Ferg & Roeds Consulting Pty Ltd was commissioned to provide a preliminary services and
statement for the subject site at 4 Hill St, Tewantin. On a property legally described as Lot 6 on
RP53080 in the Noosa Shire Council local government area. To support the submission a
Development Application of a Reconfiguration of Lot for (1 into 2).
This statement has been written to demonstrate how the available services and lawful point of
discharge will be provided for each proposed Lot.
A NSC & Unitywater Infrastructure Mapping GIS Investigation has been completed for the site
along with detail survey of the site and its surrounding area. The lot has an existing sewer main
running through the rear of the lot and continues to the north. Existing overhead power and water
main are found within the verge on the opposite side of Hill St and Telstra was found in within the
verge or the lot frontage. Each lot will achieve PUP connection and lawful point of discharge via
the following methods.
Lot 3 will retain the existing dwelling and overhead power connection. The lot will have a new
sewer connection which runs from the existing manhole on the north-western boundary of lot 4
into the site, the existing house drain will be modified to suit new property connection. The
existing new water service and meter will be retained. Lawful point of discharge will be provided
by retaining the existing kerb adapter that the roofwater from the dwelling discharges to. The
existing driveway crossover on the western boundary will remain for the lot.
Lot 4 will have a new electrical connection, whether it will be overhead, or underground is still to
be determined. A new sewer connection will be provided which connects into the manhole in the
north-western corner of the lot. A new water service will be run form the water main on the
opposite side of Hill St and new water meter provided on eastern boundary of the access handle.
The existing driveway crossover will remain for the access handle. The lot falls to the rear and
there is no opportunity to connect to downstream inter allotment drainage. In order to provide
Lawful point of discharge for the lot it is proposed to discharge roof water from new dwellings on
Lot 4 to a new soakage pit. The soakage pit will have a volume of 4m3. The soakage pit is required
to be located at least 3m from the property boundaries.
Ferg & Roeds Consulting
4 Misty Lane
Cooroibah, QLD 4565, Australia
T +61 420 305 181 E [email protected]
www.fergnroeds.com Ferg & Roeds Consulting Pty Ltd ABN 60 646 316 056
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 1 page
Page 2
Building Communities
for Future Generations
The Queensland Urban Drainage Manual (QUDM 2017) classifies soakage pits as an acceptable
method of discharging stormwater from a property (Level 1 drainage solution). The proposed
soakage pits therefore constitute the lawful point of discharge for each lot. The proposed
stormwater discharge solution is not expected to create an adverse impact to the downstream
neighbouring property.
All lots will have an NBN connection agreement put in place to ensure new and existing lots have
NBN.
The proposed Preliminary Servicing Plan demonstrating the lawful point of discharge is
represented on the engineering drawing 220601-SP01-
Kind Regards,
Nathan Flanders
Engineering Manager