Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Attachment 7- Site Based Stormwater Management Plan

Attached to the e-mail Response to Information Request - RAL18/0023.

of 46

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
4.3.5 MUSIC Treatment Node Parameters (Post Developed Site)

Bioretention Basins


Figure 4.3 and Figure 4.5 show the parameters for the bioretention basins.




                 Figure 4.3 Bioretention node parameters Street Tree Pit West Hofmann Drive C1




                        Figure 4.4 Bioretention node parameters West Hofmann Drive C2




Site Based Stormwater Management Plan                                                            Page 12 of 20
1856-SBSMP-01_Version 2.0 (April 2019)
Log in to download the original file

Attachment 7- Site Based Stormwater Management Plan.pdf · 5.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.