Council archive · source document
08/0052 - MCU - Detached House [As Published] · 132008.52
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkist, Version 21.0, 3 September 2007
TAKING OR INTERFERING WITH WATER; WILD RIVER AREA
4.5 | Is any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with artesian water?
CINo C1 Yes - (Compete Farm 1, Part K,) This appication requires assessment by the Department of Natural Resources and Water (NRW). If NRW is not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IBA schodute 8 pat‘ ta P Reguiece schedite 2 table 2 item 8. 1P Reguanne sonenide f, patl 2 table 4 item 2, APY Rivers cody (hike the cade does net currontty
CONE appicatt PAINS Ming wih aftowian water),
4.6 | |Is any of the proposed operational work to allow, under the Water Act 2000, for taking overland flow water?
CINo (1 Yes - Answer (a) and (b) betow
(a) Are the operations mentioned as assessable development in the following?
¢ — Awater resource plan under the Water Act 2000 (ino §(CYes
e Aregulation under the IPA or another Act (No O Yes
If yes to either or both - (Complete Form 1, Part Ks). This application requires assessment by the Department of Natural Resources and Water
(NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
(b) {s any of the proposed operational work mentioned as assessable in a wild river declaration and to be carried out in a wild
fiver area declared under the Wild Rivers Act 2005?
CNo 1 Yes - Depending on the purpose of the operational work and its proposed location in the wild river area, assessment may be required for
the purposes of the Wadd Rivers Act 2005. Also, in certain circumstances an application for operational work is taken to be not
properly made and the Assessment Manager must refuse to receive it. (Complete Form 1, Part Kaif an application Is made.)
IPA, scree 4, p. mibte 4, tent Yel: 1? Regulation, schedute 2, table 2, hem 8: 1P Reguinten, schadue 1, part 3, ranle 4, dem 3 Water Avi 2000, sechan 9684 (wike ver are} Wid
Rivers Act 2005. s 43,
4.7 | Is any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with subartesian water?
C1No DYes
If yes, are the operations mentioned as assessable development in the follawing?
e Awater resource plan under the Water Act 2000 (No C1 Yes
¢ — A regulation under the IPA or another Act Lino (ClyYes
Hf yes to either or both- (Complete Form 1, Part Ki) This application requires assessment by the Department of Natural Resources and Water
(NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPS, schectte 8, part 1, lable 8, dem Yok). IP Ragrtation, scherkiie 2 tate 2, dem & 1 Requiaten, schociie 1 jrart 2 tbe 4, tent 3 Water Act 2000, section 9664 (wil ver arsayiota no cunemt WA!
iver denkaration hlantiies taking or mtartaring with suiariasan water as ascassebie} Wi River cod (Note (he code does not nurentty contain aonicahie pmvisions far suhartesian wre).
4.8 | ls any of the proposed operational work to allow, under the Water Act 2000, for interfering with overland flow water
(No L1 Yes - Answer both (a) and (b) below
{a) Is the proposed operational work to be carried out in a wild river area declared under the Wild Rivers Act 2005?
oO Yes - Depending on the purpose of the operational work and its proposed location in the wild river area, assessment may be required for the
purposes of the Wild Rivers Act 2005. Also, in certain circumstances an application for operational work is taken fo be not properly made
and the Assessment Manager must refuse to receive it. (Complete Form 1, Part Kr if an application is made.)
LINo
{f no, are the operations mentioned as assessable development in the following?
e A water resource plan under the Water Act 2000 CINo C1 Yes
* — A regulation under the IPA or another Act CINo C1 Yes
If yes to either or both - (Complete Form 1, Part Kio) This application requires assessment by the Department of Natural Resources
and Water (NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
(b) ts the interfering with overland flow water proposed in an area declared under the Water Act 2000 to be a drainage and
embankment area (other than a wild river floodplain management area) and declared to be assessable under that Act?
oO No oO Yes - (Complete Form 1, Part Kio) This application requires assessment by the Department of Natural Resources and Water
(NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA, schectule 8, parr 1, rable 4, toms oy(i) and Xe), 1° Requlanan, schaokile 2, tala 2, tens 9 1P Reguiation, schedule 1. pevt 3, table 4, Hem JA: Water Ant 2000, section S888 (wld river ampat
4.9 | Is the proposed operational work for the following?
¢ — For the construction of a referable dam as defined under the Water Act 2000 No [1 Yes
* To increase the storage capacity of a referable dam by more than 10% (No E1Yes
If yes to either or both - (Complete Form 1, Part Ks) This application requires assessment by the Department of Natural Resources and Water (NRW). I-NRW
is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA, schecta &, pait 1 table 4. item 4: 1? Regulation, schedule 2, fania 2, tem 14.
Page 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0052 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.