Council archive · source document
000A88A4.11D.tif · 132003.221037
From the archive 23537 DA - Material Change of Use Special Facilities Resort Complex North Shore. File date in the archive: 2026-10-27 01:48.
From the archive 23537 DA - Material Change of Use Special Facilities Resort Complex North Shore. File date in the archive: 2026-10-22 14:20.
q Cardna . RMBK development. An ADWF of 180 L/EP/day has therefore been adopted for the MEDLI Modelling carried out to ascertain the required waste water disposal irrigation area. Table 5.2 : Noosa North Shore Eco-Tourism Portal ~ ADWF and PWWF Sewage Flows Eco-Cabins 144 0.30 1.50 Lodge Accommodation 85 0.18 0.90 interpretive Centre 10 0.02 0.10 Café 10 0.02 0.10 TOTAL 249 0.52 2.60 Tabie 5.3 provides an indication of the expected amount of sewage to be generated from the proposed development. Table 5.3 : Daily Sewage Flows Eco-Cabins 144 25,920 Lodge Accommodation 85 15,300 Interpretive Centre 10 1800 Café 10 1860 TOTAL 249* 44,820 As indicated above, the proposed Sewage Package Treatment Plant will be designed for a total capacity of 350 EP. 5.1 Proposed Sewerage System The proposed sewerage system will be a conventional gravity system as illustrated in Figure 3. The natural contours of the land will allow for the majority of the eastern section of the proposed os development area to gravitate towards the proposed site for the treatment plant. There is a smail pocket to the southeast that will require the construction of a pump station to service approximately 24 eco-cabins. The proposed alignment of the rising main is along an existing track that traverses the conservation area. Given the existence of this track and the minor nature of the construction of the rising main (potential diarneter of 63/90mm at minimal depth), the impact on the conservation area will be minimal. The western area of the proposed development (i.e. lodge and interpretive centre) will be serviced by a reticulation system that will gravitate towards a pump station to be located on the north-eastern site as indicated in Figure 3. A rising main will deliver the sewage flows from this —* area to the gravity system in the: eastern-area and eventually transport sewage through the reticulation system to the proposed treatment plant. A deiailed analysis will be carried out during the design phase to ascertain the required rising main diameter. However it is envisaged at this stage that the rising main diameters will be 20mm PE for the lodge, interpretive centre pump station and 63mm PE for the south-eastern pump station. Using polyethelene as the rising main material will ensure resistance against the corrosive nature of the existing groundwater. PETRAC LAND HOLDINGS P/L Noosa North Shore Eco-Tourism Portal September 2003 LA7296-03\Repor\FINAL REPORT - 18Sept03.doc Commercial in Contidence Page 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
000A88A4.11D.tifRelated documentApplication case desk ↗
About this file
- File size
- 95 KB (small file)
- File type
- TIF
No other editions are linked here.