‘INTEGRATED PLANNING ACT 1997
Development within the limits of a
port
For more information refer to Guide 18. For
information about prescribed tidal work refer to
Guide 24.
Ifyou answered "YES" to Q12, the application
triggers referra! to the Port Authority.
The Port Authority is a concurrence agency if the
developrnast is -
within 200m of a shipping channel or an entry
and exit shipping corridor for the port
within 000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoil
grounds,
* within 1000m of a planned port facility
identified in a tand use plan approved under
the Transport infrastructure Act 1994.
In all other situation the Port Authority is an
advice agency.
IDAS Assessment Checklist, Version 20, 2 April 2007
12. Does the application involve development below high water mark’® and within the limits of a port
under the Transport Infrastructure Act 1994?
I NO
(J YES - complete Part M of Form 1, or Part P of Form 4 if the work is prescribed tidal work
Marinas
For more information refer to Guide 18. For
information about whether a marina is prescribed
tidal work refer tp Guide 24. The local
government is the assessment manager for all
prescribed tidal work.
Ifyou answered “VES" to Q13, the application
triggers referral to Queensland Fire and Rescue
Service as an advice agency.
13. Does the application involve operational work that is tidal work for a marina’? with more than 6
vessel berths?
EJ NO
[CUYES - complete Part M of Form 1, or Part P of Form 4 ifthe tidal work is prescribed tidal work
Tidal works in strategic port land tidal
areas
For more information refer to Guide 18,
Unless you answered “NO” to Q14, the relevant
ost Auorty s the assessment manager forthe
application and the E:
Agency (EPA) and Queenstand et (QT)
are concurrence agencies for the appfication.
Heritage
For further information refer to Guide 19.
'tyou answered “YES" to Q15, the application
triggers referral to the Queensland Heritage
Council as concurrence agency for the
appfication,
Unless you answered “none of the above” to
Q15(b), the application involves referral to the
Environmental Protection Agency as an advice
e@ agency for the application
14. Does the application involve tidal works within a strategic port land tidal area?
XJ NO
(J YES - complete Part M of Form 1
15. Does the application involve development in a heritage registered place as defined under the
cuoensiand Heritage Act 1992?
—J NO
(21 YES - complete Part C of Form 1
15(b)The application involves: (tick applicable boxes)
{)() — amateriat change of use assessable against the planning scheme and the lot shares a
common boundary with a protected area or registered place under the Queensland
Heritage Act 1992;
Ci) reconfiguring a lot if the lot shares a common boundary with a protected area or
registered place under the Queensland Heritage Act 1992;
(J (ii) none of the above.
+ Declared catchment areas
+ For mora information, including a list of the
declared catchment areas within Queensland,
refer to Guide 13.
Unless you answered "none of the above" to
Q16, the application requires assessment by the
Department of Natural Resources and Water
(NRW.
(fan agency other than NRW is the assessment
Manager for the application, NRW is a
concurrence agency for the application in
relation to this matter.
16. The application is in an area declared to be a catchment area under the Water Act 2000 and
involves: (tick the applicable box/es)
CQ) reconfiguring a fot if any tot resulting from the reconfiguration is less than 16 hectares;
(J (ii) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994;
(ii) none ofthe above
18 High water merk is defined in the Coastaf Protection and Management Act 1995 and means the ordinary high water merk at spring tide,
19 Marina is defined in the Transport Operations (Maritime Poflution} Regulation 1995.
20 Strategic port land tidal areas are the areas genersily 50 metres seaward of high water mark adjacent to strategic port land.
Page §
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1571 - Operational Works - Carparking & Access, Stormwater Drainage & Excavation [As Published]Related documentApplication case desk ↗
0015D14F.001.pdfRelated documentPublic source context ↗
About this file
- File size
- 2.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.