1856-Construction Management Plan (Prelim V2) Oct 2020 - Barlow Shelley · OPW20/0145
Plans and drawings: the text below has words only, no drawings.
4.9 Existing Services It is the Contractor’s responsibility to locate all existing services (including electrical & communications) prior to commencement of works and project and maintain these services for the duration of the works. Should any services require relocation as part of the works, this shall be carried out by an approved contractor for each relevant asset owner. 4.10 Protection of Adjacent Properties All adjacent properties are to be protected for the duration of the works. No works are to encroach on adjacent properties unless the necessary approvals and the land owners’ consent have been obtained. All existing boundary fencing must be maintained. Any damage caused by the Contractor is to be rectified at the Contractor’s expense. It is recommended that photographic evidence of the site and surrounds be collected prior to the commencement of works. 4.11 Workplace Health and Safety It is the contractors’ responsibility to ensure that the site is maintained to a suitable standard to ensure the safety of all workers and site visitors. Adequate safety signage is to be installed in accordance with the relevant legislation. All site visitors are to hold a minimum General Safety Induction White Card or equivalent. 4.12 Public Relations & Complaint Management Signage shall be erected at the site with contact details of the Principal Contractor and Site Foreman. The site supervisor shall make a record of all complaints. Any disputes are firstly to be resolved where possible by the Principal Contractor, else, report them to the Project Manager for clarification of course of action. The Principal Contractor shall also notify Local Authorities and emergency services of the commencement of works, if required. Preliminary Construction Management Plan 12 October 2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
1856-Construction Management Plan (Prelim V2) Oct 2020 - Barlow Shelley.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.