Council archive · source document
08/0052 - MCU - Detached House [As Published] · 132008.52
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007 REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT — this question only applies for applications not also seeking approval ta carry out operational work, 2.13 Doerr proposed use involve the removal, destruction or damage of marine plants under the Fisheries Act 1994? lo OD Yes If yes, indicate what the proposed operational work is reasonably necessary for: (Tick applicable box/es) ¢ — The removal, destruction or damage of dead marine wood on unallocated State land, other thanina [7] No [] Yes wild river area, for trade or commerce ¢ The maintenance of existing structures, including, for example, the following structures, ifthey were []No [1] Yes constructed in compliance with all the requirements, under any Act, relating to a structure of that type - + boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming enclosures and weirs; « existing drainage structures; « existing powerlines or associated powerline infrastructure * — Educational or research purposes or for monitoring the impact of development on marine plants (No [1 Yes e Other purposes LINo [] Yes Ifyes to Other purposes above, does a development permit exist for that proposed operational work? Yes [LNo lfno, has approval been sought in a separate application? D Yes No - This application must atso be for operational work for removing, destroying or damaging marine plants under Hersenign teed), iP Regutatien fe leon Page 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0052 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.