoining or
nearby uses.
Character and function of the David No solution provided There is no existing significant v
Low Way landscaping along the site
O2 The vegetated character of the David frontage to David Low Way. The
Low Way is protected and new proposal involves landscape
development recognises and protects the improvements to the site
function, capacity and efficiency of the frontage. The proposal will not
David Low Way as the major north-south adversely impact on the function,
link throughout the coastal part of the capacity or efficiency of David
Shire. Low Way.
7.10, Built form . —— cee ett san
Density No solution provided The subject site comprises 2 Alternative
O3 The density of development within the approved lots of 600m? each. Solution
site area— Therefore a total population
a) is compatible with surrounding density of 13.2 persons is
development; and supported by O3.
b) does not exceed—
i. for the Detached Housing Zone The proposal has a density of
and the Rural Settlement Zone ... 18.2 persons, being 13 x 1
ii. for the Semi-Attached Housing bedroom units (13 x 1.4), which
Zone: equates to 151 persons per
A. for sites between 500m? and hectare.
599m? inclusive - 4.8 persons;
or Refer to Section 6.4 below for
B. for sites 600m* or more - 6.6 justification of alternative
persons, with the exception of solution.
the following sites which have
an allowable population
density of 320 persons per
hectare exclusively for the
purpose of a visitor hostet—
= Lot 295 on RP883860 at
14 Duke Street, Sunshine
Beach;
* Lots 339-341 on RP48111
at 1-3 Douglas Street,
Sunshine Beach;
= Lots 92-94 on RP94566, at
the corner of Wildflower
and Hill Streets, Sunshine
Beach; and
MATERIAL CHANGE OF USE - MOTEL 6

224-228 DAVID LOW WAY, PEREGIAN BEACH

Page 35

B.

 

 

 

 

 

URBAN STRATEGIES (SUNSHINE COAST) PTY LTD vo
TOWN PLANNING ASSESSMENT REPORT ¥
Eye OL ct utes) gk LCR ety Proposal Compliance
= Lots 8, 9 & 10 on P9315
and Lot 76 on MCH2969 at
215-219 David Low Way,
Peregian Beach;
iii. for the Attached Housing Zone ...
iv. for the Visitor Mixed Use Zone ...
and
¢) has a low site impact to enhance the
opportunity to maintain natural site
characteristics, including native
vegetation and natural landforms.
Height $4.1 Buildings and other The maximum height above v
O04 Buildings and other structures— structures have a maximum natural and finished ground level
a) are low rise and present a building height of — at any point is not more than 8m
height consistent with structures on a) if in the Attached Housing above natural ground level.
adjoining and surrounding land; Zone and located in
b) do not exceed a maximum height of— Sunshine Beach ...
i. For the Attached Housing Zone ... | b) if in the Visitor Mixed Use
ii. For the Visitor Mixed Use Zone ... Zone ...
iii, For any other zone— 2 storeys; ¢) ifin the Open Space
¢) do not visually dominate the street, Recreation Zone or the
adjacent properties, surrounding Community Services Zone
spaces or the existing skyline; vee
d) preserve the amenity of surrounding d) ifin the Rural Settlement
land, including existing sunlight to Zone ...
neighbouring properties; and e) in all other zones— 8m.
e) respect the scale of the dune and
coastal vegetation.
Setbacks $5.1 Buildings and structures | Schedule 1 requires the v
O5 Buildings and other structures are comply with the minimum following setbacks for the site: Alternative
appropriately designed and sited to— building setbacks identified in Front —-6m Solution
a) provide amenity for users of the Schedule 1 - Minimum Side — Half the building height in
premises as well as preserve the Boundary Setbacks. metres calculated at the same
visual and acoustic privacy of adjoining point
and nearby properties; Rear — 6m
b) provide adequate distance from
adjoining uses; The following setbacks are
c) preserve any existing vegetation that proposed:
will buffer the proposed building; " Front (David Low Way) - 6m
d) allow for landscaping to be provided to outermost projection of
between buildings; external walkway and stairs
@) maintain the visual continuity and « Side (Northern) —
pattern of buildings and landscape Motel component - 3.6m to
elements within the street; and face of building, and 2m to
f) protect the natural character and visual outermost projection of
amenity of the beachfront. balconies. (building height
6.35m)
Managers unit - 2.5m to face
of building, and 1m to
outermost projection of
pergola. (building height 6m)
* Side (Southern) — 3.1m to
face of building and 2m to
outermost projection of
walkway (building height 7m)
* Rear — 6m to face of building
and 3m to pergola.
Refer to Section 6.4 below for
justification of alternative
solution.
Site cover, gross floor area and plot | No solution provided Site Cover — ¥
ratio The proposed site cover is
06 The site cover, gross floor area and 480m? or 40%.
plot ratio of buildings and other roofed
structures— Gross Floor Area — Alternative
a) results in a building scale that is The maximum allowable Solution
compatible with surrounding population density for the site is
development: 13.2 persons, therefore the
b) does not present an appearance of maximum gross floor area is
excessive bulk to adjacent properties, 528m” (13.2 x 40).

 

 

 

 

 

MATERIAL CHANGE OF USE —- MOTEL
224-228 DAVID LOW WAY, PEREGIAN BEACH

 

Page 36

URBAN STRATEGIES (SUNSHINE COAST) PTY LTD

B.

view

 

 

 

 

 

 

 

TOWN PLANNING ASSESSMENT REPORT hd
AT eH em ele LE) MK R Lead Proposal Compliance
roads or other areas in the vicinity of The total proposed gross floor
the site; area is 553m’ or 46% of the site
c) maximises the retention of existing area.
vegetation and allows additional soft
landscaping between buildings; Refer to Section 6.4 below for
d) allows for adequate area at ground justification of proposed gross
level for outdoor recreation, floor area.
entertainment, clothes drying and
other site facilities; and
e) facilitates onsite stormwater
management and vehicular access,
07 Site cover does not exceed—
a) for the Detached Housing Zone ...
b) for the Semi-attached Housing Zone-
40%;
c) for the Attached Housing Zone ...
otherwise—40%; or
d) for the Visitor Mixed Use Zone-35%.
08 For Multiple Housing Type 2 ...
O9 For Multiple housing Type 3 or 4,
Visitor accommodation Type 4 or the
accommodation unit component of an
Entertainment and dining business
Type 3 (hotel)—the maximum gross floor
area is equivalent to the maximum
allowable population density in persons
multiplied by 40m?, provided that Lots 75-
77 on P9311 Heron Street, Peregian
Beach, have a maximum gross floor area
of 1200m*. ;
010 For the Detached Housing Zone and SoftLandscaping- v
Semi-attached Housing Zone—soft 240m* of soft landscaping is
landscaping is provided and retained over provided over the site area,
a minimum of 20% of the site area. which is 20% of the site area.
O11 For the Neighbourhood Centre Zone
Flooding and drainage $12.1 Floor levels for The lowest level of the site is in ¥
012 Buildings and other works are habitable rooms are— the order of RL 10m.
designed and sited to— a) for areas where minimum
a) provide flood free access to premises floor levels are available— Minimum floor levels and flood
and flood free habitable areas; not less than the specified modelling are not available for
b) allow only minor, short term and jevel; the site.
infrequent flooding of non-habitable b) for areas where flood
areas; modelling is available—a
¢) ensure drainage does not adversely minimum of 500mm above
impact upon other premises; and the modelled flood tevel;
d) ensure filling or excavation does not and
adversely impact upon other premises | c) for areas where flood
by-— modelling is not available,
i. causing ponding on the site or a minimum of 500mm
nearby jand; above the highest known
ii. increasing flooding, which flood level; AND
adversely affects the safety or use | $72.2 Where Council Stormwater from the site will be v
of any land upstream and infrastructure is available— appropriately drained to existing
downstream, and a) any drainage (for buildings | Council infrastructure of
iii, adversely affecting the flow of and land) flows to that sufficient capacity in the locality.
water in any overland flow path. infrastructure; and
b) the infrastructure has the
capacity to accept any
additional loading.
Roof form $13.1 The main roof of the The proposed pitch of the main w
013 Roof forms— building has a roof pitch no roof areas is 5 degrees. The Alternative
a) contribute positively to the local less than 5 degrees and has toof forms have varying plan Solution
skyline; roof overhangs a minimum of | shapes and are pitched at
b) complement the beachside character 600mm wide; differing angles to create soft
of the locality; AND visual interest and variety.
¢) use soft and articulated pitched or §13.2 Buildings and structures | Flatter, skillion style roof forms
curved roof forms; do not include roof top dominate the Pergian Beach
d) avoid low pitched (eg. less than 5 terraces. village and complement the
degrees) or box profiles/parapets; and beach side character of the
e) do not create opportunities for locality.
residents to overlook the private open

 

 

MATERIAL CHANGE OF USE - MOTEL
224-228 DAVID LOW WAY, PEREGIAN BEACH

 

Page 37

URBAN STRATEGIES (SUNSHINE COAST) PTY LTD

 

 

 

    

  

 

 

 

 

 

 

 

 

 

 

 

 

TOWN PLANNING ASSESSMENT REPORT v
Specific Outcomes Probable solutions Proposal Compliance
space areas of neighbouring A small section of roof above
properties. the lift does not have a pitch of 5
degrees, which is not visible
from the road frontage.
With the exception of the
western walls, roof overhangs a
minimum of 600mm are
provided beyond the external
wails.
No roof terraces are proposed.
Stoping sites NIA
O14 Not Applicable - the site is not considered a ‘sloping site’.
Entrance statement NIA
O15 Not Applicable — the site is not located at the southern entrance to Peregian Beach.
| 7.11 Environment, conservation and recreation ____.
Environment and cultural heritage | No solution provided The site is located within a 7
values sewerage service area,
O16 There are no significant adverse therefore PSP24 Effluent
effects on biodiversity, natural vegetation, Disposal is not applicable.
native fauna habitat, landscape quality, The proposal will not have any
water quality or cultural heritage values, adverse impact on biodiversity,
including those related to- natural vegetation, native fauna
a) changes to natural drainage; habitat, landscape quality, water
b) changes to natural coastal processes; quality or cultural heritage
¢) disturbance of the dune system and values.
wetland system;
d) management of landstide and fire risk;
e) erosion and the transport of sediments
off site;
f) unmanaged public access;
g) effluent disposal;
h) changes to fauna habitat and
behaviour; and
i) disturbance of buildings and features,
including natural features of cultural
heritage significance.
Open space network NIA
O17 Not applicable — the site is not located within an open space corridor indicated in Schedule 5 - Map 4.
Pedestrian and bicycle pathways NIA
018 Not applicable — the site is not located on a pathway indicated in Schedule 5 — Map 2.
Beach access points No solution provided A contribution toward beach ”
079 Access points to the sensitive access points will be made in
foredune systems are defined and accordance with PSP9 Beach
controlled by the establishment of key Access Contributions.
access nodes which are designed and
sited having regard to the potential
adverse impacts on—
a) visual amenity;
b) dune stability;
c) natural habitat; and
d) water quality;
AND
020 Access to the foredune system and
beachfront is via formalised communal
beach accesses, rather than individual
informal tracks.
Aircraft safety $21.1 Uses invalving disposal | N/A The site is not located N/A
027 Wildlife, including birds and bats, of putrescible waste are not within 13km of the Sunshine
are not attracted into the operational located within 13km of the Coast Airport.
airspace of the Sunshine Coast Airport in Sunshine Coast Airport; (See
significant numbers; Map MA‘ below)
AND AND
022 Physical obstructions do not $22.1 Uses involving aviation | The site is located within 15km v
adversely affect the operational airspace activities, including of the Sunshine Coast Airport,
of the Sunshine Coast Airport; parachuting and hot air however the proposed use does
AND ballooning, are not located not involve any form of aviation
within 15km of the Sunshine activity.
Coast Airport; (See Map MA2
below)
AND

 

 

 

MATERIAL CHANGE OF USE — MOTEL
224-228 DAVID LOW WAY, PEREGIAN BEACH

 

Page 38

URBAN STRATEGIES (SUNSHINE COAST) PTY LTD

TOWN PLANNING ASSESSMENT REPORT

 

Specific Outcomes
023 Emissions do not significantly affect
air turbulence, visibility or engine
operation in the operational airspace of
the Sunshine Coast Airport.

 
   
  
   
   
   

 

  

gio) tela dead)

$23.1 None of the following is
emitted within 15km of the
Sunshine Coast Airport—
smoke, ash, steam, dust or
gaseous plumes exceeding
4.3m per second. (See Map

MA2 below)

  
   

Proposal
The proposai does not involve
any activities that may emit
smoke, ash, steam, dust or
gaseous plumes.

     
   
  

 

Compliance

   

   
   
   
     

Division 17 — Specific Outcomes and Probable Solutions for the Semi-attached Housing Zone

 

 

 

 

 

 

 

 

 

 

Table 7.13
RYT em OL creity ake) Cee LS) Proposal! Compliance
7.16 Consistent Uses : \
032 The following defined uses and use No solution provided Visitor Accommodation Type 4 Alternative
classes are consistent uses and are is not listed as a consistent use Solution
located in the Semi-attached Housing in the Semi-attached Housing
Zone— Zone. Refer to justification
a) Home-based business Types 1 or 2; provided at 033 below.
b) Home-based business Type 3 where
located ...;
c) Commercial! business Type 1 or 2,
where located ...;
d) Detached house;
e) Multiple housing Types 1 or 2;
f) Visitor accommodation Type 1; and
g) Visitor accommodation Type 4 for a
Visitor hostel on—
* Lot 295 on RP883860 at 14 Duke
Street, Sunshine Beach;
* Lots 339-341 on RP48111 at 1-3
Douglas Street, Sunshine Beach;
* Lots 92-94 on RP94566 at the
corner of Wildflower and Hill
Streets, Sunshine Beach; and
© Lots 8, 9 & 10 on P9315 at 215-219
David Low Way, Peregian Beach.
| 7.17 Inconsistent Uses . __. __
033 The following defined uses and use No solution provided Visitor Accommodation Type 4 Alternative
classes are inconsistent uses and are not is identified as an inconsistent Solution
located in the Semi-attached Housing use. However, the overall
Zone— outcomes for the Eastern Beach
a) All Agricultural Uses; Locality (section 7.8.2, clause q)
b) Commercial business Type 1 or 2 ii) specifically states for
where not located on the western side Peregian Beach “Muttiple
of David Low Way between 215 and housing Type 2 Duplex and
253 David Low Way; Visitor Accommodation Type 4
c) Entertainment and dining business; Conventional are located in
d) Home-based business Type 3 where close proximity to the Peregian
not located on the western side of Beach neighbourhood centre
David Low Way between 215 and 253 shown in the Neighbourhood
David Low Way; Centre Zone;”
e) Industrial business;
f) Retail business; The subject site is just 60m from
g) Alt Community uses; the existing Neighbourhood
h) All Infrastructure Uses; Centre Zoned land in the centre
i) Ancillary dwelling unit; of Peregian Beach. In addition
j) Multiple housing Types 3, 4 or 5; and the approved ‘Peregian
k) Visitor accommodation Type 2 or 3; or Boardwaik’ mixed use
Type 4 where not a Visitor hostel on— development will directly adjoin
* Lot 295 on RP883860 at 14 Duke the subject site to the south and
Street, Sunshine Beach; will form past of the
* Lots 339-341 on RP48111 at 1-3 neighbourhood centre. The site
Douglas Street, Sunshine Beach; is therefore in close proximity to
* Lots 92-94 on RP94566 at the the Peregian Beach
corner of Wildflower and Hill neighbourhood centre to support
Streets, Sunshine Beach; its development for Visitor
* Lots 8, 9 & 10 on P9315 at 215-219 Accommodation Type 4 in
David Low Way, Peregian Beach. accordance with the overall
outcomes of the Locality.
MATERIAL CHANGE OF USE - MOTEL 10

224-228 DAVID LOW WAY, PEREGIAN BEACH

Page 39

&.

URBAN STRATEGIES (SUNSHINE COAST) PTY LTD wy
TOWN PLANNING ASSESSMENT REPORT v

 

ET eseelibmees dsc uUrd Laker ceo ahd Proposal Compliance

On the basis of the foregoing
and the overall outcomes’ direct
desire for visitor accommodation
in close proximity to the
Peregian Beach centre,
sufficient justification exists to
support the proposal despite it
being listed as an inconsistent
use in the Semi-attached
Housing Zone.

 

7.18 Effects ofuse

 

 

 

 

 

037 Garages and carports are designed
and sited to visually integrate with the
building and avoid dominating the street.

 

a) have a front boundary
setback of at least 6m; and
adopt a roof form and
building style that are the
same as that of the
building; and
present a minimum width
to the streetscape (the total
width of garage doors is no
more than 6m or 50% of
the frontage width,
whichever is the lesser,
where the structure faces
the street); or
that are visible from, but do
not face the street, include
windows or other
articulation and have a 6m
landscaped buffer between

 

garages or carports, or covered
parking between the road
frontage and building.
Carparking is screened from
David Low Way by landscaping
and the timber clad stair cases.

Visitor Hostels NIA

034 Nat applicable - The site is not listed in O34.

7.19 Built form _ _ _ . _ __ ~
Streetscape character $35.1 The main entrance of The proposal presents a high v
035 Buildings and other structures— the building faces and is quality streetscape by way of the
a) contribute positively to the streetscape | recognisable from the street; following:

character by addressing the street and | $35.2 Buildings and other * Building scale and bulk are in
adding visual interest through stepping | structures are designed to— keeping with the surrounding
the front fagades; a) have maximum wall length and approved buildings.

b) have a bulk and architectural scale of 15m and each external = The u-shaped building design
that does not dominate the wall plane incorporates at presents as 2 smaller building
streetscape or detract from the visual least one design element entities when viewed from
amenity of adjoining properties; to add visual interest and David Low Way.

¢) present as a small building of a amenity (such as windows, * Variation in the fagade
domestic scale within a landscaped pergolas, sun shading treatment provides visual
setting; and devices, baiconies or a interest to the street scape.

d) present well articulated fagades where change of building * Landscaping and the timber
garages or carports are not the material). clad stair cases screen the
dominant visual element when viewed | b) vary and break up the roof majority of carparking from
from the street; form through gables or the street.

different pitches to add * A variety of colours and

036 No more than 2 dwelling units are visual interest and define materials, including rendered

located on any site. the individual dwelling concrete, zincalume roofing,

units; timber screening, glazing, will

¢) provide individual add texture and variations to
segmented balconies for the building facades.
each dwelling unit to * Landscaping has been
teduce dominant horizontat incorporated into the overall
banding and to provide site layout
private open space for
each tenancy; The proposal involves only 1

d) break up building facades dwelling unit on site, being the
by incorporating different managers unit. The motel units
but complimentary textures | are considered ‘accommodation
and building materials; and | units’ as they are not self

e) visually break up the bulk contained.
of the building by
integrating tall plant
species in front of and to
the side of buildings;

Garages and carports $37.1 Garages and carports— | The proposal does not involve v

 

 

 

 

MATERIAL CHANGE OF USE - MOTEL
224-228 DAVID LOW WAY, PEREGIAN BEACH

41

Page 40

URBAN STRATEGIES (SUNSHINE COAST) PTY LTD

.

wr

 

 

 

 

 

 

 

 

 

 

 

 

TOWN PLANNING ASSESSMENT REPORT v
EJ LLCO ceed eke cw Leia) Proposal fore iy se Laid
the structure and the road
frontage; and
$37.2 Covered parking spaces
located in the area between
the dwelling facade and the
road frontage do not comprise
carports.
Professional offices
038 Not applicable — The proposal does not involve professional offices and is not located on the western side NIA
of David Low Way.
Front fences and walls $39.1 Front fences or walls Front fencing will have a v
039 Front fences and walls are designed | are— maximum height of 1.2m and be
and sited to— a) not forward of the front plane| of open construction with at
a) contribute to the attractiveness of the of the dwelling units; or least 50% transparency.
street; b) no more than 900mm high;
b) be compatible with the existing or
streetscape character; ¢) no more than 1.2m high and
¢) relate to the architectural period of the of open construction (ie. at
building; least 50% transparent);
d) avoid interference with the movement OR
of surface stormwater; $39.2 For premises with
e) allow for casual surveillance from the frontage to the major road
street or where premises adjoin part of | network front fences or walls
the major road network, mitigate traffic | are no more than 1.8m in
noise; height and are articulated so
f) provide for planting in front of high that a minimum total of 2m? of
solid fences and walls; and landscaped area is provided
g) ensure planting between the front between the fence and the
fence and the footpath does not create | front property boundary.
an impediment for pedestrians using
the footpath.
6.3.2 Residential Uses Code
Table 14.21 For All Residential Uses
Specific Outcomes ie) etd Proposal Compliance
14.52 Effectsofuse . _ . i
Electricity supply infrastructure $1.1 No solution provided The proposal will not impact NIA
O17 The development does not adversely | S2.7 Development for uses existing or future electricity
impact on existing or future electricity adjacent to or within 50m of an | supply infrastructure.
supply infrastructure; existing electricity substation
AND incorporates noise attenuation | The site is not located within
O02 All uses and works maintain an measures to mitigate noise 50m of an existing electricity
adequate safe distance from electrical impacts; substation or within close
infrastructure including substations, AND proximity of overhead electricity
overhead powerlines, power poles and $2.2 Buildings and structures | transmission lines or electricity
transformers. {including swimming pools, easements.
sheds, tennis courts or
outbuildings) are not The ‘Substation Kiosk’ noted on
constructed under overhead the site plan is private
electricity transmission lines, infrastructure associated with
or within electricity easements; | the adjoining Peregian
AND Boardwalk development.
$2.3 A minimum separation
distance is maintained from The site is not located under any
the electricity transmission line | electricity transmission lines, or
to the closest boundary of within electricity easements.
habitable buildings and child
activity areas, as follows—
a) 20m for transmission lines
up to 132kV;
b) 30m for transmission lines
between 133kV and 275kV;
¢} 40m for transmission fines
greater than 275kV.
| 44.53 Environmentally Sustainable Building Design . _. i.
Hot Water Systems $3.1 All hot water systems Ail hot water systems will v
O3 Hot water systems are installed and installed are— comply, and the approval may
operated to support the efficient use of a) solar systems; or be conditioned accordingly.

 

 

 

 

 

 

 

MATERIAL CHANGE OF USE — MOTEL
224-228 DAVID LOW WAY, PEREGIAN BEACH

12

Page 41

URBAN STRATEGIES (SUNSHINE COAST) PTY LTD

B.

vi

 

 

 

 

 

 

 

 

 

 

 

TOWN PLANNING ASSESSMENT REPORT v
ESS eeraLiceOLeLCex uted eke) eS eMsxe Lob Proposal Compliance
natural resources and minimise b) electric heat pump
consequent pollution such as greenhouse systems; or
gas emissions. c) natural gas or LPG
systems; or
d) any combination of a), b) or
c).
Water supply and conservation $4.1 If in a designated Schedule 8 requires rainwater v
04 On-site water storage is designed and | rainwater tank area as tanks to have a minimum
operated to support the efficient use of identified in Map 1 of storage capacity of 3,000L per
water; Schedule 8, residential uses dwelling unit. As the proposal
AND that qualify as class 1A or 1B involves only one dwelling unit,
O5 On-site water storage is adequate for | structures under the Building one tank of 3,Q00L capacity will
occupants every day use and fire fighting Code of Australia have a be provided on site.
purposes. rainwater tank or tanks in
accordance with Schedule 8.
AND
$5.7 Where not in a water
service area a rainwater tank
of a minimum of 60,000 litres
is provided for each dwelling
unit, with the exception of
Multiple Housing Type 1.
Erosion and sediment controt No solution provided. Appropriate measures will be ”
O6 Development does not cause erosion implemented during construction
or result in transport of sediments off-site. and operation to ensure erosion
or transportation of sediments
off-site does not occur.
t 14.54 Amenity and Built form ~~ ™ i“ ~ ~ {
Safety and security
07 Not applicable — the proposal does not involve Multiple Housing Types 2, 3 or 4. NIA
Emergency access
8 Not applicable — the proposal does not involve Multiple Housing Types 2, 3 or 4. NIA
Separation of incompatible uses 9.1 Bedroom windows are at {| No motel room window is within v
9 Development is designed to minimise | least 3m away from shared 3m of the driveway or carparking
noise carrying between dwelling units or driveways or carparking areas | areas on the site or on adjoining
accommodation units by locating noise of adjacent dwelling units or sites.
sensitive spaces such as bedrooms away | accommodation units.
from noise generating areas of the
development, such as carparking areas or
mechanic plant and equipment or
recreational facilities.
Mechanical plant & equipment $70.1 Mechanical plant and Mechanical plant/equipment will v
010 Mechanical piant and equipment equipment, including pool and | be appropriately located and
associated with Residential Uses are spa pumps, pool heaters, air- screened and the approval can
designed and located so as not have an conditioning units and be conditioned accordingly.
adverse impact on the visual amenity of refrigeration units are—
the site or surrounding areas. a) where located at ground Plant/equipment will be
level, screened by fencing integrated into the building and
1.6m in height or dense will not project from the rooftine
vegetation of atleast 1.5m | or width of building when viewed
in width incorporating from the street and adjoining
grouped trees and shrubs properties.
with maximum separation
distance of 1m measured
from the centre of the
plant; and
b) for Multiple housing Type
2,3 & 4 are visually
integrated into the line and
plane of the building and
toof design and do not
project beyond the height
or width of the building
when viewed from the
street and adjoining
properties.
Ancillary recreation uses $11.17 If the use involves The use does not involve any v
O17 Ancillary recreation uses, such as ancillary use of outdoor courts | outdoor courts.
outdoor tennis courts and half netball including tennis courts, half
courts, do not have an adverse effect on courts and netball courts—the

 

 

 

 

 

 

 

MATERIAL CHANGE OF USE - MOTEL
224-228 DAVID LOW WAY, PEREGIAN BEACH

13

Page 42

URBAN STRATEGIES (SUNSHINE COAST) PTY LTD

 

 
     

  
    
     
   

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TOWN PLANNING ASSESSMENT REPORT v
Teli OL LiL ed kere! Proposal Compliance
the amenity enjoyed by users of adjacent use complies with the
or nearby premises. requirements in Section 2 of
PSP8 Tennis and Other
Courts.
Privacy NIA
O12 Not applicable — the proposal does not involve Multiple Housing Types 2, 3 or 4.
Access to Sunlight
013 & 014 Not applicable — the proposal does not involve Multiple Housing. Proposed setbacks and building NIA
height ensures the development will not reduce sunlight to adjoining residences private open space by more
than 2 hours or 20%.
Sloping sites NIA
015 Not applicable — The site is not considered a ‘sloping site’ as slope is less than 20%.
Wall length and detailing $16.7 The maximum wall With the exception of the Aiternative
O76 Within the Semi-attached Housing, length is 15m; southern elevation. The eastern Solution
Attached Housing and Visitor Mixed Use wall of the manager unit, being
Zones buildings and other structures AND approximately 19m, no wail
provide for visual interest and amenity exceeds a length of 15m in one
by— plane. This wall is not visible
a) staggering or separating continuous from the street and is setback
walls into smaller sections to vary the 6m from the rear boundary.
elevation; and Articulation and visual interest is
b) providing well articulated building provided along the wail through
forms with strong vertical design the use of a substantial number
features. of windows of different sizes and
heights and vertical timber
battens.
$16.2 Wail planes incorporate | All wall planes incorporate
design elements to add visua! | design elements to add visual ¥
interest and amenity, such as interest and amenity such as
windows, pergolas, sun windows, openings, roof
shading devices and overhangs, pergolas, and
variations in balcony styles. variation in building setbacks
and materials.
6.3.3 Visitor Accommodation Code
Table 14.30 All Visitor Accommodation
eta O Oo e Probable Oo o Proposa 3) p
| 14.79 Effects ofuse _. _— .
Electricity infrastructure $1.1 No prescribed solution The proposal will not v
Of The development does not adversely impact on existing
adversely impact on existing or or future electricity supply
future electricity supply infrastructure.
infrastructure; $2.1 Development for uses The site is not adjacent to or NIA
AND adjacent to or within 50m of an within 50m of an existing
O02 Alluses and works maintain an | existing electricity substation electricity substation.
adequate safe distance from incorporates noise attenuation The ‘Substation Kiosk' noted
electrical infrastructure including measures to mitigate noise impacts; | on the site plan is private
substations, overhead powerlines, infrastructure associated with
power poles and transformers. AND the adjoining Peregian
Boardwalk development.
$2.2 Buildings and structures No part of the proposed v
{including swimming pools, sheds, development is located under
tennis courts and outbuildings) are overhead electricity
not constructed under overhead transmission lines, or within
electricity transmission lines, or electricity easements.
within electricity easements.
Siting No prescribed solution The proposal is located and v
O03 Visitor Accommodation designed such to ensure ease
provides access to valued features, of access to the surrounding
facilities or attractions of the Shire facilities such as the beach,
including— surrounding commercial and
a) the beach; retail uses and major road
b) other natural features; network.
¢) visitor attractions and services;
d) town or village centres; or
e) the Noosa Trail Network.

 

 

 

MATERIAL CHANGE OF USE - MOTEL

224-228 DAVID LOW WAY, PEREGIAN BEACH

14

Page 43

URBAN STRATEGIES (SUNSHINE COAST) PTY LTD

&.

wow

 

 

 

 

 

 

 

 

 

TOWN PLANNING ASSESSMENT REPORT v
Seemed el eine) Probable solutions Proposal Compliance
Scale No prescribed solution This scale of visitor wv
04 Visitor accommodation is at a accommodation is
scale and nature complementary complementary in scale and
and respectful to its surroundings character to the existing and
and does not unduly impact on approved surrounding
adjacent or surrounding land uses development and will not
or the amenity of the surrounding result in undue impacts on
area. surrounding land uses or
amenity.
Mitigation of noise impacts $5.1 Visitor accommodation is not | The site is located on the ¥
O5 Development is designed and located along parts of the major road | major road network, however
sited to avoid adverse noise network which have a legal speed the speed limit of David Low
impacts associated with limit of 80km/hr of above and are Way at the site frontage is
neighbouring noise sources by— setback 40m from the North Coast less than 80km/h. The site is
a) locating the use away from major | railway line. not within 40m of the North
noise sources such as busy roads Coast railway line.
or rail corridors: or
6) applying appropriate noise
attenuation measures into the
development.
14.80 Effects of works __. __. EE _
Water supply $6.1 Where the premises is not ina | N/A The site is within a water NIA
O6 An adequate, safe and reliable water service area, the premises are | service area.
water supply is available to the provided with a reliable supply of
premises. potabie water that includes on-site
AND storage of at least 4,000 litres per
guest accommodated on the
premises.
OR
$7.1 If in a designated rainwater The proposal is not a class 1A NIA
tank area as identified on Map 1 of or 1B structure under the
Schedule 8, visitor accommodation Building Code, therefore
that qualifies as class 1A or 1B Schedule 8 is not applicable.
structures under the Building Code
of Australia has a rainwater tank or
tanks in accordance with Schedule
8.
O7 Qn-site water storage is No solution provided On-site water storage is v
designed and operated to support designed and operated to
the efficient use of water. support the efficient use of
water.
Effluent disposal NIA
O8 Not applicable - The site is within a sewerage service area.
14.81 Amenity " - _ b _
Safety and security $9.1 The building entrance is clearly | The main building entrance is ¥
O09 For Visitor accommodation identifiable and visible from the centrally located and visible
Type 4— buildings and outdoor street, footpath and driveway; and from the road and site
spaces are designed to protect the entrance.
personal security and safety of $9.2 The internal path network has The open ground level ”
residents by allowing for natural clear sightlines to the dwelling entry carparking area ensures the
surveillance and street access points; and internal driveway has clear
sightlines to the main entrance
and reception area. The
Staircases leading to the
individual motel units are also
clearly legible from the site
entrance.
$9.3 Visitors have direct access to Visitors have direct access to ¥
the entrance without passing unit entries without the need to
through private outdoor living areas. | pass through private open
space areas.
Emergency access No prescribed solution Safe and efficient access and v
O10 For Visitor accommodation egress for emergency vehicles
Type 2 or 4—site design and layout is available on site. Standing
ensures efficient access and egress and manoeuvering area is
for emergency vehicles. provided at ground level in
close proximity to the
accommodation unit entries.

 

 

 

 

 

 

MATERIAL CHANGE OF USE ~ MOTEL

224-228 DAVID LOW WAY, PEREGIAN BEACH

15

Page 44

 

 

 

 

 

URBAN STRATEGIES (SUNSHINE COAST) PTY LTD ve
TOWN PLANNING ASSESSMENT REPORT v
Table 14.36 Type 4 — Conventional (Motel or Resort Style)
714.88 Effects of use ” ae ~
Access & parking $41.7 No prescribed solution. Convenient, safe and efficient ¥
041 Parking and vehicular access onsite carparking and
is conveniently, safely and vehicular access is provided
efficiently provided for visitors and for visitors, motel guests and
service providers; service providers.
AND $42.1 Visitor carparking spaces are | 2 visitor parking spaces, v
042 Visitor carparking spaces are accessible at all times and are not including one disabled access
accessible at all times; located behind locked gates; space, are accessible at all
AND AND times and will not located

behind locked gates.
043 Visitor carparking spaces do $43.1 Visitor carparking spaces are | Visitor carparking is not v
not hinder the access or movement | not located in tandem with a garage | located in tandem with any
of any vehicle on-site. or other carparking space. other carparking spaces.
Laundry & clothes drying facilities | $44.1 Any accommodation unit fitted | N/A The proposed units do N/A

044 Guest laundries and drying
facilities are designed to be energy
efficient without detracting from the
amenity of the premises.

 

with a laundry or washing machine
also has a clothes drying area with
a fixed clothes line, open to breezes
and located to receive sunlight
(filtered or direct) for at least two
hours per day; AND

$44.2 Clothes drying areas are
screened from adjoining properties
and road frontages.

 

not have laundries or washing
machines,

No designated clothes drying
area is proposed. Laundry
facilities, including dryers are
proposed within the ‘services’
area on the ground floor.

 

 

 

6.3.4 Landscaping Code

The purpose of the Landscaping Code is to achieve a high quality of landscape design.
Detailed landscape plans for the proposed visitor accommodation development shall be

provided with an application for Operational Works approval.

development will be acceptable, as it shall:

The landscaping for the

* include a minimum area of 240m? (20% of the site) of soft landscaping in
accordance with O10 of the Eastern Beaches Locality Code;

«= have a minimum width of 2m along the site frontage and rear boundary;

* include low maintenance vegetation;

= minimise opportunities for concealment, thus improving personal safety;

« not require an excessive amount of water;
» facilitate infiltration of stormwater, thereby minimising runoff; and
«utilise native plants complementary to the character of the area.

6.3.5 Engineering Works Codes

In accordance with the Driveways and Carparking Code the development is provided with 1
carpark per motel and dwelling unit plus 2 spaces for visitor parking. The driveway design
is in accordance with applicable Australian Standard and AUSTROADS.

More detailed assessment against these codes will be undertaken at operational works and
building works application stages.

 

MATERIAL CHANGE OF USE - MOTEL 16
224-228 DAVID LOW WAY, PEREGIAN BEACH

Page 45

v Z wv
URBAN STRATEGIES (SUNSHINE COAST) PTY LTO

vr
TOWN PLANNING ASSESSMENT REPORT ¥

 

6.4 Alternative Solutions — Eastern Beaches Locality Code

Justification of alternative solutions to $13.1, 032, O33 of the Eastern Beaches Locality
Code and $16.1 of the Residential Uses Code are provided in the above assessment tables.

 

Justification of alternative solutions to O3, S5.1 and O6 of the Locality Code are provided
below.

Specific Outcome O3 — Density

The total population density supported by O3 is 13.2 persons. The proposal has a density of
18.2 persons, being 13 x 1 bedroom units (13 x 1.4), which equates to 151 persons per
hectare.

The proposal is however for short term visitor accommodation and not permanent living as
generally intended with residential areas in the Semi-attached Housing Zone. It is accepted
that ‘population’ densities for short term visitor accommodation are higher than permanent
living and this is acknowledged in O3 which allows a population density of 320 persons per
hectare for a visitor hostel on the nearby Peregian Caravan Park site. The proposal at 151
persons per hectare remains a considerably lower density. The proposal is compatible with
the scale and character of adjoining and surrounding residential, mixed use and commercial
development.

The proposal complies with site cover and landscaping requirements and therefore
maintains an acceptable built form density. The proposal will have a low site impact. The
site does not display natural site characteristics, such as native vegetation or natural
landforms that will be compromised by the proposed development. The proposal does not
involve significant cut or fill works.

The proposal is consistent with the overall outcomes of the Eastern Beaches Locality and
the Semi-attached Housing Zone, which support visitor accommodation in close proximity to
the Peregian Beach neighbourhood centre.

The maximum densities identified for the various zones have been determined by the
desired resident population for the Shire in light of infrastructure availability and capacity.
The proposal is for short term visitor accommodation, therefore the increased density will not
alter or compromise the resident population of the Shire.

In accordance with the Shire wide Desired Environmental Outcome i) Residential Uses, the
proposal is consistent with the planned capacity of local infrastructure; within the
expectations of the Shire population to have access to a range of safe, secure and
affordable housing; and within the expected character and amenity of the locality.

Further, the proposal is consistent with DEO j) Tourism as it promotes visitor
accommodation, therefore the tourism industry in Peregian Beach; offers additional choice in
accommodation types in the locality; and is located close to the beach and national parks,
which are the tourism industries base.

The proposal for visitor accommodation at a density of 18.2 persons is appropriate for the
site and does not conflict with the overall Locality outcomes or the Shire wide DEO’s.

 

MATERIAL CHANGE OF USE - MOTEL 17
224-228 DAVID LOW WAY, PEREGIAN BEACH

Page 46

&.

URBAN STRATEGIES (SUNSHINE COAST) PTY LTD viv
TOWN PLANNING ASSESSMENT REPORT v

Probable Solution $5.1 — Setbacks

Northern Boundary Setback —

Sections of units 1, 2 and 6 balconies encroach on the required setback of 3.175 (half
proposed building height of 6.35m). The northeastern corner of the managers unit also
encroaches on the required setback of 3m (half proposed building height of 6m).

The average setback along the northern boundary is generally compliant.

The parts of the balconies of units 1, 2 and 6 that encroach in the setback are not generally
roofed. The main roof fine stops short of covering the balconies. Vertical rendered walls
provide privacy between balconies and protection from western sun. These vertical walls
and the balcony balustrade only encroach on the setback. The ground level carparking area
is unenclosed along the northern boundary, therefore minimising the visual impact of the
reduced setback on adjoining properties. The varied and articulated building form will have
less impact than would a single building plane strictly complying with the probable solution.

Southern Boundary Setback —

The 1.5m wide external waikway that provides access to motel units 7-12 is within the
required setback of 3.5m (building height 7m). The walkway is an unenclosed area, with
solid balustrade and sections of solid walls to provide privacy to unit entrances. The
southern end of the managers unit also encroaches the required setback of 3.175m by 0.5m
(building height 6.35m). There are no proposed openings in the southern wall of the
managers unit. The southern boundary is adjoined by a mixed use development, of which
the residential component is located above ground level, adjoining the 6m rear setback area
of the subject site, and is setback 17.5m from the common boundary. The reduced setback
will not adversely impact on the amenity of this future adjoining visitor accommodation to the
south.

The proposed side setbacks comply with the requirements for duplex dwellings, which are
identified as a consistent use in the Semi-attached Housing Zone. Therefore the proposed
building setbacks of 2m are within the reasonable expectation of adjoining residents.

Rear Boundary Setback —

Light weight pergola over ground level encroaches the required setback of 6m. The pergola
provides shading to the outdoor common recreation area. The pergola will not result in
additional overshadowing or loss of amenity to neighbouring residential premises. The
pergola provides improved amenity and protection for site users. The proposed setback
provides adequate opportunity for landscaping along the rear boundary.

The proposed 1.8m high solid boundary fencing will limit visibility of the pergola from
neighbouring properties. The proposed setbacks provide adequate distance from adjoining
uses, allow for landscaping to be provided between buildings and they will maintain the
visual continuity and pattern of buildings and landscape elements along David Low Way.

Specific Outcome O6 —- Gross Floor Area

The maximum allowable population density for the site is 13.2 persons, therefore the
maximum gross floor area is 528m? (13.2 x 40). The total proposed gross floor area is
553m’ or 46% of the site area.

The proposed gross floor area is commensurate with the proposed density and use for
visitor accommodation. On the basis of the proposed density being acceptable, so to is the

 

MATERIAL CHANGE OF USE - MOTEL 18
224-228 DAVID LOW WAY, PEREGIAN BEACH

Page 47

3
URBAN STRATEGIES (SUNSHINE COAST) PTY LTD wry
TOWN PLANNING ASSESSMENT REPORT v

 

gross floor area, as it is considerably less than allowable under the formula of density
multiplied by 40m? (ie. 18.2 x 40 = 728m).

The proposed gross floor area has been contained within a building complying with the 40%
site cover requirement, thereby providing a building scale intended for the site and
compatible with the scale and character of adjoining and surrounding development. In
addition, the proposed front setback and u-shaped configuration minimises any appearance
of building bulk when viewed from David Low Way. The proposal has been designed to
provide adequate outdoor recreation area and vehicle access and parking at ground level.
The site does not display natural site characteristics, such as native vegetation or natural
landforms that will be compromised by the proposed development. The proposal does not
involve significant cut or fill works.

The proposed gross floor area does not compromise the overall Locality outcomes or the
Shire wide DEO’s.

 

(7. CONCLUSION |

This proposal is for Visitor Accommodation Type 4 Conventional comprises 12 motel units,
mangers dwelling unit and ancillary facilities and parking.

Whilst Visitor Accommodation Type 4 Conventional is not identified as a consistent use in
the Semi-attached Housing Zone, the proposal is supported by the overall outcomes of the
Eastern Beaches Locality and does not conflict with the Shire wide DEOs. The proposal
provides short term visitor accommodation in close proximity to the Peregian Beach
neighbourhood centre. The proposal has been architecturally designed to be compatible
with the scale and character of adjoining and surrounding development.

The proposal generally complies with the provisions of the relevant codes. Where
inconsistencies occur they are justified against the performance criteria of the codes and the
overall outcomes of the Code and Shire wide DEO’s, as applicable.

Approval of this application for Visitor Accommodation Type 4 is warranted.

URBAN STRATEGIES (SUNSHINE COAST) PTY LTD
November 2006

 

MATERIAL CHANGE OF USE — MOTEL 19
224-228 DAVID LOW WAY, PEREGIAN BEACH

Page 48

GFA SUMMARY

Area

GROUND FLOOR
Entertainment,
In-house dining,
BOH, Reception

FIRST FLOOR
Accommodation
Lobby
Managers Unit

TOTAL GFA

191

289

65

553

SITE COVERAGE SUMMARY

- Measurement taken 600mm in from roof profile where external area below

Area

OTAL SITE AREA - 1200m2

ITE COVERAGE 480
TOTAL SITE COVERAGE 40%

SETBACKS / VOLUME RESTRICTION SUMMARY
The Proposed Development complies with the following requirements:

SETBACKS

DAVID LOW WAY - 6m to Building/Walls, 2m to Open Carparking
SIDE BOUNDARIES - 2m to Building/Walls

REAR BOUNDARY - 6m to Building/Walls

HEIGHT

MAXIMUM HEIGHT - 2 Stories / 8m

@. epankine SUMMARY

~ Site facilities designated for guest use only

Arrangement
DEVELOPMENT WITH MANAGER UNIT
1 space / unit + 1 space / 10 units 15

LANDSCAPING SUMMARY

Area

TOTAL SITE AREA - 1200m2

SOFT LANDSCAPING AREA 240
TOTAL SOFT LANDSCAPING [%] 20%

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

PEREGIAN BOARDWALK COMMERCIAL DEVELOPMENT

 

 

 

 

 

 

HERON STREET

COMMERCIAL DEVELOPMENT

|

 

 

CUIENT

RAPHILL Pty. Ltd.

 

H2o architects Pty Ltd

29 Northumberland Street
Collingwood ”

Victona 3066 Australia

T61 39417 0900

F 6139417 0011
[email protected]

H20

 

PRQECT

PROPOSED MOTEL
PEREGIAN BEACH

 

CAAWING TE,

 

 

  

COVER

AREA SCHEDULE

SITEPLAN

CAE DRAWN BY
1:500

PROJECT NUMBER, ‘PLOT DATE
0620 10/11/2006

DRAWING NUMBER

A000

REVISION

4

 

 

 

 

Page 49

 

SITE COVERAGE
COVERAGE = 480m?
SITE AREA = 1200m?

TOTAL SITE
COVERAGE = 40%

 

 

 

 

 

 

 

 

EXTERNAL WALKWAY
AREA = 90m?

 

 

 

 

 

ROUND FLOOR
GFA = 191m?

 

 

 

 

 

 

 

    

 

 

 

GFA-FIRST FLOOR

 

 

 

 

SOFT LANDSCAPING
AREA = 240m?
SITE AREA = 1200m?

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

TOTAL = 20%

 

 

EXTERNAL WALKWAY

EXTERNAL WALKWAY

 

EXTERNAL WALKWAY

 

 

 

 

‘QUENT

RAPHILL Pty. Ltd.

 

20 architects Pty Ltd
29 Northumberland Street

Collingwood
Victona 3066 Australia

[email protected]

 

PROUECT

PROPOSED MOTEL
PEREGIAN BEACH

 

ORAWING THLE
AREAS

GFA, SITE COVERAGE,
SOFT LANDSCAPING

 

 

 

SCN DRAWN BY

PROJECT NUMBER, PLOTOATE,

0620

DAAWANG NUMBER | REMSICA

 

A001

3

 

H20

 

10/11/2006

 

Page 50

 

NOTE:
RAINWATER TANKS PROVIDED AS.
PER BCA REQUIREMENTS.

 

   
             

SERVICES

 

  

\FT

        

 

 

 

 

Woe aN fp fil 11.000 io
, oko:
k |, PAVING

y
\
ECEPTION — INHOUSE coe
DINING fe
> PERGOLA.

T

OVER ~
oe

~~
So
2
Leal

 

RL10.900

 

   

 

Loa
BUILDING LINE OVER f oO

FENGE 1.8m HIGH

 

 

 

 

 

SERVICES ENTERTAINMENT

 

 

 

 

 

‘GUENT

poenw ed pees RAPHILL Pty. Ltd.

 

 

 

 

 

 

FENCE 1.8m HIGH ' \ 6000

SETBACK H20 architects Pty Ltd
29 Northumberland Street
Collingwood ;
Victona 3066 Australia

 

 

H20

[email protected]
RAMP TO PEREGIAN BOARDWALK OES

PROPOSED MOTEL
PEREGIAN BEACH

 

 

 

 

DRAWING TLE,

GROUND FLOOR

AE ORAWN BY
1:200

BAQVECT NUMBER, PLOT OATE,

GROUND FLOOR PLAN 0620 10/11/2006
SCALE: 1:200@At ORANG NOME REWSION

A101

 

 

 

 

    

   

4

 

 

 

 

Page 51

       

   

(01 \ FIRST FLOOR PLAN
KL SCALE: 1:200@A1

 

SS
SETBACK a

EXTERNAL WALKWAY

    
   

BALCONY

EXTERNAL WALKWAY

EXTERNAL WALKWAY

qi
BL

MANAGERS
UNIT

        

 

 

 

 

 

‘QUENT

RAPHILL Pty. Ltd.

 

H2o0 architects Pty Ltd
29 Northumberland Street

Collingwood
Victona 3066 Australia

H20

[email protected]

 

PROUEGT

PROPOSED MOTEL
PEREGIAN BEACH

 

DAAWAG TIE,

FIRST FLOOR

 

 

DRAWN BY

PROJECT NUMBER PLOTORTE,

9620 10/11/2006
‘DRAWANG MUMBER FEMSIGN

A102

   
 

 

 

 

4

 

Page 52

(01. ROOF PLAN
ay, SCALE: 1:200@A1

 

 
   

ROOF BELOW

 

 

 

 

QUENT

RAPHILL Pty. Ltd.

 

Ho architects Pty Ltd

29 Northumberland Street
Collingwood .

Victona 3066 Australia

T 61 39417 0900

F61.39417 0911
[email protected]

H20

 

PROUECT

PROPOSED MOTEL
PEREGIAN BEACH

 

DRAWING THLE,

ROOF PLAN

 

 

   

DRAWN BY

PROEGT NUMBER PLOT DATE
620 10/11/2006

DRAWAG NUMBER REvsice
| 4

    

  

A103

 

 

 

 

Page 53

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

           

 

 

HEIGHT UMIT |
RL +19.000 LL
PARAPET LEVEL |
RL +18.000 OE = : ——— ~ ee ee
RL +17.350 Faas TT
|
FIRST FLOOR E | .~ ee
RL +14,000 3) i : E = a -
i | be Al [ = z
2 ‘ i HN) See WAZ == E
GROUND FLOOR 5] POOL DECK E f | t Tt |_|] | SARPARKING i He = §
ene | | SOLD BALLSTRADE | $$ _ iowa
a GLAZNG TENDED SLOCRHORR |For PaIvacy AND TO Loe COWMN TIMBER CLAD STAR |
| UMIT OVERLOOKING 3
z. 5
=| g|
|
@ | |
| |
(02\ NORTH ELEVATION
SCALE: 1:200@A1
| ENDEROC/PRECAST WALL |
e@ 600mm EAVES CVERHANG —7 PAINTED METAL FASCIA ENOEAOC PARA eT SEND RENDERED BLOCKWORK/ PRECAST :
cwecetuwe LL =-—---=-— : {oop
RL +19,000 . .
CDARAPETLEVEL 2 bi Je 4 — - — - _—— L — —
RL +18,000 | case a v | ° oO
RU +17.360 7 — AR ar - — i — - =
i RAPHILL Pty. Ltd.
= AHL :
aaueene 1) A
PI Y ANI MI
FIRST FLOOR OVERLOCKNG L LA | | | 0
RL +14.000 Br — gO
#18 3 SSS { Z H20 architects Pty Ltd
e = ij 2 28 Northumberland Steet
i : vaca =
GROUND FLOOR ——- SS i =| F6139417 0911
SRO = = [email protected]
al ‘SOLID BALUSTRADE LL al PROT
3 TIMBERCLADSTAIR— FOR PRIVACY AND TO. — ENTRY CANOPY — TIMBERCLAD STAIR 3) PROPOSED MOTEL
3| UMIT CVERLOOKNG &| PEREGIAN BEACH
| i Sane
ELEVATIONS
| | WEST, NORTH
|
rors
1:200
(01) WEST ELEVATION a
(J SCALE: 1:200@ 41 10/11/2006
Faso
4

 

 

Page 54

 

 

| PESDEROGIPRECAST
-RENDEROC / PRECAST PAPAPET
HEIGHT LIMIT _ _ _ _ _ _ - oe LL ee FO RES A LPR SCREENS
Rt +19.000 |
PARAPETLEVER =
Ri +18,000 es a ~~ __[-_ -- -—[; —4-
; DS |

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RL 417.350 * y o |
4 a® a == .
| & & ee S0000" |
. 2 (— PERGOLA
ee = -—{-—. Ff - —_ | —__ ~ +} ~- — - a
RL +14.000 aa! woo ; ~ ” 3
lz aoa. SIA LE | 2
= Pood 3 i ‘Tt =
1 S eg | EE &
GROUND FLOOR a san raw wa _ t= ie } Lik & CARPARKING [[1:I _ POOL DECK S
RU +11.000 EE —
| L TIMBEACLAD _ BALUSTRADE FOR [
= PRIVACY AND TO UMIT CONC. COLUMN RENDERED BLOCKWORK/ PRECAST =
z| STAIR SOFRT GyELOONNE z|
3 =
Ss. 3:
3) =|

(02 \ SOUTH ELEVATION

(oF SCALE: 4:200@ 1

 

“ RENDEROC / PRECAST PARAPET BEHIND PAINTED METAL FASCIA DINCALUME ROOFING AT S? PITCH RENDEROC / PRECAST PARAPET BEHIND |

HEIGHT LIMIT _ _ _
RL +19,000
PARAPET LEVEL _ ~ ee

TRE

RL +17.360 : — : | . : |

                    

 

|
|

FIRST FLOOR
RL +14.000

GROUND FLOOR
RU +11.000

ENTRANCE RAMP
TO BOARDWALK

BOUNDARY [1 8m HIGH FENCE |

   

   

RENDERED SLOCKWORK
/ PRECAST WITH EXPRESSED
TIMBER SATTENS

GLAZED

DOORS GLAZED DOORS

(01\ EAST ELEVATION

\ SCALE: 1:200@A1

 

 

 

 

 

 

‘CUENT

RAPHILL Pty. Ltd.

 

H2o architects Pty Ltd

29 Nonhumberiand Street
Collingwood

Victona 3065 Australia

T61 39417 0900

F 6139417 0911
[email protected]

H2o0

 

PROSECT

PROPOSED MOTEL
PEREGIAN BEACH

 

‘ORAVENG TITLE.

 

 

ELEVATIONS

EAST, SOUTH

‘ALE DRAWN BY
1:200

PROJECT NUMBER, PLOT DATE.
0620 | 10/11/2006
ORAWANG NUMER REVISION

 

 

 

 

A502

4

 

 

Page 55

\ RENDEROC / PRECAST |
Y .

600mm EAVES CVERHANG —y RENDEROC PARAPET PRIVACY SCREEN RENDERED BLOCWORK / PRECAST

HEIGHT LIMIT

RL +19.000

PARAPET LEVEL

RL +18.000

RL +17.350

                  
     

‘SOLID BALUSTRADE FOR
PRIVACY AND TO LIMIT
OVERLOCKING

FIRST FLOOR
RL +14.000

GROUND FLOOR
RL +11,000

‘SOLO BALUSTRADE
FOR PRIVACY AND TO
LIMIT OVERLOOKING

PEREGIAN BOARDWALK DEVELOPMENT

BOUNDARY’

BOUNDARY

(Ot) SECTION AA
ay, SCALE: 1:200@A1

 

 

 

 

 

GuENT

RAPHILL Pty. Ltd.

 

H20 architects Pty Ltd

2 NothumBeriand Street
‘ollingwood

Victoria 3066 Austratia

H20

[email protected]

 

PROECT

PROPOSED MOTEL
PEREGIAN BEACH

 

OAAWENG TLE
SECTIONS

 

 

 

DRAWN BY
PAOEGT NUMBER PLOTOATE
620 10/11/2006

DRAWING NUMBER REVISICN

A601

    

4

 

 

 

 

Page 56

 

 

xm LAND USE SECTION FEES
aw OS

SALE OF DOCUMENTS
Superseded Planning Scheme Documentation 146104 520
Copy of Permit/Approval Letter 32 146120
The Noosa Plan Documentatian 32 146564.1

APPLICATION FEES
Material Change of Use - Code/Impact

Consistent . 32 146102 521
Inconsistent Zeyoo 32 146102 521
Assessment under Superseded Planning Scheme 32 146102 521
Modification to a Development Permit 32 146102 521
Extension of a Currency Period : 32 146102 521
Operational Works - Landscaping 32 146102 521
a Bldg Work assessable against the Planning Scheme 32 146102 521
PRE LODGEMENT REVIEW .
Half Hour 146119 522
x One Hour / 146119 522
ADVERTISING
: Purchase Advertised Applications 31 146110 523
JETTIES
, Jetty Application Fee 146115 524
Jetty Bond 942220 92
BONDS .
Performance Bond 33 95 943200
SIGNS
Registration Fee : 32 137510 222
Gsccs FEE
Search of Land Use Section file 32 146120
Liquor Licensing Request 32 146120

 

TOTAL $ 72%, 4oc0

NAME: Repl Pa, Loef

 

 

 

 

 

 

ADDRESS: of. Urb Sire fe over

fo fe. 739 MALoo uu pate  Lsss
FILE NO: 26/2952 DATE: 79 /oG
RECEIPT NO: ' FP 2¥h ho Signature of TP Officer: Ps be Nog 2
AUTHORITY NO: — A

43 Jocor/ 2<Sz/ ,

Page 57

CALCULATION OF FEES

 

APPLICATION

FEE

TOTAL
FEES

 

MCU - CODE ASSESSMENT
Details of Development

Consistent 1.0
Inconsistent 3.0

FEE CALCULATION

 

q

MCU-INIPACLASSESSMENT

Detatts of Development
P Sun, e 7585

Consistent 1.0
nconsistent 3.0

 

FEE CALCULATION

Ss. C boo
. & g15
2 SFco x Zz

$ 26 y~oo

 

OPERATIONAL WORKS
Details of Development

FEE CALCULATION

 

 

 

TOTAL FEES -

 

 

 

Used in these records

About this file

File size
3.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_2552 - MCU Visitor Accomodation Type 4 [As Published].pdf · 3.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.