Council archive · source document
07/1571 - Operational Works - Carparking & Access, Stormwater Drainage & Excavation [As Published] · 142007.1571
ot INTEGRATED PLANNING ACT 1997 Part E, Version 2.1, 18 June 2007
Eormpi[DevelopmenttApplication idast
Operational &/or building work &%
assessable against a local government’s planning scheme =
Completion of alt question on Part € is mandatory for all applications involving the assessment of operational work and/or building work assessable
against a local government's planning scheme (including detailed engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual
design plans for engineering & building work when the application dees not involve assessment of a material change of use of premises at the same time).
Nature of the works 1. The application is seeking approval of (tick one (1) or both if applicable):
The types of work that are assessable against [7] Building work assessable against a planning scheme - provide details of the aspects of building
a planning scheme are determined by the ital ‘ . 1 ‘
scheme fora particular local government and work (e.g. building height greater than 8.5m; building work on high landslip risk area)
will vary across the State. [ ]
S-7 To determine the types of work that are [X] Operational work assessable against a planning scheme - provide details of the nature of the
assessable under a particutar planning operational work (e.g. roadworks; landscaping; drainage works; stormwater; water infrastructure; sewerage
anere orast the relevant local infrastructure; earthworks; clearing vegetation; signage)
The information in Q2 is for landscaping, carpark & access, stormwater drainage and excavation of materials to fill
statistical and planning purposes, another site
2. Is the application for operational work involving the creation of new lots?
JNO [DYES - specify number of new lots to be created below
3. Does the proposal involve the construction of a canal that is associated with reconfiguring a lot?
INO C1 Yes
Nature of the application 4. This application is for: (tick one (1) or both if applicable)
A development permit authorises imi - ide ‘i
daveloptent's ocur, whoa prelisnary O Preliminary approval provide details of the type of work eg. roadwork, stormwater, water and sewerage
approval is a step in the approval process -
and does not authorise development to occur. [ |
EX) Development permit - provide details of the type of work eg. roadwork, stormwater, water and sewerage
infrastructure, ete
O | Roadwork, stormwater, water and sewerage infrastructure ‘|
5. Are the works subsequent to a previous development permit or preliminary approval?
NO (J YES - provide details of all previous approvals
List of approval reference/s Date approved Oate approval lapses
I / / I
Portable Long Service Leave levy (if (6. Is payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?
a 9, iy
Prior to issuing a development permit for the YES - complete O7
works, the assessment manager is required (INO - @7, 8 & 9 donot apply
by law to “sight an approved form, issued by \
Qleave, which signifies thatthe PLSL levy |7. Has the PLSL levy been paid? ‘
Pe tate aomaon refer to O YES ~ complete a8
Jn. cleave. au NO ~ the applicable levy must be paid before a development permit can be given for the works
8. How much was paid?
| J
9. Whatis the receipt number of the payment?
| J
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1571 - Operational Works - Carparking & Access, Stormwater Drainage & Excavation [As Published]Related documentApplication case desk ↗
0015D14F.001.pdfRelated documentPublic source context ↗
About this file
- File size
- 2.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.