Council archive · source document
08/0052 - MCU - Detached House [As Published] · 132008.52
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
WILD RIVER AREA
4.15 | Is any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
LNo OYes
If yes, is the proposed operational work for the following and also declared under the wild river declaration for the areas to be
assessable?
¢ Agricultural activities as defined under the Wild Rivers Act 2005 DNo (Yes
* — Animal husbandry activities as defined under the Wild Rivers Act 2005 (No (Yes
If yes to either, is any part of the premises in the wild river high preservation area?
oO Yes - An application for the operational work will be taken to be not properly made and the Assessment Manager must refuse to receive it,
DNo
If no, is the proposed use in relation to the production of a high risk species as defined under the Wild Rivers Act 2005?
oO Yes - An application for the operational work would be taken to be nol properly made and the Assessment Manager must refuse to receive it.
oO No - Uniess the application is consistent with any property development plan applying to the fand, the Assessment Manager must refuse to
receive it (Complete Form 1, Part Q if agriculture. Complete Form 1, Part R if animal husbandry} Subject to the declaration for the
relevant wild river area, this application requires assessment by the Department of Natural Resources and Water (NRW). If NRW is not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA, schodute 3 part! tage 4, dem 10: IP Regulation. schaduin 3, tater 2. dem 37; Wid Rivers Act 2005, sections 42, 43a
STATE-CONTROLLED ROAD
4.16 | |s any part of the premises within 100m of a State-controlled road; or part of a future State-controlled road?
OONo Yes
{f yes, is what the proposed operational work is associated with (Tick applicable box/es)
¢ Amaterial change of use that is assessable under the planning scheme [No ClYes
* — Reconfiguring a lot that does not increase the total number of lots and does not increase the total [No [[] Yes
number of lots abutting the State-controlled road
¢ Other (No (Yes
\f yes to Other, and answers to questions in this section of the checklist indicate the proposed operational work is
assessable under IPA, schedule 8 - Answer (a) - (c) below.
(a) ts any of the proposed operational work associated with access to a State-controlled road?
CINo Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
(b) Is any of the proposed operational work for filling or excavation?
(No D1 Yes
If yes, is the operational work proposed in a future State-controlled road defined by route?
No - This application must be referred to the Department of Main Roads (DMR) as Advice Agency.
oO Yes - This application must be referred to the DMR as Concurrence Agency.
{c) Does any of the proposed operational work involve the redirection or intensification of site stormwater from the land,
through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controlled road?
CINo D1 Yes
If yes, is the operational work proposed in a future State-controlled road defined by route?
oO No - This application must be referred to the Department of Main Roads (DMR) as Advice Agency.
LD Yes - This application must be referred to the DMR as Concurrence Agency.
1P Regulation, schedule 2, latte 2, fam 4
Page 31
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0052 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.