NOOSA COUNCIL 88
EXISTING CONTOURS : 1.0m INTERVALS
FINISHED CONTOURS : 1.0m INTERVALS
APPROVED PLAN
PROPOSED BUILDING PAD
#31 86.50 PROPOSED FINISHED EARTHWORKS LEVEL
#33 5RP809059 PROPOSED TOP OF BANK
4RP809059
OPW22/0104 3 JUN 2022 PROPOSED TOE OF BANK
PROPOSED DRAIN INVERT
As annotated by Council
PROPOSED KERB & CHANNEL
EARTHWORK DEPTHS (1m INCREMENTS)
CUT FILL
EROSION & SEDIMENT CONTROL NOTES
THIS DRAWING IS PROVIDED FOR GUIDANCE ONLY.
REMOVE REDUNDANT FARM DAM FILL INTO ADJOINING LOT, AS PER AGREEMENT WITH LAND #29 THE CONTRACTOR SHALL ASSESS WHAT MEASURES ARE REQUIRED TO
WALL TO SUPPLY COMPENSATORY OWNER, TO SAFEGUARD AGAINST FUTURE ROAD EXTENSION. 6RP809059 SUIT THE PROPOSED CONSTRUCTION METHODOLOGY AND STAGING.
FLOOD PLAIN CUT VOLUME (145m³) THE FOLLOWING EROSION AND SEDIMENT CONTROL MEASURES SHALL
BE USED IN CONJUNCTION WITH THIS PLAN BUT NOT LIMITED TO:
SF SEDIMENT FENCE IECA STD DRG SFB-01 & 02
CATCH DRAIN IECA STD DRG CD-01
SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF
INLET FILTER SOCK IECA STD DRG FS-01
86.50 86.70
87.67 88.44 88.92 91.82 92.78 96.24
SF
SITE ENTRY / EXIT IECA STD DRG EXIT-01
SI RT
BA E
#27
9
S DIV
N
1RP189023
HE TO
8 92.65 96.11
TO M
7
R
SF
ER BE
6
AT /
W IN
EARTHWORK VOLUMES
600 91.82
Y RA
RT D
CUT VOLUME (TO NOMINAL ROAD SUBGRADE) 2,665 m3
DI CH
88.59 FILL VOLUME 15,685 m3 C
T
87.55 88.10
CA
SF
NOTES
86.50 86.70
1. NO ALLOWANCE MADE FOR STRIPPING.
HES BASIN 2. NO ALLOWANCE MADE FOR BULKING OR COMPACTION.
REFER DETAIL 3. ALLOWS FOR A 280mm DEPTH OF ROAD PAVEMENT BOXING.
SF
SF
WARNING
94.27
OVERHEAD POWER
92.53
IN VICINITY OF WORKS DIAL BEFORE
92.04
YOU DIG
SF
86.70 87.35 87.50 87.70 87.76 89.23 89.79
CATCH DRAIN / BERM TO DIVERT
DIRTY WATER TO HES BASIN
www.1100.com.au
#23 IT IS THE RESPONSIBILITY OF THE FOREMAN TO CONTACT
1 20SP316902 THE RELEVANT SERVICE AUTHORITIES TO ASCERTAIN THE
EXACT LOCATION OF SERVICES PRIOR TO CONSTRUCTION.
2
SF
10 5 4 3
SF
86.70 87.35 87.77 87.97 88.03 89.50 90.06 92.08 92.86 94.38
SF SF SF SF SF SF SF SF SF SF SF
SF
C C
A
FREE
DIRECT RUNOFF FROM SWALE AWAY -
FROM THE PROPERTY BOUNDARY DRAINING
ALL EARTHWORK AREAS ARE TO BE TOPSOILED AND STABILISED AS
CONSTRUCT OVERLAND FLOW SWALE SOON AS PRACTICAL FOLLOWING BULK EARTHWORKS OPERATIONS
WITHIN LOT 10. REFER SECTION A. REFER TO CONDITIONS FOR
PROVIDE FILL OVER SHALLOW SEWER, E&SC REQUIREMENTS
ENSURING THE FINISHED SURFACE FREE
DRAINS TO THE WEST. REFER DRG C400. #19
4RP35077
32 5.7 1.0 1.2 3.5 1.4
CONSTRUCT TYPE B HIGH EFFICIENCY SEDIMENT (HES) BASIN AND INFLOW
3.0 EASEMENT
SHOWGROUNDS
EMT
POMONA
RP BDY
0.2
MIXING FOREBAY AS PER STANDARD DRAWING IN APPENDIX A OF EXISTING SURFACE
1.5 1.5 SEDIMENT MANAGEMENT ON CONSTRUCTION SITES. INLET LEVEL
LOT 10 FSL
BASIN SIZE : 897m³, BASE 32m x 11m x 1.85m DEEP
1.2
1
MIXING ZONE : 69m³, BASE 11m x 3.5m x 1.20m DEEP
1:
1:
1.85
1:3
1
1:
1
CATCHMENT AREA : APPROX 1.97 Ha
NATURAL SURFACE SETTLING ZONE SIZE : 690m³ (350m³/Ha)
\\tod-fs02\dropbox\2021\21556SD2_25 Pavilion St, Pomona - Subdivision\4.CADD\#ACAD\2.OPW\#21556_CI_OPW.dwg
SEDIMENT STORAGE SIZE : 207m³ (30% SETTLING ZONE) SETTLING ZONE 32 x 11 BASE LEVEL SPREADER MIXING ZONE
DEPTH VARIES. 150mm NOM. TOPSOIL & TURF SWALE TOTAL SEDIMENT BASIN SIZE : 897m³
BASIN TO BE RETAINED AS A FARM SETTLING VOLUME 690m³ RL 0.2m BELOW INLET LEVEL 3.5 x 11 BASE (69m³)
WITHIN EASEMENT
MIXING ZONE SIZE : 69m³ (10% OF SETTLING ZONE) DAM AT THE COMPLETION OF WORKS SEDIMENT STORAGE 207m³
TOTAL BASIN VOLUME 897m³
OVERLAND FLOW SWALE DETAIL
SECTION A HIGH EFFICIENCY SEDIMENT (HES) BASIN DETAIL
SCALE 1:50 - NOT TO SCALE
C
REFER DRG NO C001 FOR PROJECT NOTES
COPYRIGHT © Associated Consultants Client Drawn Verified Project Drawing Title Scale Sheet Size
This drawing is subject to
copyright in accordance with
SURVEYORS & PLANNERS JNE DEVELOPMENTS P/L JF DR
25 PAVILION ST, POMONA EARTHWORKS PLAN AND 1: 500 A1
LAND SURVEYING DYNAMICS (LSD) Designed Verified
the agreement between TOD
Consulting Pty Ltd (tc) and tc's
p 0412 666 516 JF / DR DR RESIDENTIAL SUBDIVISION EROSION & SEDIMENT CONTROL Drawing Number
client. This drawing shall only
be used for this specific project.
C 25.05.22 IR : ITEMS 2, 5 & 7 (SWALE, LOT FALL & HES) JF
e [email protected] Approved RPEQ No RP DESCRIPTION 21SP316902 21556-C100
This drawing shall not be used w www.landsurveyingdynamics.com Noosa: 07 5449 9600 Sunshine Coast: 07 5329 3190 NOLDS
D. REYNOLDS 9072 LOCAL AUTHORITY NOOSA SHIRE COUNCIL
B 22.04.22 EXTENTS OF FILL OVER SHOWGROUND SEWER JF MCU APPROVAL - HORIZ DATUM MGA 2020 0 10 20 30 40 50 60 Sheet Revision
for construction until marked as PO Box 61, Noosaville, QLD 4566 Signed
'Issued For Construction' in the
revision description.
A
Rev
11.04.22
Date
OPW SUBMISSION
Revision Description
JF
Drawn
[email protected] www.todconsulting.com
ABN 39 128 805 336 25.05.22
ROL APPROVAL
OPW APPROVAL
RAL21/0017
-
VERT DATUM AHD
RL DATUM (PSM112428) 98.616 MEASUREMENT BAR - INCREMENTS IN mm 3 of 14 C
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.