Council archive · source document
06/2552 - MCU Visitor Accomodation Type 4 [As Published] · 132006.2552
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 17.1, 30 October 2006
Form 1 Development Application
IDAS Assessment
Checklist ~~”
(Formerly the “Referrals Checklist”) Z
fi
IMPORTANT NOTE FOR ALL APPLICANTS: 5”
pplication o1
1. This checklist was formerly referred to as the “Referrals Checklist’. Some of the ‘Guides’ to using the ID, fms continue to
“Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately deScribe its function.
2, -Under the IPA and IDAS framework, an application may require assessment by the local Council arfd/or certain Queensland State.efttities (e.g. Environmental Protection
fessment by a Queensland Staté entity and may also assist the applicant to
r to this document as the
Agency, Dept. of Natural Resources, Mines and Water, Queensland Heritage Council etc.).
3. This checklist is provided to assist applicants to determine when an application requires
determine the assessment manager' for the application.
4, Therefore, the completion of alt questions in section 1 of this checklist is mandatofy for all applications (other théh those requiring the completion of Parts A & B only).
5. Iti the responsibility of the applicant to accurately complete this checklist. Oo
6. Depending cn the nature of the application, an applicable State entity may be either the assessment mariager or an IDAS referral agency for the application.
7.
The assessment manager for the application will rely on the information provided in this checklist (as welt as any material lodged in support of the application) to identify
any applicable referral agencies for the application in the Acknowledgement Notice, The assessment manager will also rely on this information when identifying if the
application triggers referral coordination?.
8. — Toassist you in answering the following questions a series of guides are available free from the IPA website www.ipa.qid.gov.au, Guide 25 explains the rote of the IDAS
Assessment Checklist in the IOAS application process, and its relationship to the Form 1 development application.
9. — Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
www jpa.qld.gov.au.
10. Section 2 on page 10 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006.
SECTION 1 - STATE ASSESSMENT (completion mandatory)
Note: The following state assessment triggers apply to development other than for building work assessable against the Building Regulation 2006.
Environmentally relevant activity
For more information refer to Guide 4.
Untess you answered “none of the above" to Q1, the
application requires assessment by the
. The application involves: (tick applicable box/es)
(1 (i) an environmentally relevant activity (ERA) for which a code for environmental compliance
has not been made - complete Part G of Form 1
administering authority’, Oi (ii) a mobile or temporary ERA for which a code of environmental compliance has not been
If an entity, other than the administering authority, is made - complete Part G of Form 1
the assessment manager for the application, the aes
administering authority is a concurrence agency for x (iil) none of the above
the application in relation to this matter.
Note: An application invotving ERA 19 and/or 20 will
also require completion of Part K7 of Form 1 for
approval where an allocation under the Water Act
2000 is required.
State-controlied road matters 2. The application involves: (tick applicable box/es)
esos aeaat Nanette o2.the (1 (i) development on land contiguous to a State controlled road and for -
apoteation roe teferal fo the _Desarmentof (1 (@) material change of use assessable against the planning scheme;
tn certain circumstances DMR will be an advice C1 (b) reconfiguring a fot unless -
agency, while in other circumstances DMR wil be a « the total number of lots is not increased; and
tmte oath > Raglan will assist you to « the total number of lots abutting the State-controiled road is not increased;
determine where OMR is an advice or concurrenca CO (©) operational work (not associated with a material change of use assessable against the
agency for the application. planning scheme or reconfiguring a fot mentioned in (b) above)—
* associated with access to a State-controlled road; or
© for filling or excavation; or
+ involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm that directs stormwater to a
State-controlled road.
1 The assessment manager is responsible for assessing and deciding an IDAS application. The assessment manager for an application is prescribed in schedule 8A of the IPA.
2 For additional information refer to Guide 6 ‘Doas my application trigger the referral coordination process?”
3 The ‘administering authority’ may be either the Environmental Protection Agency, the relevant local government (for a devolved ERA) or the Queenstand Department of Primary Industries and
Fisheries {for a delegated ERA).
4 Land contiguous to a State-centrolled road is defined in schedule 14 of the !P Regulation to meen land - if part of the land is within 100m of the State-controlled road; or that is part of a future State-
controled road.
Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/2552 - MCU Visitor Accomodation Type 4 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.