Table 1 - Part 6 Cooroy Specific Outcomes [As Published] · 132007.2398
Column 1 Column 2 Column 3
Specific Outcomes Probable solutions (if code assessable) Design Response/Comments
O22 The Noosa Trail Network in the locality is 3, including severing of existing or future
supported by overnight camping facilities, linkages;
homehosted accommodation and signage, OR
allowing local residents and visitors to experience S21.3 Alternative linkages to those indicated in
the natural values of the area and to access key Schedule 5 – Map 3 are provided;
destinations including—
AND
a) the town of Cooroy;
b) Lake Macdonald; S21.4 Linkages to the Noosa Trail Network are
c) the Botanic Gardens; and designed and constructed in accordance with—
d) State forests, conservation parks and
other recreation facilities in the locality. a) Australian Standard 2156.1 Walking
Tracks Part 1: Classification and Signage
to a minimum of a Class 4 Standard; and
b) Australian Standard 2156.2 Walking
Tracks Part 2: Infrastructure Design;
S22.1 No solution provided
Pedestrian and bicycle pathways S23.1 Pedestrian and bicycle pathways are Not applicable – the site is not affected by the
O23 Safe and convenient pedestrian and bicycle provided and retained where indicated in overlays on Map 2.
pathways are provided and retained between and Schedule 5 – Map 2;
around key destinations, including— PSP 20 indicates that a contribution of 1 EP per
a) between Cooroy and Tewantin; AND bed is applicable for nursing homes. It is
b) between Cooroy and the Noosa Botanical respectfully suggested that this rate should be
Gardens; and S23.2 Contributions toward a Pathways heavily discounted as residents in nursing
c) within and around the town of Cooroy. Network are provided in accordance with homes are unlikely to use pathway networks
PSP20. external to the site and it is highly improbable
that they will be using bicycle paths.
Protection of Lake Macdonald water supply S24.1 Within the Lake Macdonald catchment The site is not within the Lake Macdonald
O24 Development does not adversely impact on area shown on Natural Resources Overlay Map catchment area.
the Lake Macdonald water supply. OM3.5, buildings and other structures are not
AND located below 98.5m AHD.
O25 The number and location of access points to
watercourses is controlled and managed to No solution provided.
prevent adverse impacts on water quality in Lake
Macdonald;
S25.1 No solution provided
AND
O26 Key nodes are established and appropriately
managed at the following locations and include S26.1 No solution provided
facilities such as parking and picnic areas—
a) the northern part of the lake, in the vicinity
of the water treatment plant, scouts and
Table 1 – Code Compliance Checklist – Part 6 - Cooroy Locality Specific Outcomes 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Table 1 - Part 6 Cooroy Specific Outcomes [As Published]Related documentApplication case desk ↗
About this file
- File size
- 143 KB (small file)
- File type
No other editions are linked here.