Original source · versioned page text
Town Planning Assessment Report
f) promotes a sense of
community identity and
belonging;
g) promotes a variety of
streetscapes;
h) provides for a high level of
amenity, having regard to
potential noise, dust, odour and
lighting nuisance sources;
i) integrates
prominent site features
including landmarks,
native vegetation and views
into the design;
j) discourages crime or antisocial
behaviour by facilitating casual
surveillance of streets, paths
and public open space;
k) avoids the sporadic or out-of-
sequence creation of lots; and
l) protects and
enhances ecologically
important areas and provides
for the clustering of lots into
cleared areas.
Infrastructure No acceptable outcome provided PO10 – Complies
PO10 The future dwelling houses can
Development accommodates and be serviced by appropriate
provides for the efficient and timely urban infrastructure.
delivery of infrastructure appropriate to
the site’s setting and intended use.
PO11 No acceptable outcome provided PO11 – Not Applicable
Roadway and pathway layout are The development does not
predominantly rectilinear with a high Editor’s Note— Further detail on involve any roadways or
degree of permeability. traffic and the road network is pathways.
addressed in Part 9.4.8 Transport
Code
Infrastructure and Services
PO12 AO12.1 AO12.1 – Complies
New lots are located, sized and All lots are connected to power The sites will be connected to
configured so as to ensure each lot is supply and telecommunications power and
capable of being serviced by appropriate services and where located within telecommunications supply.
levels of infrastructure including: the Urban boundaries, power supply
and communications infrastructure
a) power supply; are provided underground.
b) telecommunications; and
c) where within Local Plan Areas AO12.2 AO12.2 – Complies
d) reticulated water supply; If located in a water service area Each lot will be connected to
e) reticulated sewerage; and each new lot can be connected to reticulated water supply
f) stormwater drainage. Unitywater’s water supply network.
AO12.3 AO12.3 – Not Applicable
If located in a sewerage service area Each lot will be connected to
each new lot can be connected to reticulated sewer supply.
Unitywater’s sewerage network.
Page 14 of 23
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.