Skip to the record
Search everything, all in one place.

Council archive · source document

06/2552 - MCU Visitor Accomodation Type 4 [As Published] · 132006.2552

of 57

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997

Electricity infrastructure

For more Information refer to schedule 2of the [P
lation.

Untess you answered ‘none of the above" to Q18,
the application triggers referral to the agency to
which the easement is aranied in favour of as advice
agency.

Land designated for community
infrastructure

Applications involving development on land
designated for community infrastructure may trigger
this referral.

For more information refer to schedule 2 of the IP
Regulation.

Ifyou answered “YES” to 019, the application
requires assessment by the chief executive of the
department administering the Act authorising the
development for the designated purpose.

If an agency other than the designator is the
assessmant manager for the application, the
designating agency will be a concurrence agency for
the application in relation to this mattar.

 

IDAS Assessment Checklist, Version 18.0, 10 November 2006

18. The application involves: (tick the applicable boxes)

Ow

O (i)

O iii)

OW)

reconfiguring a fot where any part of the lot is -

+ subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994 and the easement is for a transmission grid or supply network under

that Act; or

« situated within 100m of a substation site;
a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if -
« any part of the premises is subject to an easement in favour of a distribution entity or

transmission entity under the Electricity Act 1994 and the easement is for a transmission

grid or supply network under that Act; and

located wholly or partly in the easement;

a material change of use, assessable against a planning scheme and not associated

with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site;
operational work that is filling or excavation assessable against the planning scheme,
not associated with reconfiguring a lot, if - /
« any part of the premises is subject to an easement in favour of a distribution entity or

* any structure or work that is the natural and ordinary consequence of the use is, or will be,

transmission entity under the Electricity Act 1994 and the work is located wholly or partly in

the easement;

e the work is located wholly or partly within 10m of a substation site;

EX] (v)_ none of the above.

Does the application involve development assessable against the planning scheme and on land

designated for community infrastructure?

(i) intended to be supplied by a public sector entity; and
(ii) on land not owned by or on behalf of the State; and

(iii) other than development -
(a) for the designated purpose; or

(b) carried out by, or on behaif of, the designator.

No
Cl Yes

 

Page 6

Used in these records

About this file

File size
3.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_2552 - MCU Visitor Accomodation Type 4 [As Published].pdf · 3.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.