Original source · versioned page text
Ecological Assessment Report
Original PDF page 83, section 1. The text section number identifies this passage in the reader.
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES PROPOSAL COMPLIANCE SUMMARY
b) does not contribute to an unacceptable level of b) N/A
illuminance on landward horizons along coastal areas and
known marine turtle nesting beaches.
AO4.4 – The area proposed for clearing is on a
AO4.4 moderate slope of approximately 16 degrees.
Clearing of vegetation does not involve clearing that may Appropriate temporary sediment and erosion control
cause or contribute to hillslope erosion, bank erosion, or measures are to be installed and maintained once
slippage. vegetation clearing has been undertaken. The erosion
control measures are to be retained in place until such
a time as grass or other low flammability vegetation or
treatments have been established.
Connectivity
PO5 AO5 The development does not propose any significant
Development is designed and operated to Development is designed and operated to maintain ecological volume of vegetation clearing. The small amount of
maintain and enhance connectivity between linkages and maximise opportunity for connectivity and the vegetation impacted is considered minor in the
and across ecologically important areas and movement of fauna by: context of the retained extent of vegetation within the
connecting habitat and support unimpeded a) ensuring protection of wildlife refuges; site and the surrounding landscape. The development
and safe movement of terrestrial and aquatic b) maintaining vegetation in patches of the greatest possible will only impact edge based vegetation and will
fauna. size and within the smallest possible edge-to-area ratio; maintain connectivity between and across
c) enhancing connectivity through planting and rehabilitation ecologically important areas and connecting habitat
works, including across property boundaries, to areas of and support unimpeded and safe movement of
national park, state forest or reserve; terrestrial and aquatic fauna.
d) avoiding the creation of physical barriers and safety
hazards (such as roads, pedestrian access and instream
structures) along and within the ecological linkage;
e) providing mitigation measures such as wildlife movement
infrastructure, fauna exclusion and directional fencing,
underpasses/overpasses and traffic calming devices,
signage and lighting; and
f) where offsets are necessary, delivering offsets that
support and enhance ecological linkages.
Waterways and Wetlands
PO6 AO6.1 AO6.1 The development does not include clearing of
The biodiversity and ecosystem values of Development and clearing of vegetation does not occur within: vegetation within the following:
waterways, drainage lines, wetlands and a) a riparian buffer area; a) a riparian buffer area;
adjacent riparian zones are protected by: b) a wetland area; or b) a wetland area; or
30 September 2021 Chris Bentley
Ref: 20-052 Ecological Assessment Report
Proposed Dwelling at 11 Senegal Rise, Doonan
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.