Council archive · source document
08/0052 - MCU - Detached House [As Published] · 132008.52
INTEGRATED PLANNING ACT 1997
Part E
Building &/or operational work assessable against a planning scheme
(Nature ofthe works “ ee Ra Be |
1. Is 5 application seeking approval of building work assessable against a planning scheme?
jo
1 Yes
1a) al is the application seeking approval for more than one type of building work?
No = Complete Table A
LJ Yes ~ Complete a new Table A for each type of building work
Table A
(i) What aspect of the building work is made assessable by the planning scheme (e.g. building height greater than 8.5m, building work on high
fandsifp risk area)?
[building Worle wot complying wiv teeeplabte SowRen)4]
Pepe ce Cote. [~ pon ae- Bh or Ct,
(i) “ye subsequent to a previous we elonert Pmt or Foiminey Orel another aspect of development? le 5 fe
No tw.
Yes — Complete Table A(a)
Table A{a)
af
was ua, LM [vate Date approved: | Date approval lapses.
__GENERATE ANOTHER TABLE A
2. ey application seeking approval of operational work assessable against a planning scheme?
No
OO sYes
2(a) ‘If yes, is the application seeking approval for more than one type of operational work?
No — Complete Table 8
Cs Yes - Complete a new Table B for each type of operational work
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0052 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.