1856-Construction Management Plan (Prelim V2) Oct 2020 - Barlow Shelley · OPW20/0145
Plans and drawings: the text below has words only, no drawings.
6.0 LIMITATIONS OF THIS REPORT This Preliminary CMP has been tailored to report on issues in the area of interest, as detailed above. The information in this report is not to be used outside of the subject area. This Preliminary CMP accurately considers conditions at the area of interest at the time the CMP was developed and based on information supplied by second and third parties. This CMP is to be reviewed if site conditions change in the future. This Preliminary CMP has been undertaken for the specific purposes of Stockwell Development Group Pty Ltd, and is solely for their use. Preliminary Construction Management Plan 14 October 2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
1856-Construction Management Plan (Prelim V2) Oct 2020 - Barlow Shelley.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.