Skip to the record
Accept no substitutions.

Original source · versioned page text

Town Planning Assessment Report

of 23

Page text shows just the words. Original shows the document exactly as it was published.

                                           Government Infrastructure Plan in
                                           Part 4 such as:

                                               a)   children’s play facilities
                                                    catering for various ages
                                                    including a soft fall surface
                                                    where required and a
                                                    shade cover over play
                                                    equipment;
                                               b)   seating;
                                               c)   picnic table/s with seats;
                                                    and
                                               d)   landscaping.

                                           Editor’s Note— Further detail on
                                           Landscaping is addressed in
                                           Part 9.4.5 Landscaping Code

PO19                                       AO19.1                                   AO19.1 – AO19.3 – Not
Land provided for active recreation        Active parkland is of a usable shape     Applicable
areas is of a physical standard and        free of irregular boundaries.            The proposed development is
condition suitable for the intended uses                                            not required to provide active
and is not subject to physical or other    AO19.2                                   parkland.
constraints including contamination,       Active parkland is located on land
environmental or biophysical constraints   that is exclusive of—
or legislative protection that would
encumber its use.                              a)   flood inundation below the
                                                    20% AEP (1:5
                                                    year ARI level);
                                               b)   land affected by
                                                    stormwater or overland
                                                    flow discharge from
                                                    adjacent allotments;
                                               c)   drainage reserves and
                                                    detention basins, which
                                                    cannot be shown to safely
                                                    and effectively contribute
                                                    to the network of parks
                                                    and open space areas;
                                               d)   land with a slope, or
                                                    subject to cut or fill with a
                                                    batter slope, that exceeds
                                                    a slope of 15%;
                                               e)   areas of land less than 15
                                                    metres wide, such
                                                    as access and service and
                                                    utility easements;
                                               f)   land required to serve
                                                    primarily as a buffer area to
                                                    any existing development
                                                    or major transport corridor;
                                                    and
                                               g)   power easements.

                                           AO19.3
                                           At least 10% of the total open space
                                           provision for active parkland is
                                           exclusive of flood inundation below
                                           the 1% AEP (1:100 year ARI level or
                                           the highest recorded flood level),
                                           whichever is the greatest.


                                                                                                       Page 18 of 23
Log in to download the original file

Town Planning Assessment Report.pdf · 3.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.